{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,21]],"date-time":"2026-05-21T17:37:32Z","timestamp":1779385052387,"version":"3.53.1"},"reference-count":184,"publisher":"Informa UK Limited","issue":"1","content-domain":{"domain":["www.tandfonline.com"],"crossmark-restriction":true},"short-container-title":["International Journal of Production Research"],"published-print":{"date-parts":[[2022,1,2]]},"DOI":"10.1080\/00207543.2021.1994165","type":"journal-article","created":{"date-parts":[[2021,11,5]],"date-time":"2021-11-05T11:37:20Z","timestamp":1636112240000},"page":"256-276","update-policy":"https:\/\/doi.org\/10.1080\/tandf_crossmark_01","source":"Crossref","is-referenced-by-count":24,"title":["Order release in production planning and control systems: challenges and opportunities"],"prefix":"10.1080","volume":"60","author":[{"given":"Hubert","family":"Missbauer","sequence":"first","affiliation":[{"name":"University of Innsbruck","place":["Innsbruck, Austria"]}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Reha","family":"Uzsoy","sequence":"additional","affiliation":[{"name":"North Carolina State University","place":["Raleigh, USA"]}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"301","published-online":{"date-parts":[[2021,11,5]]},"reference":[{"key":"e_1_3_3_2_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2015.2453792"},{"key":"e_1_3_3_3_1","doi-asserted-by":"crossref","unstructured":"Albey E. and R. Uzsoy. 2015. \u201cLead Time Modeling in Production Planning.\u201d Winter Simulation Conference Huntington Beach CA.","DOI":"10.1109\/WSC.2015.7408315"},{"key":"e_1_3_3_4_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-55309-7_8"},{"key":"e_1_3_3_5_1","unstructured":"Allison R. A. H. J. Yu L. H. Tsai C. Liu M. Drummond D. Kayton T. Sustae and J. Witte. 1997. \u201cMacro Model Development as a Bridge Between Factory Level Simulation and LP Enterprise Systems.\u201d IEEE\/CPMT International Electronics Manufacturing Technology Symposium."},{"key":"e_1_3_3_6_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207548108956628"},{"key":"e_1_3_3_7_1","volume-title":"Planning and Control Systems: A Framework for Analysis","author":"Anthony R. N.","year":"1966","unstructured":"Anthony, R. N. 1966. Planning and Control Systems: A Framework for Analysis. Cambridge, MA: Harvard University Press."},{"key":"e_1_3_3_8_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-0-85729-644-3_8"},{"key":"e_1_3_3_9_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.935514"},{"key":"e_1_3_3_10_1","doi-asserted-by":"publisher","DOI":"10.1016\/0278-6125(95)98881-6"},{"key":"e_1_3_3_11_1","doi-asserted-by":"publisher","DOI":"10.1002\/nav.20335"},{"key":"e_1_3_3_12_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2005.863214"},{"key":"e_1_3_3_13_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.34.5.796"},{"key":"e_1_3_3_14_1","volume-title":"Inventory Control","author":"Axsater S.","year":"2010","unstructured":"Axsater, S. 2010. Inventory Control. New York: Springer."},{"key":"e_1_3_3_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2003.08.027"},{"key":"e_1_3_3_16_1","first-page":"571","volume-title":"Handbooks in Operations Research and Management Science","author":"Baker K. R.","year":"1993","unstructured":"Baker, K. R. 1993. \u201cRequirements Planning.\u201d In Handbooks in Operations Research and Management Science, edited by S. C. Graves, A. H. G. Rinnooy Kan, and P. H. Zipkin, 571\u2013627. Amsterdam: Elsevier Scence Publishers."},{"key":"e_1_3_3_17_1","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2009.2021462"},{"key":"e_1_3_3_18_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207548808947871"},{"key":"e_1_3_3_19_1","doi-asserted-by":"publisher","DOI":"10.1080\/002075497195821"},{"key":"e_1_3_3_20_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443570210414338"},{"key":"e_1_3_3_21_1","volume-title":"Production Control: A Structural and Design Oriented Approach","author":"Bertrand J. W. M.","year":"1990","unstructured":"Bertrand, J. W. M., J. C. Wortmann, and J. Wijngaard. 1990. Production Control: A Structural and Design Oriented Approach. Amsterdam: Elsevier."