{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,3]],"date-time":"2026-06-03T08:04:57Z","timestamp":1780473897970,"version":"3.54.1"},"reference-count":38,"publisher":"Informa UK Limited","issue":"3","funder":[{"DOI":"10.13039\/501100003032","name":"ANRT","doi-asserted-by":"publisher","id":[{"id":"10.13039\/501100003032","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":["www.tandfonline.com"],"crossmark-restriction":true},"short-container-title":["International Journal of Production Research"],"published-print":{"date-parts":[[2021,2,1]]},"DOI":"10.1080\/00207543.2020.1711984","type":"journal-article","created":{"date-parts":[[2020,1,20]],"date-time":"2020-01-20T07:01:00Z","timestamp":1579503660000},"page":"860-884","update-policy":"https:\/\/doi.org\/10.1080\/tandf_crossmark_01","source":"Crossref","is-referenced-by-count":26,"title":["A sampling-based approach for managing lot release in time constraint tunnels in semiconductor manufacturing"],"prefix":"10.1080","volume":"59","author":[{"given":"Alexandre","family":"Lima","sequence":"first","affiliation":[{"name":"Department of Manufacturing Sciences and Logistics, Mines Saint-Etienne, Univ Clermont Auvergne, CNRS, UMR 6158 LIMOS, CMP, Gardanne, France"},{"name":"Advanced Engineering Methods Department, ST Microelectronics, Crolles, France"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9285-0587","authenticated-orcid":false,"given":"Valeria","family":"Borodin","sequence":"additional","affiliation":[{"name":"Department of Manufacturing Sciences and Logistics, Mines Saint-Etienne, Univ Clermont Auvergne, CNRS, UMR 6158 LIMOS, CMP, Gardanne, France"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3566-3248","authenticated-orcid":false,"given":"St\u00e9phane","family":"Dauz\u00e8re-P\u00e9r\u00e8s","sequence":"additional","affiliation":[{"name":"Department of Manufacturing Sciences and Logistics, Mines Saint-Etienne, Univ Clermont Auvergne, CNRS, UMR 6158 LIMOS, CMP, Gardanne, France"},{"name":"Department of Accounting, Auditing and Business Analytics, BI Norwegian Business School, Oslo, Norway"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Philippe","family":"Vialletelle","sequence":"additional","affiliation":[{"name":"Advanced Engineering Methods Department, ST Microelectronics, Crolles, France"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"301","published-online":{"date-parts":[[2020,1,19]]},"reference":[{"key":"CIT0001","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.34.3.391"},{"key":"CIT0002","doi-asserted-by":"publisher","DOI":"10.1111\/poms.12395"},{"key":"CIT0003","unstructured":"Cho, Lucky, Hangmi Michelle Park, Jennifer K. Ryan, Thomas C. Sharkey, Chihyun Jung, and Detlef Pabst. 2014. \u201c64th Annual Conference and Expo of the Institute of Industrial Engineers 2014.\u201d Proceedings of a meeting held 31 May \u2013 3 June 2014, Montreal, Canada. http:\/\/www.proceedings.com\/23868.html."},{"key":"CIT0004","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2011.05.032"},{"key":"CIT0005","doi-asserted-by":"publisher","DOI":"10.1023\/A:1018930406487"},{"key":"CIT0006","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2018.04.046"},{"key":"CIT0007","doi-asserted-by":"publisher","DOI":"10.1080\/09537287.2010.490022"},{"key":"CIT0008","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2014.2337310"},{"key":"CIT0009","doi-asserted-by":"publisher","DOI":"10.1016\/j.cirp.2012.03.077"},{"key":"CIT0010","doi-asserted-by":"publisher","DOI":"10.1016\/j.ifacol.2017.08.391"},{"key":"CIT0011","doi-asserted-by":"crossref","unstructured":"Kitamura, Shoichi, Kazuyuki Mori, and Akira Ono. 2006. \u201cCapacity Planning Method for Semiconductor Fab With Time Constraints Between Operations.