{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,14]],"date-time":"2026-03-14T16:41:46Z","timestamp":1773506506959,"version":"3.50.1"},"reference-count":163,"publisher":"Informa UK Limited","issue":"10","content-domain":{"domain":["www.tandfonline.com"],"crossmark-restriction":true},"short-container-title":["International Journal of Production Research"],"published-print":{"date-parts":[[2019,5,19]]},"DOI":"10.1080\/00207543.2018.1550269","type":"journal-article","created":{"date-parts":[[2018,12,6]],"date-time":"2018-12-06T15:25:46Z","timestamp":1544109946000},"page":"2926-2955","update-policy":"https:\/\/doi.org\/10.1080\/tandf_crossmark_01","source":"Crossref","is-referenced-by-count":124,"title":["Flow shop scheduling problems with assembly operations: a review and new trends"],"prefix":"10.1080","volume":"57","author":[{"given":"G. M.","family":"Komaki","sequence":"first","affiliation":[{"name":",","place":["USA"]}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7801-6174","authenticated-orcid":false,"given":"Shaya","family":"Sheikh","sequence":"additional","affiliation":[{"name":",","place":["USA"]}]},{"given":"Behnam","family":"Malakooti","sequence":"additional","affiliation":[{"name":",","place":["USA"]}]}],"member":"301","published-online":{"date-parts":[[2018,12,6]]},"reference":[{"issue":"2","key":"e_1_3_5_2_1","first-page":"109","article-title":"A Hybrid Tabu Search Heuristic for the Two-Stage Assembly Scheduling Problem","volume":"3","author":"Al-Anzi F. S.","year":"2006","unstructured":"Al-Anzi, F. S., and A. Allahverdi. 2006. \u201cA Hybrid Tabu Search Heuristic for the Two-Stage Assembly Scheduling Problem.\u201d International Journal of Operations Research 3 (2): 109\u2013119.","journal-title":"International Journal of Operations Research"},{"key":"e_1_3_5_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.09.011"},{"key":"e_1_3_5_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2008.11.018"},{"key":"e_1_3_5_5_1","first-page":"66","article-title":"Better Heuristics for a Two-Stage Multi-Machine Assembly Scheduling Problem to Minimize Total Completion Time","volume":"9","author":"Al-Anzi F. S.","year":"2012","unstructured":"Al-Anzi, F. S., and A. Allahverdi. 2012. \u201cBetter Heuristics for a Two-Stage Multi-Machine Assembly Scheduling Problem to Minimize Total Completion Time.\u201d International Journal of Operations Research 9: 66\u201375.","journal-title":"International Journal of Operations Research"},{"key":"e_1_3_5_6_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2013.06.001"},{"key":"e_1_3_5_7_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2004.09.002"},{"key":"e_1_3_5_8_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540600621029"},{"key":"e_1_3_5_9_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-007-0950-y"},{"key":"e_1_3_5_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2008.12.001"},{"key":"e_1_3_5_11_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-013-0775-5"},{"key":"e_1_3_5_12_1","doi-asserted-by":"publisher","DOI":"10.1080\/21681015.2016.1151466"},{"key":"e_1_3_5_13_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2016.03.037"},{"key":"e_1_3_5_14_1","unstructured":"Andr\u00e9s C. and S. Hatami. 2011 September. \u201cThe Three Stage Assembly Permutation Flowshop Scheduling Problem.\u201d V international conference on industrial engineering and industrial management 867\u2013875."},{"key":"e_1_3_5_15_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1387300"},{"key":"e_1_3_5_16_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.645511"},{"key":"e_1_3_5_17_1","volume-title":"Agent-Based Agile Manufacturing System Scheduling","author":"Babayan D. H. A.","year":"2004","unstructured":"Babayan, D. H. A., and D. He. 2004. Agent-Based Agile Manufacturing System Scheduling. Chicago: Department of Mechanical and Industrial Engineering, The University of Illinois Chicago."},{"key":"e_1_3_5_18_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.970713"},{"key":"e_1_3_5_19_1","doi-asserted-by":"publisher","DOI":"10.1080\/095372899233226"},{"key":"e_1_3_5_20_1","doi-asserted-by":"publisher","DOI":"10.1080\/09511929208944543"},{"issue":"1","key":"e_1_3_5_21_1","first-page":"7","article-title":"Branch and Bound Heuristic for Flow Shop Scheduling with Assembly Operations","volume":"2","author":"Bhongade A. S.","year":"2011","unstructured":"Bhongade, A. S., and P. M. Khodke. 