},{"key":"e_1_3_3_22_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.1030.0065"},{"key":"e_1_3_3_23_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.29.10.1126"},{"key":"e_1_3_3_24_1","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.9.2.111"},{"key":"e_1_3_3_25_1","volume-title":"Numerical Tests of Order Release Models with One- and Two-Dimensional Clearing Functions","author":"Bischoff W.","year":"2017","unstructured":"Bischoff, W. 2017. Numerical Tests of Order Release Models with One- and Two-Dimensional Clearing Functions. M. S., Department of Information Systems, Production and Logistics Management, University of Innsbruck, Innsbruck, Austria."},{"key":"e_1_3_3_26_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.30.2.232"},{"key":"e_1_3_3_27_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.34.1.75"},{"key":"e_1_3_3_28_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0927-0507(05)80190-2"},{"key":"e_1_3_3_29_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1524167"},{"key":"e_1_3_3_30_1","volume-title":"The Discovery Process in Economics - The Peculiar Science","author":"Buchanan J. M.","year":"1995","unstructured":"Buchanan, J. M. 1995. The Discovery Process in Economics - The Peculiar Science. Alpbach, Austria: Alpbach European Forum."},{"key":"e_1_3_3_31_1","volume-title":"Production Planning and Control: Basics and Concepts","author":"Buzacott J. A.","year":"2013","unstructured":"Buzacott, J. A., H. Corsten, R. G\u00f6ssinger, and H. M. Schneider. 2013. Production Planning and Control: Basics and Concepts. Munich: Oldenbourg Verlag Munchen."},{"key":"e_1_3_3_32_1","volume-title":"Stochastic Models of Manufacturing Systems","author":"Buzacott J. A.","year":"1993","unstructured":"Buzacott, J. A., and J. G. Shanthikumar. 1993. Stochastic Models of Manufacturing Systems. Englewood Cliffs, NJ: Prentice-Hall."},{"key":"e_1_3_3_33_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.40.12.1678"},{"key":"e_1_3_3_34_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(98)00104-2"},{"key":"e_1_3_3_35_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2004.06.021"},{"key":"e_1_3_3_36_1","volume-title":"Handbooks in Operations Research and Management Science: Supply Chain Management","author":"Cachon G.","year":"2004","unstructured":"Cachon, G. 2004. \u201cSupply Chain Coordination with Contracts.\u201d In Handbooks in Operations Research and Management Science: Supply Chain Management. Graves, S. C., De Kok, A. G. (eds.), 227\u2013339, North Holland, Amsterdam."},{"key":"e_1_3_3_37_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.35.1.58"},{"key":"e_1_3_3_38_1","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0548(90)90054-B"},{"key":"e_1_3_3_39_1","doi-asserted-by":"publisher","DOI":"10.1016\/0191-2615(92)90003-F"},{"key":"e_1_3_3_40_1","doi-asserted-by":"publisher","DOI":"10.1080\/01441647.2011.608135"},{"key":"e_1_3_3_41_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0191-2615(99)00019-3"},{"key":"e_1_3_3_42_1","doi-asserted-by":"publisher","DOI":"10.1023\/A:1022623016607"},{"key":"e_1_3_3_43_1","doi-asserted-by":"publisher","DOI":"10.1287\/msom.4.1.25.287"},{"key":"e_1_3_3_44_1","volume-title":"Strategy and Structure: Chapters in the History of the American Industrial Enterprise","author":"Chandler A. D.","year":"1962","unstructured":"Chandler, A. D. 1962. Strategy and Structure: Chapters in the History of the American Industrial Enterprise. Cambridge, MA: MIT Press."},{"key":"e_1_3_3_45_1","volume-title":"The Visible Hand: The Managerial Revolution in American Business","author":"Chandler A. D.","year":"1980","unstructured":"Chandler, A. D. 1980. The Visible Hand: The Managerial Revolution in American Business. Cambridge, MA: Belknap Press."},{"key":"e_1_3_3_46_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00495-2"},{"key":"e_1_3_3_47_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.compchemeng.2017.05.026"},{"key":"e_1_3_3_48_1","volume-title":"Manufacturing Systems Modelling and Analysis","author":"Curry G. L.","year":"2000","unstructured":"Curry, G. L., and R. M. Feldman. 2000. Manufacturing Systems Modelling and Analysis. Berlin-Heidelberg: Springer."},{"key":"e_1_3_3_49_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0927-0507(03)11012-2"},{"key":"e_1_3_3_50_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2019.1671627"},{"key":"e_1_3_3_51_1","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0548(91)90071-X"},{"key":"e_1_3_3_52_1","first-page":"119","volume-title":"Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook","author":"Elmaghraby S. E.","year":"2010","unstructured":"Elmaghraby, S. E. 2010. \u201cProduction Capacity: Its Bases, Functions and Measurement.