{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,1]],"date-time":"2026-02-01T05:13:55Z","timestamp":1769922835535,"version":"3.49.0"},"reference-count":21,"publisher":"American Society of Civil Engineers (ASCE)","issue":"11","content-domain":{"domain":["ascelibrary.org"],"crossmark-restriction":true},"short-container-title":["J. Constr. Eng. Manage."],"published-print":{"date-parts":[[2014,11]]},"DOI":"10.1061\/(asce)co.1943-7862.0000888","type":"journal-article","created":{"date-parts":[[2014,6,25]],"date-time":"2014-06-25T15:09:32Z","timestamp":1403708972000},"update-policy":"https:\/\/doi.org\/10.1061\/do.news.20190416.0001","source":"Crossref","is-referenced-by-count":15,"title":["Work Zone Planning in Pavement Rehabilitation: Integrating Cost, Duration, and User Effects"],"prefix":"10.1061","volume":"140","author":[{"given":"Jo\u00e3o","family":"Morgado","sequence":"first","affiliation":[{"name":"Researcher, Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisbon, Portugal (corresponding author)."}]},{"given":"Jos\u00e9","family":"Neves","sequence":"additional","affiliation":[{"name":"Assistant Professor, Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisbon, Portugal."}]}],"member":"30","reference":[{"key":"e_1_3_1_2_1","doi-asserted-by":"crossref","unstructured":"Benekohal R. F. Kaja-Mohideen A. Z. and Chitturi M. V. (2004). \u201cMethodology for estimating operating speed and capacity in work zones.\u201d Transportation Research Record 1883 Transportation Research Board Washington DC 103\u2013111.","DOI":"10.3141\/1883-12"},{"key":"e_1_3_1_3_1","volume-title":"Modelling road user and environmental effects in HDM-4 (HDM-4 Reference Volume 7)","author":"Bennett C. R.","year":"2001"},{"key":"e_1_3_1_4_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-947X(2005)131:10(780)"},{"key":"e_1_3_1_5_1","doi-asserted-by":"publisher","DOI":"10.1002\/atr.5670360202"},{"key":"e_1_3_1_6_1","doi-asserted-by":"crossref","unstructured":"Chitturi M. V. Benekohal R. F. and Kaja-Mohideen A. Z. (2008). \u201cMethodology for computing delay and user costs in work zones.\u201d Transportation Research Record 2055 Transportation Research Board Washington DC 31\u201338.","DOI":"10.3141\/2055-04"},{"key":"e_1_3_1_7_1","doi-asserted-by":"crossref","unstructured":"Collura J. Heaslip K. P. Moriarty K. Wu F. Khanta R. and Berthaume A. (2010). \u201cSimulation models for assessment of the impacts of strategies for highway work zones eight case studies along interstate highways and state routes in New England.\u201d Transportation Research Record 2169 Transportation Research Board Washington DC 62\u201369.","DOI":"10.3141\/2169-07"},{"key":"e_1_3_1_8_1","unstructured":"Costa C. B. Corte J. M. D. and Vansnick J. C. (2005). \u201cM-MACBETH Version 1.1 User\u2019s Guide.\u201d \u2329http:\/\/www.m-macbeth.com\/help\/pdf\/M-MACBETH_User\u2019s_Guide.pdf\u232a (Jun. 3 2011)."},{"key":"e_1_3_1_9_1","doi-asserted-by":"crossref","unstructured":"Daniels G. Stockton W. R. and Hundley R. (2000). \u201cEstimating road user costs associated with highway construction projects - Simplified method.\u201d Transportation Research Record 1732 Transportation Research Board Washington DC 70\u201379.","DOI":"10.3141\/1732-09"},{"key":"e_1_3_1_10_1","doi-asserted-by":"publisher","DOI":"10.3328\/TL.2010.02.03.175-186"},{"key":"e_1_3_1_11_1","unstructured":"Federal Highway Administration (FHWA). (2013). \u201cQuickZone: A new work zone delay estimation tool.\u201d \u2329http:\/\/www.ops.fhwa.dot.gov\/wz\/traffic_analysis\/quickzone\/index.html\u232a (Sep. 30 2013)."},{"key":"e_1_3_1_12_1","volume-title":"Decision analysis for management judgment","author":"Goodwin P.","year":"2004"},{"key":"e_1_3_1_13_1","unstructured":"Haas R. (2001). \u201cReinventing the (pavement management) wheel.\u201d Proc. Fifth Int. Conf. On Managing Pavements Seattle WA."},{"key":"e_1_3_1_14_1","unstructured":"Hall K. T. Correa C. E. Carpenter S. H. and Elliot R. P. (2003). \u201cGuidelines for life-cycle cost analysis of pavement rehabilitation strategies.\u201d Proc. 82nd Annual Meeting of the Transportation Research Board National Research Council Washington DC."},{"key":"e_1_3_1_15_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1995)121:3(273)"},{"key":"e_1_3_1_16_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-947X(2003)129:3(230)"},{"key":"e_1_3_1_17_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:4(449)"},{"key":"e_1_3_1_18_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)1076-0342(2005)11:4(250)"},{"key":"e_1_3_1_19_1","unstructured":"Mahoney K. M. Porter R. J. Taylor D. R. Kulakowski B. T. and Ullman G. L. (2007). \u201cDesign of construction work zones on high-speed highways.\u201d NCHRP (National Cooperative Highway Research Program) Rep. No. 581 Transportation Research Board Washington DC."},{"key":"e_1_3_1_20_1","doi-asserted-by":"crossref","unstructured":"Tang Y. M. and Chien S. I. J. (2008). \u201cScheduling work zones for highway maintenance projects considering a discrete time-cost relation.\u201d Transportation Research Record 2055 Transportation Research Board Washington DC 21\u201330.","DOI":"10.3141\/2055-03"},{"key":"e_1_3_1_21_1","unstructured":"Walls J. and Smith M. R. (1998). \u201cLife-cycle cost analysis in pavement design-interim technical bulletin.\u201d Federal Highway Administration (FHWA) Rep. No. FHWA-SA-98-079 Washington DC."},{"key":"e_1_3_1_22_1","doi-asserted-by":"crossref","unstructured":"Weng J. and Meng Q. (2011). \u201cA decision tree-based model for work zone capacity estimation.\u201d Proc. 90th Annual Meeting of the Transportation Research Board National Research Council Washington DC.","DOI":"10.3141\/2257-05"}],"container-title":["Journal of Construction Engineering and Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/ascelibrary.org\/doi\/pdf\/10.1061\/%28ASCE%29CO.1943-7862.0000888","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,9]],"date-time":"2022-06-09T23:22:35Z","timestamp":1654816955000},"score":1,"resource":{"primary":{"URL":"https:\/\/ascelibrary.org\/doi\/10.1061\/%28ASCE%29CO.1943-7862.0000888"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,11]]},"references-count":21,"journal-issue":{"issue":"11","published-print":{"date-parts":[[2014,11]]}},"alternative-id":["10.1061\/(ASCE)CO.1943-7862.0000888"],"URL":"https:\/\/doi.org\/10.1061\/(asce)co.1943-7862.0000888","relation":{},"ISSN":["0733-9364","1943-7862"],"issn-type":[{"value":"0733-9364","type":"print"},{"value":"1943-7862","type":"electronic"}],"subject":[],"published":{"date-parts":[[2014,11]]},"assertion":[{"value":"2013-11-09","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2014-04-25","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2014-06-25","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}],"article-number":"04014050"}}