\u201d IEEE\u00a0International Joint Conference on SICE-ICASE,\u00a0Busan, South Korea, 1100\u20131103","DOI":"10.1109\/SICE.2006.315820"},{"key":"CIT0012","doi-asserted-by":"crossref","unstructured":"Klemmt, Andreas, and Lars M\u00f6nch. 2012. \u201cScheduling Jobs With Time Constraints Between Consecutive Process Steps in Semiconductor Manufacturing.\u201d Proceedings of the Winter Simulation Conference,\u00a0Berlin, Germany, 194","DOI":"10.1109\/WSC.2012.6465235"},{"key":"CIT0013","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2017.04.050"},{"key":"CIT0014","doi-asserted-by":"crossref","unstructured":"Kobayashi, Akihiro, Takahiro Kuno, and Sumika Arima. 2013. \u201cRe-entrant Flow Control in Q-Time Constraints Processes for Actual Applications.\u201d e-Manufacturing & Design Collaboration Symposium (eMDC),\u00a0Hsinchu, Taiwan, 1\u20134. IEEE","DOI":"10.1109\/eMDC.2013.6756052"},{"key":"CIT0015","doi-asserted-by":"publisher","DOI":"10.1111\/j.1937-5956.1997.tb00414.x"},{"key":"CIT0016","unstructured":"Lee, Yih-Yi, C. T. Chen, and Chester Wu. 2005. \u201cReaction Chain of Process Queue Time Quality Control.\u201d IEEE International Symposium on Semiconductor Manufacturing (ISSM 2005), San Jose, CA, USA, 47\u201350. IEEE"},{"key":"CIT0017","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2018.01.001"},{"key":"CIT0018","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2015.11.004"},{"key":"CIT0019","doi-asserted-by":"crossref","unstructured":"Lima, Alexandre, Valeria Borodin, St\u00e9phane Dauz\u00e8re-P\u00e9r\u00e8s, and Philippe Vialletelle. 2017. \u201cAnalyzing Different Dispatching Policies for Probability Estimation in Time Constraint Tunnels in Semiconductor Manufacturing.\u201d 2017 Winter Simulation Conference (WSC),\u00a0Las Vegas, NV, USA, 3543\u20133554","DOI":"10.1109\/WSC.2017.8248068"},{"key":"CIT0020","doi-asserted-by":"publisher","DOI":"10.1016\/j.compind.2019.04.014"},{"key":"CIT0021","doi-asserted-by":"publisher","DOI":"10.1007\/s00158-017-1739-8"},{"key":"CIT0022","doi-asserted-by":"crossref","unstructured":"Maleck, Christian, and Tobias Eckert. 2017. \u201cA Comparison of Control Methods for Production Areas With Time Constraints and Tool Interruptions in Semiconductor Manufacturing.\u201d 2017 40th International Spring Seminar on Electronics Technology (ISSE), Sofia, Bulgaria, 1\u20136. IEEE","DOI":"10.1109\/ISSE.2017.8000944"},{"key":"CIT0023","doi-asserted-by":"crossref","unstructured":"Maleck, Christian, Gerald Weigert, Detlef Pabst, and Marcel Stehli. 2017. \u201cRobustness Analysis of an MIP for Production Areas With Time Constraints and Tool Interruptions in Semiconductor Manufacturing.\u201d Simulation Conference (WSC), 2017 Winter,\u00a0Las Vegas, NV, USA, 3714\u20133725. IEEE","DOI":"10.1109\/WSC.2017.8248084"},{"key":"CIT0024","doi-asserted-by":"publisher","DOI":"10.1109\/TCOMM.2005.863780"},{"key":"CIT0025","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-6329-7"},{"key":"CIT0026","doi-asserted-by":"crossref","unstructured":"Pappert, Falk Stefan, Tao Zhang, Oliver Rose, Fabian Suhrke, Jonas Mager, and Thomas Frey. 2016. \u201cImpact of Time Bound Constraints and Batching on Metallization in an Opto-semiconductor Fab.\u201d Winter Simulation Conference (WSC), Washington, DC, USA, 2947\u20132957. IEEE","DOI":"10.1109\/WSC.2016.7822329"},{"key":"CIT0027","doi-asserted-by":"crossref","unstructured":"Robinson, Jennifer K. 1998. \u201cCapacity Planning in a Semiconductor Wafer Fabrication Facility With Time Constraints Between Process Steps.