\u201d In Planning Production and Inventories in the Extended Enterprise: A State of the Art Handbook, edited by K. G. Kempf, P. Keskinocak, and R. Uzsoy, 119\u2013166. New York: Springer."},{"key":"e_1_3_3_53_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2015.11.017"},{"key":"e_1_3_3_54_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.simpat.2014.03.007"},{"key":"e_1_3_3_55_1","first-page":"4","article-title":"A Tactical Planning Model for Manufacturing Subcomponents of Mainframe Computers","volume":"2","author":"Fine C. H.","year":"1989","unstructured":"Fine, C. H., and S. C. Graves. 1989. \u201cA Tactical Planning Model for Manufacturing Subcomponents of Mainframe Computers.\u201d Journal of Manufacturing and Operations Management 2: 4\u201334.","journal-title":"Journal of Manufacturing and Operations Management"},{"key":"e_1_3_3_56_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-55309-7_4"},{"key":"e_1_3_3_57_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4939-1384-8"},{"key":"e_1_3_3_58_1","volume-title":"Postoptimal Analysis, Parametric Programming and Related Topics","author":"Gal T.","year":"1979","unstructured":"Gal, T. 1979. Postoptimal Analysis, Parametric Programming and Related Topics. United Kingdom: McGraw-Hill."},{"issue":"203","key":"e_1_3_3_59_1","first-page":"203","article-title":"Evaluation and Comparison of Production Schedules","volume":"42","author":"Gary K.","year":"2000","unstructured":"Gary, K., K. G. Kempf, R. Uzsoy, and S. F. Smith. 2000. \u201cEvaluation and Comparison of Production Schedules.\u201d Computers in Industry 42 (203\u2013220): 203\u2013220.","journal-title":"Computers in Industry"},{"key":"e_1_3_3_60_1","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(95)00066-Y"},{"key":"e_1_3_3_61_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2020.07.024"},{"key":"e_1_3_3_62_1","doi-asserted-by":"publisher","DOI":"10.1287\/msom.1070.0205"},{"key":"e_1_3_3_63_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.40.5.629"},{"key":"e_1_3_3_64_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1557351"},{"key":"e_1_3_3_65_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2020.11.039"},{"key":"e_1_3_3_66_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.34.4.522"},{"key":"e_1_3_3_67_1","first-page":"67","article-title":"Safety Stocks in Manufacturing Systems","volume":"1","author":"Graves S. C.","year":"1988","unstructured":"Graves, S. C. 1988. \u201cSafety Stocks in Manufacturing Systems.\u201d Journal of Manufacturing and Operations Management 1: 67\u2013101.","journal-title":"Journal of Manufacturing and Operations Management"},{"key":"e_1_3_3_68_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0927-0507(03)11003-1"},{"key":"e_1_3_3_69_1","doi-asserted-by":"publisher","DOI":"10.1007\/BF02187328"},{"key":"e_1_3_3_70_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207548908942547"},{"key":"e_1_3_3_71_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-662-05607-3"},{"key":"e_1_3_3_72_1","volume-title":"Production Economics: Integrating the Microeconomic and Engineering Perspectives","author":"Hackman Steven T.","year":"2008","unstructured":"Hackman, Steven T. 2008. Production Economics: Integrating the Microeconomic and Engineering Perspectives. Berlin: Springer."},{"key":"e_1_3_3_73_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.35.4.478"},{"key":"e_1_3_3_74_1","first-page":"58, 3724","article-title":"Comparison Between Rule- and Optimization-Based Workload Control Concepts: A Simulation Optimization Approach","author":"Haeussler S.","year":"2020","unstructured":"Haeussler, S., and P. Netzer. 2020. \u201cComparison Between Rule- and Optimization-Based Workload Control Concepts: A Simulation Optimization Approach.