2011. \u201cBranch and Bound Heuristic for Flow Shop Scheduling with Assembly Operations.\u201d International Journal of Advanced Manufacturing Systems 2 (1): 7\u201314.","journal-title":"International Journal of Advanced Manufacturing Systems"},{"key":"e_1_3_5_22_1","doi-asserted-by":"publisher","DOI":"10.5267\/j.ijiec.2011.09.003"},{"key":"e_1_3_5_23_1","doi-asserted-by":"publisher","DOI":"10.1007\/s40032-014-0111-7"},{"key":"e_1_3_5_24_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-007-0289-7"},{"key":"e_1_3_5_25_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-013-5175-7"},{"key":"e_1_3_5_26_1","doi-asserted-by":"crossref","unstructured":"Campos S. C. J. E. C. Arroyo and R. G. Tavares. 2016 December. \u201cA General VNS Heuristic for a Three-Stage Assembly Flow Shop Scheduling Problem.\u201d International conference on intelligent systems design and applications Springer Cham 955\u2013964.","DOI":"10.1007\/978-3-319-53480-0_94"},{"key":"e_1_3_5_27_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.994075"},{"key":"e_1_3_5_28_1","unstructured":"Cheng M. 2012. \u201cLot Streaming in a Two-Stage Assembly System and a Hybrid Flow Shop.\u201d Doctoral diss. Virginia Polytechnic Institute and State University."},{"key":"e_1_3_5_29_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1937-5956.2000.tb00137.x"},{"key":"e_1_3_5_30_1","doi-asserted-by":"publisher","DOI":"10.1023\/A:1007512501565"},{"key":"e_1_3_5_31_1","doi-asserted-by":"publisher","DOI":"10.1080\/002075498192922"},{"key":"e_1_3_5_32_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1084063"},{"key":"e_1_3_5_33_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-012-4217-x"},{"key":"e_1_3_5_34_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2013.06.005"},{"key":"e_1_3_5_35_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2017.07.012"},{"key":"e_1_3_5_36_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2018.04.033"},{"key":"e_1_3_5_37_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540412331333414"},{"key":"e_1_3_5_38_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2008.01.020"},{"key":"e_1_3_5_39_1","doi-asserted-by":"publisher","DOI":"10.1080\/0951192X.2016.1187293"},{"key":"e_1_3_5_40_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.simpat.2017.09.001"},{"key":"e_1_3_5_41_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0167-5060(08)70356-X"},{"key":"e_1_3_5_42_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00291-015-0401-3"},{"key":"e_1_3_5_43_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ifacol.2016.07.578"},{"key":"e_1_3_5_44_1","unstructured":"Hadda H. N. Dridi and S. Hajri-Gabouj. 2007. \u201cThe Two-Stage Assembly Flow Shop Scheduling with an Availability Constraint.\u201d Proceedings of the 3rd multidisciplinary international conference on scheduling: theory and application MISTA 184\u2013191."},{"key":"e_1_3_5_45_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10852-013-9235-7"},{"key":"e_1_3_5_46_1","unstructured":"Halim A. H. and R. Yusriski. 2009. \u201cBatch Scheduling for the Two-Stage Assembly Model to Minimize Total Actual Flow Time.\u201d Proceedings of The 10-th Asia Pacific industrial engineering and management systems."},{"key":"e_1_3_5_47_1","doi-asserted-by":"publisher","DOI":"10.1051\/ro:1999120"},{"key":"e_1_3_5_48_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(96)00312-8"},{"key":"e_1_3_5_49_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-010-2579-5"},{"key":"e_1_3_5_50_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.807955"},{"key":"e_1_3_5_51_1","doi-asserted-by":"crossref","unstructured":"Hatami S. R. Ruiz and C. Andr\u00e9s-Romano. 2014. \u201cSimple Constructive Heuristics for the Distributed Assembly Permutation Flowshop Scheduling Problem with Sequence Dependent Setup Times.\u201d International conference on control decision and information technologies (CoDIT) 2014 019\u2013023. IEEE.","DOI":"10.1109\/CoDIT.2014.6996861"},{"key":"e_1_3_5_52_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2015.07.027"},{"key":"e_1_3_5_53_1","doi-asserted-by":"publisher","DOI":"10.1080\/09537280050051997"},{"key":"e_1_3_5_54_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540210136522"},{"key":"e_1_3_5_55_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0736-5845(00)00041-7"},{"key":"e_1_3_5_56_1","doi-asserted-by":"publisher","DOI":"10.1080\/0020754050056417"},{"key":"e_1_3_5_57_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.01.015"},{"issue":"1","key":"e_1_3_5_58_1","first-page":"1215","article-title":"Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities","volume":"3","author":"Hosseini S. M. H.","year":"2016","unstructured":"Hosseini, S. M. H. 2016. \u201cModeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities.\u201d International Journal of Supply and Operations Management 3 (1): 1215\u20131233.","journal-title":"International Journal of Supply and Operations Management"},{"key":"e_1_3_5_59_1","first-page":"132","article-title":"A Multi-Objective Genetic Algorithm (MOGA) for Hybrid Flow Shop Scheduling Problem with Assembly Operation","volume":"10","author":"Hosseini S. M. H.","year":"2017","unstructured":"Hosseini, S. M. H. 2017. \u201cA Multi-Objective Genetic Algorithm (MOGA) for Hybrid Flow Shop Scheduling Problem with Assembly Operation.\u201d Journal of Industrial and Systems Engineering 10: 132\u2013154.","journal-title":"Journal of Industrial and Systems Engineering"},{"key":"e_1_3_5_60_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-014-1531-8"},{"key":"e_1_3_5_61_1","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2011.90"},{"key":"e_1_3_5_62_1","doi-asserted-by":"crossref","unstructured":"Javadian N. A. Mozdgir E. G. Kouhi D. Qajar and M. E. Shiraqai. 2009. \u201cSolving Assembly Flowshop Scheduling Problem with Parallel Machines Using Variable Neighborhood Search.\u201d International conference on computers & industrial Engineering 2009. CIE 2009 102\u2013107. IEEE.","DOI":"10.1109\/ICCIE.2009.5223845"},{"key":"e_1_3_5_63_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2015.08.016"},{"key":"e_1_3_5_64_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1937-5956.2002.tb00492.x"},{"key":"e_1_3_5_65_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.12.030"},{"key":"e_1_3_5_66_1","doi-asserted-by":"crossref","unstructured":"Karuno Y. and H. Nagamochi. 2002. \u201cA Better Approximation for the Two-Stage Assembly Scheduling Problem with Two Machines at the First Stage.\u201d International symposium on algorithms and computation 199\u2013210. Berlin Heidelberg: Springer.","DOI":"10.1007\/3-540-36136-7_18"},{"key":"e_1_3_5_67_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2011.08.019"},{"key":"e_1_3_5_68_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2017.05.004"},{"key":"e_1_3_5_69_1","doi-asserted-by":"publisher","DOI":"10.1080\/0951192X.2014.880805"},{"key":"e_1_3_5_70_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.784414"},{"key":"e_1_3_5_71_1","doi-asserted-by":"publisher","DOI":"10.1080\/002075400189653"},{"key":"e_1_3_5_72_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jocs.2015.03.011"},{"key":"e_1_3_5_73_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1035815"},{"key":"e_1_3_5_74_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2017.01.006"},{"key":"e_1_3_5_75_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(00)00004-6"},{"key":"e_1_3_5_76_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(03)00142-5"},{"key":"e_1_3_5_77_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.07.027"},{"key":"e_1_3_5_78_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(03)00250-9"},{"key":"e_1_3_5_79_1","doi-asserted-by":"publisher","DOI":"10.1109\/70.88060"},{"key":"e_1_3_5_80_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2003.08.006"},{"key":"e_1_3_5_81_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1315192"},{"key":"e_1_3_5_82_1","doi-asserted-by":"publisher","DOI":"10.1155\/2016\/6409321"},{"key":"e_1_3_5_83_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.39.5.616"},{"key":"e_1_3_5_84_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2017.07.058"},{"key":"e_1_3_5_85_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.26.1.22"},{"key":"e_1_3_5_86_1","doi-asserted-by":"crossref","unstructured":"Li P. Y. Yang X. Du X. Qu K. Wang and B. Liu. 2017. \u201cIterated Local Search for Distributed Multiple Assembly No-Wait Flowshop Scheduling.