\u201d PhD diss., Citeseer.","DOI":"10.1145\/324138.324545"},{"key":"CIT0028","unstructured":"Roy, B., and B. Sussmann. 1964. \u201cLes Probl\u00e8mes d'Ordonnancement avec Contraintes Disjonctives.\u201d Note DS n.9 bis, SEMA."},{"key":"CIT0029","doi-asserted-by":"crossref","unstructured":"Sadeghi, Rezvan, St\u00e9phane Dauz\u00e8re-P\u00e9r\u00e8s, Claude Yugma, and Guillaume Lepelletier. 2015. \u201cProduction Control in Semiconductor Manufacturing With Time Constraints.\u201d Advanced Semiconductor Manufacturing Conference (ASMC), 2015 26th Annual SEMI,\u00a0Saratoga Springs, NY, USA, 29\u201333","DOI":"10.1109\/ASMC.2015.7164446"},{"issue":"3","key":"CIT0030","first-page":"209","volume":"2","author":"Simpson Timothy W.","year":"2001","journal-title":"International Journal of Reliability and Applications"},{"key":"CIT0031","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2018.04.021"},{"key":"CIT0032","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2018.2826530"},{"key":"CIT0033","doi-asserted-by":"crossref","unstructured":"Wu, Cheng-Hung, Yu-Ching Cheng, Ping-Ju Tang, and Jiun-Yu Yu. 2012. \u201cOptimal Batch Process Admission Control in Tandem Queueing Systems With Queue Time Constraint Considerations.\u201d Proceedings of the Winter Simulation Conference,\u00a0Berlin, Germany, 204","DOI":"10.1109\/WSC.2012.6465293"},{"key":"CIT0034","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.04.003"},{"key":"CIT0035","doi-asserted-by":"publisher","DOI":"10.1080\/00207540902922836"},{"key":"CIT0036","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2012.02.003"},{"key":"CIT0037","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.575090"},{"key":"CIT0038","doi-asserted-by":"crossref","unstructured":"Yurtsever, Tanju, Erhan Kutanoglu, and Jennifer Johns. 2009. \u201cHeuristic Based Scheduling System for Diffusion in Semiconductor Manufacturing.\u201d Winter Simulation Conference,\u00a0Austin, TX, USA, 1677\u20131685","DOI":"10.1109\/WSC.2009.5429171"}],"container-title":["International Journal of Production Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.tandfonline.com\/doi\/pdf\/10.1080\/00207543.2020.1711984","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,3,22]],"date-time":"2021-03-22T19:30:44Z","timestamp":1616441444000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.tandfonline.com\/doi\/full\/10.1080\/00207543.2020.1711984"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,1,19]]},"references-count":38,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2021,2,1]]}},"alternative-id":["10.1080\/00207543.2020.1711984"],"URL":"https:\/\/doi.org\/10.1080\/00207543.2020.1711984","relation":{},"ISSN":["0020-7543","1366-588X"],"issn-type":[{"value":"0020-7543","type":"print"},{"value":"1366-588X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,1,19]]},"assertion":[{"value":"The publishing and review policy for this title is described in its Aims & Scope.","order":1,"name":"peerreview_statement","label":"Peer Review Statement"},{"value":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","URL":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","order":2,"name":"aims_and_scope_url","label":"Aim & Scope"},{"value":"2019-01-10","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2019-12-23","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2020-01-19","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}