\u201d International Journal of Production Research, 58, 3724\u20133743.","journal-title":"International Journal of Production Research"},{"key":"e_1_3_3_75_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2013.08.021"},{"key":"e_1_3_3_76_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2020.107682"},{"key":"e_1_3_3_77_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4419-1153-7_418"},{"key":"e_1_3_3_78_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443579110144655"},{"key":"e_1_3_3_79_1","doi-asserted-by":"publisher","DOI":"10.1057\/jors.1991.167"},{"key":"e_1_3_3_80_1","volume-title":"Planning Production, Inventories and Work Force, Prentice-Hall International Series in Management","author":"Holt C. C.","year":"1960","unstructured":"Holt, C. C., F. Modigliani, J. F. Muth, and H. A. Simon. 1960. Planning Production, Inventories and Work Force, Prentice-Hall International Series in Management. Englewood Cliffs, NJ: Prentice Hall."},{"key":"e_1_3_3_81_1","volume-title":"Factory Physics: Foundations of Manufacturing Management","author":"Hopp Wallace J.","year":"2008","unstructured":"Hopp, Wallace J., and Mark L. Spearman. 2008. Factory Physics: Foundations of Manufacturing Management. 3rd ed. Boston: Irwin\/McGraw-Hill.","edition":"3"},{"key":"e_1_3_3_82_1","doi-asserted-by":"publisher","DOI":"10.1080\/10170660109509458"},{"key":"e_1_3_3_83_1","doi-asserted-by":"publisher","DOI":"10.1109\/66.492820"},{"key":"e_1_3_3_84_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1369598"},{"key":"e_1_3_3_85_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2010.2051751"},{"key":"e_1_3_3_86_1","volume-title":"Manufacturing Planning and Control for Supply Chain Management","author":"Jacobs F. R.","year":"2011","unstructured":"Jacobs, F. R., W. L. Berry, D. C. Whybark, and T. E. Vollmann. 2011. Manufacturing Planning and Control for Supply Chain Management. New York, NY: McGraw-Hill Irwin."},{"key":"e_1_3_3_87_1","doi-asserted-by":"publisher","DOI":"10.1111\/j.1540-5915.1992.tb00392.x"},{"key":"e_1_3_3_88_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(96)00172-5"},{"key":"e_1_3_3_89_1","volume-title":"Operations Research in Production Planning, Scheduling and Inventory Control","author":"Johnson L. A.","year":"1974","unstructured":"Johnson, L. A., and D. C. Montgomery. 1974. Operations Research in Production Planning, Scheduling and Inventory Control. New York: John Wiley."},{"key":"e_1_3_3_90_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2011.2176560"},{"key":"e_1_3_3_91_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2013.2283038"},{"key":"e_1_3_3_92_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2016.2546314"},{"key":"e_1_3_3_93_1","doi-asserted-by":"publisher","DOI":"10.1109\/TASE.2014.2303316"},{"key":"e_1_3_3_94_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2014.04.003"},{"key":"e_1_3_3_95_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2018.07.019"},{"issue":"1","key":"e_1_3_3_96_1","first-page":"105","article-title":"Capacity Loading and Release Planning with Work-in-Progress (WIP) and Lead-Times","volume":"2","author":"Karmarkar U. S.","year":"1989","unstructured":"Karmarkar, U. S. 1989. \u201cCapacity Loading and Release Planning with Work-in-Progress (WIP) and Lead-Times.\u201d Journal of Manufacturing and Operations Management 2 (1): 105\u2013123.","journal-title":"Journal of Manufacturing and Operations Management"},{"key":"e_1_3_3_97_1","first-page":"153","article-title":"The Basis for Costs in Batching Decisions","volume":"3","author":"Karmarkar U. S.","year":"1990","unstructured":"Karmarkar, U. S., and J. L. Rummel. 1990. \u201cThe Basis for Costs in Batching Decisions.\u201d Journal of Manufacturing and Operations Management 3: 153\u2013176.","journal-title":"Journal of Manufacturing and Operations Management"},{"key":"e_1_3_3_98_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1076182"},{"key":"e_1_3_3_99_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(00)00172-9"},{"issue":"1","key":"e_1_3_3_100_1","first-page":"119","article-title":"General Principles of Inventory Control","volume":"1","author":"Kimball G. E.","year":"1988","unstructured":"Kimball, G. E. 1988. \u201cGeneral Principles of Inventory Control.\u201d Journal of Manufacturing and Operations Management 1 (1): 119\u2013130.","journal-title":"Journal of Manufacturing and Operations Management"},{"key":"e_1_3_3_101_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-50162-3"},{"key":"e_1_3_3_102_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(00)00037-2"},{"key":"e_1_3_3_103_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.22.3.261"},{"key":"e_1_3_3_104_1","first-page":"35, 3, 773","article-title":"Co-creation in Virtual Worlds: The Design of the User Experience","author":"Kohler T.","year":"2011","unstructured":"Kohler, T., J. Fueller, K. Matzler, and D. Stieger. 