\u201d 2017 IEEE Congress on evolutionary computation (CEC) 1565\u20131571.","DOI":"10.1109\/CEC.2017.7969489"},{"key":"e_1_3_5_87_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2015.07.018"},{"key":"e_1_3_5_88_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540600969782"},{"key":"e_1_3_5_89_1","doi-asserted-by":"publisher","DOI":"10.1080\/07408170208928930"},{"key":"e_1_3_5_90_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2005.04.004"},{"key":"e_1_3_5_91_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.swevo.2017.04.007"},{"key":"e_1_3_5_92_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.05.005"},{"key":"e_1_3_5_93_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(99)00023-6"},{"key":"e_1_3_5_94_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540903524490"},{"key":"e_1_3_5_95_1","doi-asserted-by":"crossref","unstructured":"Maboudian Y. and R. Shafaei. 2009. \u201cModeling a Bi-Criteria Two Stage Assembly Flow Shop Scheduling Problem with Sequence Dependent Setup Times.\u201d IEEE international conference on industrial engineering and engineering management 2009. 1748\u20131752.","DOI":"10.1109\/IEEM.2009.5373156"},{"key":"e_1_3_5_96_1","doi-asserted-by":"crossref","unstructured":"Mahdavi I. G. M. Komaki and V. Kayvanfar 2011. \u201cAggregate Hybrid Flowshop Scheduling with Assembly Operations.\u201d 2011 IEEE 18th international conference on industrial engineering and engineering management (IE&EM) 663\u2013667.","DOI":"10.1109\/ICIEEM.2011.6035244"},{"issue":"4","key":"e_1_3_5_97_1","first-page":"497","article-title":"Hybrid Genetic Algorithm for Assembly Flow-Shop Scheduling Problem with Sequence-Dependent Setup and Transportation Times","volume":"18","author":"Majazi Dalfard V.","year":"2011","unstructured":"Majazi Dalfard, V., A. Ardakani, and T. Nazalsadat Banihashemi. 2011. \u201cHybrid Genetic Algorithm for Assembly Flow-Shop Scheduling Problem with Sequence-Dependent Setup and Transportation Times.\u201d Tehni\u010dki Vjesnik 18 (4): 497\u2013504.","journal-title":"Tehni\u010dki Vjesnik"},{"key":"e_1_3_5_98_1","volume-title":"Operations and Production Systems with Multiple Objectives","author":"Malakooti B.","year":"2013","unstructured":"Malakooti, B. 2013. Operations and Production Systems with Multiple Objectives. John Wiley & Sons."},{"issue":"5","key":"e_1_3_5_99_1","first-page":"603","article-title":"Taguchi Method for Three-Stage Assembly Flow Shop Scheduling Problem with Blocking and Sequence-Dependent Set Up Times","volume":"8","author":"Maleki-daronkolaei Aref","year":"2013","unstructured":"Maleki-daronkolaei, Aref, and I. Seyedi. 2013. \u201cTaguchi Method for Three-Stage Assembly Flow Shop Scheduling Problem with Blocking and Sequence-Dependent Set Up Times.\u201d Journal of Engineering Science and Technology 8 (5): 603\u2013622.","journal-title":"Journal of Engineering Science and Technology"},{"key":"e_1_3_5_100_1","doi-asserted-by":"publisher","DOI":"10.1186\/2251-712X-8-26"},{"key":"e_1_3_5_101_1","doi-asserted-by":"crossref","unstructured":"Maulidya R. R. Wangsaputra and A. H. Halim. 2018. \u201cBatch Scheduling for Hybrid Assembly Differentiation Flow Shop to Minimize Total Actual Flow Time.\u201d IOP conference series: materials science and engineering 319 No. 1 012042. IOP Publishing.","DOI":"10.1088\/1757-899X\/319\/1\/012042"},{"key":"e_1_3_5_102_1","doi-asserted-by":"publisher","DOI":"10.4236\/eng.2014.613081"},{"key":"e_1_3_5_103_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2012.756151"},{"issue":"6","key":"e_1_3_5_104_1","first-page":"2275","article-title":"Three Meta-Heuristics to Solve the No-Wait two-Stage Assembly Flow-Shop Scheduling Problem","volume":"20","author":"Mozdgir A.","year":"2013","unstructured":"Mozdgir, A., S. F. Ghomi, F. Jolai, and J. Navaei. 2013. \u201cThree Meta-Heuristics to Solve the No-Wait two-Stage Assembly Flow-Shop Scheduling Problem.\u201d Scientia Iranica. Transaction E, Industrial Engineering 20 (6): 2275\u20132283.","journal-title":"Scientia Iranica. Transaction E, Industrial