2011. \u201cCo-creation in Virtual Worlds: The Design of the User Experience.\u201d MIS Quarterly, 35, 3, 773\u2013788.","journal-title":"MIS Quarterly"},{"key":"e_1_3_3_105_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(99)00036-5"},{"key":"e_1_3_3_106_1","doi-asserted-by":"publisher","DOI":"10.1080\/24725854.2017.1364875"},{"key":"e_1_3_3_107_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.20.1.110"},{"key":"e_1_3_3_108_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1351644"},{"key":"e_1_3_3_109_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.836614"},{"key":"e_1_3_3_110_1","volume-title":"MRP II Standard System: A Handbook for Manufacturing Software Survival","author":"Landvater D. V.","year":"1995","unstructured":"Landvater, D. V., and C. D. Gray. 1995. MRP II Standard System: A Handbook for Manufacturing Software Survival. New York: Wiley."},{"key":"e_1_3_3_111_1","doi-asserted-by":"publisher","DOI":"10.1007\/BF02248585"},{"key":"e_1_3_3_112_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-0-85729-644-3_2"},{"key":"e_1_3_3_113_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2015.11.004"},{"key":"e_1_3_3_114_1","volume-title":"The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer","author":"Liker J.","year":"2004","unstructured":"Liker, J. 2004. The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. New York: McGraw-Hill."},{"key":"e_1_3_3_115_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2016.1165356"},{"key":"e_1_3_3_116_1","doi-asserted-by":"crossref","unstructured":"Liu J. C. Li F. Yang H. Wan and R. Uzsoy. 2011. \u201cProduction Planning for Semiconductor Manufacturing via Simulation Optimization.\u201d Winter Simulation Conferemce Baltimore MD.","DOI":"10.1109\/WSC.2011.6148055"},{"key":"e_1_3_3_117_1","doi-asserted-by":"publisher","DOI":"10.1109\/66.311341"},{"key":"e_1_3_3_118_1","volume-title":"Strategy for Managing Complex Systems: A Contribution to Management Cybernetics for Evolutionary Systems","author":"Malik F.","year":"2016","unstructured":"Malik, F. 2016. Strategy for Managing Complex Systems: A Contribution to Management Cybernetics for Evolutionary Systems. Campus Verlag, Bern."},{"key":"e_1_3_3_119_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.3.4.371"},{"key":"e_1_3_3_120_1","doi-asserted-by":"publisher","DOI":"10.1080\/0020754021000033869"},{"key":"e_1_3_3_121_1","first-page":"21","volume-title":"Planning Production and Inventories in the Extended Enterprise","author":"McKay K. N.","year":"2010","unstructured":"McKay, K. N. 2010. \u201cThe Historical Foundations of Manufacturing Planning and Control Practices.\u201d In Planning Production and Inventories in the Extended Enterprise, edited by K. G. Kempf, P. Keskinocak, and R. Uzsoy, 21\u201332. New York: Springer."},{"key":"e_1_3_3_122_1","doi-asserted-by":"publisher","DOI":"10.1080\/09537289508930295"},{"key":"e_1_3_3_123_1","volume-title":"Practical Production Control: A Survival Guide for Planners and Schedulers","author":"McKay K. N.","year":"2004","unstructured":"McKay, K. N., and V. C. S. Wiers. 2004. Practical Production Control: A Survival Guide for Planners and Schedulers. Boca Raton, FL: J. Ross Publishers."},{"key":"e_1_3_3_124_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207548708919887"},{"key":"e_1_3_3_125_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207548908942609"},{"key":"e_1_3_3_126_1","doi-asserted-by":"publisher","DOI":"10.1287\/trsc.12.3.183"},{"key":"e_1_3_3_127_1","doi-asserted-by":"publisher","DOI":"10.1287\/trsc.12.3.200"},{"key":"e_1_3_3_128_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.25.12.1232"},{"key":"e_1_3_3_129_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2015.05.013"},{"key":"e_1_3_3_130_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540110090939"},{"key":"e_1_3_3_131_1","doi-asserted-by":"publisher","DOI":"10.1080\/0953728021000026203"},{"key":"e_1_3_3_132_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2008.11.014"},{"key":"e_1_3_3_133_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2009.09.003"},{"key":"e_1_3_3_134_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2019.07.030"},{"key":"e_1_3_3_135_1","volume-title":"Order Release Optimization for Time-Dependent and Stochastic Manufacturing Systems","author":"Missbauer H.","year":"2020","unstructured":"Missbauer, H., R. Stolletz, and M. Schneckenreither. 2020. Order Release Optimization for Time-Dependent and Stochastic Manufacturing Systems. University of Innsbruck, Innsbruck, Austria."},{"key":"e_1_3_3_136_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-0716-0354-3"},{"key":"e_1_3_3_137_1","doi-asserted-by":"publisher","DOI":"10.2307\/1905580"},{"key":"e_1_3_3_138_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4614-4472-5"},{"key":"e_1_3_3_139_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1401234"},{"key":"e_1_3_3_140_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2005.09.001"},{"key":"e_1_3_3_141_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2020.1797208"},{"key":"e_1_3_3_142_1","unstructured":"O\u2019\u2019Brien M. W. J. Campbell and K. G. Kempf. 1999. \u201cImproving Manufacturing Simulations by Modeling Technician Decision Processes.\u201d ASI Simulation Users Conference Salt Lake City UT."},{"key":"e_1_3_3_143_1","volume-title":"Material Requirements Planning: the New Way of Life in Production and Inventory Management","author":"Orlicky J.","year":"1975","unstructured":"Orlicky, J. 1975. Material Requirements Planning: the New Way of Life in Production and Inventory Management. New York: McGraw-Hill."},{"key":"e_1_3_3_144_1","doi-asserted-by":"publisher","DOI":"10.1023\/A:1012827724856"},{"key":"e_1_3_3_145_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4614-2361-4"},{"key":"e_1_3_3_146_1","volume-title":"Production Planning by Mixed Integer Programming","author":"Pochet Y.","year":"2006","unstructured":"Pochet, Y., and L. A. Wolsey. 2006. Production Planning by Mixed Integer Programming. New York, NY: Springer Science and Business Media Inc."},{"key":"e_1_3_3_147_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2011.09.012"},{"key":"e_1_3_3_148_1","doi-asserted-by":"publisher","DOI":"10.7551\/mitpress\/9780262170055.001.0001"},{"key":"e_1_3_3_149_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-84882-748-6_3"},{"key":"e_1_3_3_150_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.775523"},{"key":"e_1_3_3_151_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2020.1859634"},{"key":"e_1_3_3_152_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(98)00003-6"},{"key":"e_1_3_3_153_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-24724-1"},{"key":"e_1_3_3_154_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540600622498"},{"key":"e_1_3_3_155_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.31.6.1030"},{"key":"e_1_3_3_156_1","doi-asserted-by":"publisher","DOI":"10.1002\/9781119584445"},{"key":"e_1_3_3_157_1","unstructured":"Spier J. and K. G. Kempf. 1995. \u201cSimulation of Emergent Behavior in Manufacturing Systems.\u201d IEEE\/SEMI Advanced Semiconductor Manufacturing Conference Saratoga Springs NY."},{"key":"e_1_3_3_158_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.01.019"},{"key":"e_1_3_3_159_1","volume-title":"Graduate School of Industrial Administration, Carnegie-Mellon University","author":"Srinivasan A.","year":"1988","unstructured":"Srinivasan, A., M. Carey, and T. E. Morton. 1988. \u201cResource Pricing and Aggregate Scheduling in Manufacturing Systems.\u201d In Graduate School of Industrial Administration, Carnegie-Mellon University. Pittsburgh, PA."},{"key":"e_1_3_3_160_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-55309-7"},{"key":"e_1_3_3_161_1","doi-asserted-by":"publisher","DOI":"10.1080\/002075498194001"},{"key":"e_1_3_3_162_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2007.06.036"},{"key":"e_1_3_3_163_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207547708943149"},{"key":"e_1_3_3_164_1","volume-title":"Valuation of Hospital Resources: An Optimization Approach Using Clearing Functions","author":"Sutterer P.","year":"2021","unstructured":"Sutterer, P., R. Kolisch, and R. Uzsoy. 2021. Valuation of Hospital Resources: An Optimization Approach Using Clearing Functions. Raleigh, NC: Fitts Department of Industrial and Systems Engineering, North Carolina State University."