Engineering"},{"key":"e_1_3_5_105_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2014.04.012"},{"key":"e_1_3_5_106_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2009.06.019"},{"key":"e_1_3_5_107_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2013.10.008"},{"key":"e_1_3_5_108_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-013-5187-3"},{"key":"e_1_3_5_109_1","doi-asserted-by":"publisher","DOI":"10.1080\/21681015.2015.1126653"},{"key":"e_1_3_5_110_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2015.03.006"},{"key":"e_1_3_5_111_1","doi-asserted-by":"publisher","DOI":"10.1057\/palgrave.jors.2600683"},{"key":"e_1_3_5_112_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.43.2.346"},{"key":"e_1_3_5_113_1","doi-asserted-by":"publisher","DOI":"10.1080\/0951192X.2016.1145812"},{"key":"e_1_3_5_114_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2009.11.001"},{"key":"e_1_3_5_115_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2009.09.024"},{"key":"e_1_3_5_116_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.knosys.2014.07.025"},{"key":"e_1_3_5_117_1","doi-asserted-by":"publisher","DOI":"10.1504\/IJPS.2011.044604"},{"key":"e_1_3_5_118_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2015.10.040"},{"key":"e_1_3_5_119_1","doi-asserted-by":"publisher","DOI":"10.1142\/S096031310200028X"},{"key":"e_1_3_5_120_1","doi-asserted-by":"publisher","DOI":"10.1504\/IJOR.2017.083959"},{"key":"e_1_3_5_121_1","doi-asserted-by":"publisher","DOI":"10.1177\/0954405414563554"},{"key":"e_1_3_5_122_1","doi-asserted-by":"publisher","DOI":"10.1080\/21681015.2016.1173599"},{"key":"e_1_3_5_123_1","doi-asserted-by":"publisher","DOI":"10.1504\/IJISE.2017.083180"},{"issue":"4","key":"e_1_3_5_124_1","first-page":"67","article-title":"Solving a Two-Stage Assembly Flow Shop Scheduling Problem to Minimize the Mean Tardiness and Earliness Penalties by Three Meta-Heuristics","volume":"2","author":"Seyedi I.","year":"2013","unstructured":"Seyedi, I., and A. Maleki-Daronkolaei. 2013. \u201cSolving a Two-Stage Assembly Flow Shop Scheduling Problem to Minimize the Mean Tardiness and Earliness Penalties by Three Meta-Heuristics.\u201d Caspian Journal of Applied Sciences Research 2 (4): 67\u201378.","journal-title":"Caspian Journal of Applied Sciences Research"},{"issue":"8","key":"e_1_3_5_125_1","first-page":"394","article-title":"Tabu Search and Simulated Annealing for New Three-Stage Assembly Flow Shop Scheduling with Blocking","volume":"4","author":"Seyedi I.","year":"2012","unstructured":"Seyedi, I., A. Maleki-Daronkolaei, and F. Kalashi. 2012. \u201cTabu Search and Simulated Annealing for New Three-Stage Assembly Flow Shop Scheduling with Blocking.\u201d Interdisciplinary Journal of Contemporary Research in Business 4 (8): 394\u2013402.","journal-title":"Interdisciplinary Journal of Contemporary Research in Business"},{"key":"e_1_3_5_126_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2017.10.015"},{"key":"e_1_3_5_127_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-014-6029-7"},{"key":"e_1_3_5_128_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-009-2337-8"},{"key":"e_1_3_5_129_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.948575"},{"key":"e_1_3_5_130_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540903536155"},{"key":"e_1_3_5_131_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.05.006"},{"key":"e_1_3_5_132_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00245-X"},{"key":"e_1_3_5_133_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2009.03.012"},{"key":"e_1_3_5_134_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2007.12.007"},{"issue":"1","key":"e_1_3_5_135_1","first-page":"21","article-title":"Bi-Objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem","volume":"1","author":"Tadayoni Rad S.","year":"2015","unstructured":"Tadayoni Rad, S., S. Gholami, R. Shafaei, and H. Seidgar. 2015. \u201cBi-Objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem.\u201d Journal of Quality Engineering and Production Optimization 1 (1): 21\u201332.","journal-title":"Journal of Quality Engineering and Production Optimization"},{"key":"e_1_3_5_136_1","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2013.105"},{"key":"e_1_3_5_137_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2012.02.006"},{"key":"e_1_3_5_138_1","doi-asserted-by":"publisher","DOI":"10.1142\/S0219622016500024"},{"key":"e_1_3_5_139_1","doi-asserted-by":"crossref","unstructured":"Tharumarajah A. R. Bemelman P. Welgama and A. Wells. 1998. \u201cDistributed Scheduling of an Assembly Shop.