},{"key":"e_1_3_3_165_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(00)00240-X"},{"key":"e_1_3_3_166_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2010.519000"},{"key":"e_1_3_3_167_1","doi-asserted-by":"publisher","DOI":"10.1201\/b19735"},{"key":"e_1_3_3_168_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2010.2094630"},{"key":"e_1_3_3_169_1","volume-title":"Manufacturing Planning and Control for Supply Chain Management","author":"Vollmann T. E.","year":"2005","unstructured":"Vollmann, T. E., W. L. Berry, D. C. Whybark, and F. R. Jacobs. 2005. Manufacturing Planning and Control for Supply Chain Management. New York: McGraw-Hill."},{"key":"e_1_3_3_170_1","volume-title":"Introduction to Computational Optimization Models for Production Planning in a Supply Chain","author":"Voss S.","year":"2006","unstructured":"Voss, S., and D. L. Woodruff. 2006. Introduction to Computational Optimization Models for Production Planning in a Supply Chain. New York, NY: Springer."},{"key":"e_1_3_3_171_1","doi-asserted-by":"publisher","DOI":"10.2307\/20721413"},{"key":"e_1_3_3_172_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-57743-7"},{"key":"e_1_3_3_173_1","volume-title":"Fertigungsregelung: Logistische Beherrschung von Fertigungsabl\u00e4ufen auf Basis des Trichtermodells; 42 Tabellen","author":"Wiendahl H. P.","year":"1997","unstructured":"Wiendahl, H. P. 1997. Fertigungsregelung: Logistische Beherrschung von Fertigungsabl\u00e4ufen auf Basis des Trichtermodells; 42 Tabellen. Hanser, Munich Vienna."},{"key":"e_1_3_3_174_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-65055-5"},{"issue":"3","key":"e_1_3_3_175_1","first-page":"9","article-title":"Input-Output Control: A Real Handle on Lead Times","volume":"11","author":"Wight O.","year":"1970","unstructured":"Wight, O. 1970. \u201cInput-Output Control: A Real Handle on Lead Times.\u201d Production and Inventory Management Journal 11 (3): 9\u201331.","journal-title":"Production and Inventory Management Journal"},{"key":"e_1_3_3_176_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(03)00400-4"},{"key":"e_1_3_3_177_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1444806"},{"key":"e_1_3_3_178_1","doi-asserted-by":"publisher","DOI":"10.1080\/09537287.2016.1183831"},{"key":"e_1_3_3_179_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1403664"},{"key":"e_1_3_3_180_1","doi-asserted-by":"publisher","DOI":"10.1016\/0925-5273(93)90085-Y"},{"key":"e_1_3_3_181_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10462-018-9667-6"},{"key":"e_1_3_3_182_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1478461"},{"key":"e_1_3_3_183_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2019.2958526"},{"key":"e_1_3_3_184_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.34.1.91"},{"key":"e_1_3_3_185_1","volume-title":"Foundations of Inventory Management","author":"Zipkin P. H.","year":"2000","unstructured":"Zipkin, P. H. 2000. Foundations of Inventory Management. Burr Ridge, IL: Irwin."}],"container-title":["International Journal of Production Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.tandfonline.com\/doi\/pdf\/10.1080\/00207543.2021.1994165","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,1,29]],"date-time":"2026-01-29T17:23:33Z","timestamp":1769707413000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.tandfonline.com\/doi\/full\/10.1080\/00207543.2021.1994165"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,11,5]]},"references-count":184,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2022,1,2]]}},"alternative-id":["10.1080\/00207543.2021.1994165"],"URL":"https:\/\/doi.org\/10.1080\/00207543.2021.1994165","relation":{},"ISSN":["0020-7543","1366-588X"],"issn-type":[{"value":"0020-7543","type":"print"},{"value":"1366-588X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2021,11,5]]},"assertion":[{"value":"The publishing and review policy for this title is described in its Aims & Scope.","order":1,"name":"peerreview_statement","label":"Peer Review Statement"},{"value":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","URL":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","order":2,"name":"aims_and_scope_url","label":"Aim & Scope"},{"value":"2021-05-15","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2021-10-01","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2021-11-05","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}