\u201d 1998 IEEE international conference on systems man and cybernetics 1998 Vol. 1 433\u2013438. IEEE.","DOI":"10.1109\/ICSMC.1998.725450"},{"key":"e_1_3_5_140_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-012-4343-5"},{"key":"e_1_3_5_141_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.advengsoft.2010.06.004"},{"key":"e_1_3_5_142_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(01)00098-3"},{"key":"e_1_3_5_143_1","doi-asserted-by":"publisher","DOI":"10.1002\/nav.3800060205"},{"key":"e_1_3_5_144_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1468-0394.2005.00297.x"},{"key":"e_1_3_5_145_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2016.1193246"},{"key":"e_1_3_5_146_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSMC.2015.2416127"},{"key":"e_1_3_5_147_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2012.04.007"},{"key":"e_1_3_5_148_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1401243"},{"key":"e_1_3_5_149_1","doi-asserted-by":"publisher","DOI":"10.1504\/IJISE.2014.064343"},{"key":"e_1_3_5_150_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.884290"},{"key":"e_1_3_5_151_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2014.07.004"},{"key":"e_1_3_5_152_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2014.02.005"},{"key":"e_1_3_5_153_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.894257"},{"key":"e_1_3_5_154_1","doi-asserted-by":"crossref","unstructured":"Yang Y. P. Li S. Wang B. Liu and Y. Luo. 2017. \u201cScatter Search for Distributed Assembly Flow Shop Scheduling to Minimize Total Tardiness.\u201d 2017 IEEE Congress on evolutionary computation (CEC) 861\u2013868. IEEE.","DOI":"10.1109\/CEC.2017.7969399"},{"key":"e_1_3_5_155_1","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1007\/978-1-4614-9056-2_15","volume-title":"Essays in Production, Project Planning and Scheduling","author":"Yao L.","year":"2014","unstructured":"Yao, L., and S. C. Sarin. 2014. \u201cMultiple-Lot Lot Streaming in a Two-Stage Assembly System.\u201d In Essays in Production, Project Planning and Scheduling, 357\u2013388. Springer."},{"key":"e_1_3_5_156_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2013.07.004"},{"key":"e_1_3_5_157_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(00)00169-9"},{"key":"e_1_3_5_158_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(03)00165-5"},{"key":"e_1_3_5_159_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.06.067"},{"key":"e_1_3_5_160_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2003.09.016"},{"issue":"1","key":"e_1_3_5_161_1","first-page":"25","article-title":"A Note on the Reversibility of the Two Stage Assembly Scheduling Problem","volume":"13","author":"Yoon S. H.","year":"2007","unstructured":"Yoon, S. H., I. S. Lee, and C. S. Sung. 2007. \u201cA Note on the Reversibility of the Two Stage Assembly Scheduling Problem.\u201d Management Science and Financial Engineering 13 (1): 25\u201334.","journal-title":"Management Science and Financial Engineering"},{"key":"e_1_3_5_162_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2004.03.005"},{"key":"e_1_3_5_163_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1401241"},{"key":"e_1_3_5_164_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2010.01.014"}],"container-title":["International Journal of Production Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.tandfonline.com\/doi\/pdf\/10.1080\/00207543.2018.1550269","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,2,12]],"date-time":"2026-02-12T11:41:53Z","timestamp":1770896513000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.tandfonline.com\/doi\/full\/10.1080\/00207543.2018.1550269"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,12,6]]},"references-count":163,"journal-issue":{"issue":"10","published-print":{"date-parts":[[2019,5,19]]}},"alternative-id":["10.1080\/00207543.2018.1550269"],"URL":"https:\/\/doi.org\/10.1080\/00207543.2018.1550269","relation":{},"ISSN":["0020-7543","1366-588X"],"issn-type":[{"value":"0020-7543","type":"print"},{"value":"1366-588X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,12,6]]},"assertion":[{"value":"The publishing and review policy for this title is described in its Aims & Scope.","order":1,"name":"peerreview_statement","label":"Peer Review Statement"},{"value":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","URL":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","order":2,"name":"aims_and_scope_url","label":"Aim & Scope"},{"value":"2017-08-31","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2018-11-12","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2018-12-06","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}