{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,30]],"date-time":"2026-04-30T17:04:16Z","timestamp":1777568656079,"version":"3.51.4"},"reference-count":60,"publisher":"Informa UK Limited","issue":"7","license":[{"start":{"date-parts":[[2023,5,30]],"date-time":"2023-05-30T00:00:00Z","timestamp":1685404800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by-nc-nd\/4.0\/"}],"content-domain":{"domain":["www.tandfonline.com"],"crossmark-restriction":true},"short-container-title":["International Journal of Production Research"],"published-print":{"date-parts":[[2024,4,2]]},"DOI":"10.1080\/00207543.2023.2217301","type":"journal-article","created":{"date-parts":[[2023,5,30]],"date-time":"2023-05-30T11:33:22Z","timestamp":1685446402000},"page":"2415-2434","update-policy":"https:\/\/doi.org\/10.1080\/tandf_crossmark_01","source":"Crossref","is-referenced-by-count":6,"title":["Order release optimisation for time-dependent and stochastic manufacturing systems"],"prefix":"10.1080","volume":"62","author":[{"given":"Hubert","family":"Missbauer","sequence":"first","affiliation":[{"name":"Department of Information Systems, Production and Logistics Management, University of Innsbruck, Innsbruck, Austria"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Raik","family":"Stolletz","sequence":"additional","affiliation":[{"name":"Chair of Production Management, University of Mannheim, Mannheim, Germany"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Manuel","family":"Schneckenreither","sequence":"additional","affiliation":[{"name":"Department of Information Systems, Production and Logistics Management, University of Innsbruck, Innsbruck, Austria"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"301","published-online":{"date-parts":[[2023,5,30]]},"reference":[{"key":"e_1_3_3_2_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.42.4.750"},{"key":"e_1_3_3_3_1","doi-asserted-by":"crossref","unstructured":"Aouam T. and R. Uzsoy. 2012. \u201cChance-Constraint-Based Heuristics for Production Planning in the Face of Stochastic Demand and Workload-Dependent Lead Times\u201d. In Decision Policies for Production Networks edited by D. Armbruster and K. G. Kempf 173\u2013208. Springer.","DOI":"10.1007\/978-0-85729-644-3_8"},{"key":"e_1_3_3_4_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12159-012-0087-8"},{"key":"e_1_3_3_5_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1398432"},{"key":"e_1_3_3_6_1","doi-asserted-by":"publisher","DOI":"10.1002\/nav.v56:2"},{"key":"e_1_3_3_7_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2005.863214"},{"key":"e_1_3_3_8_1","volume-title":"Production Control and Information Systems for Component-manufacturing Shops","author":"Bertrand J. W. M.","year":"1981","unstructured":"Bertrand, J. W. M., and J. C. Wortmann. 1981. Production Control and Information Systems for Component-manufacturing Shops. Amsterdam-Oxford-New York: Elsevier."},{"key":"e_1_3_3_9_1","volume-title":"Production Control: A Structural and Design Oriented Approach","author":"Bertrand J. W. M.","year":"1990","unstructured":"Bertrand, J. W. M., J. C. Wortmann, and J. Wijngaard. 1990. Production Control: A Structural and Design Oriented Approach. Amsterdam [u.a.]: Elsevier."},{"key":"e_1_3_3_10_1","doi-asserted-by":"crossref","unstructured":"Boulaksil Y. J. C. Fransoo and E. N. van Halm. 2009. Setting Safety Stocks in Multi-Stage Inventory Systems Under Rolling Horizon Mathematical Programming Models. In Supply Chain Planning edited by H. Meyr and H.-O. G\u00fcnther 199\u2013218. Springer.","DOI":"10.1007\/978-3-540-93775-3_8"},{"key":"e_1_3_3_11_1","doi-asserted-by":"publisher","DOI":"10.1007\/PL00011391"},{"key":"e_1_3_3_12_1","doi-asserted-by":"publisher","DOI":"10.1137\/S1052623497325107"},{"key":"e_1_3_3_13_1","doi-asserted-by":"publisher","DOI":"10.1287\/opre.35.1.58"},{"key":"e_1_3_3_14_1","doi-asserted-by":"publisher","DOI":"10.1016\/0191-2615(92)90003-F"},{"key":"e_1_3_3_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0191-2615(99)00019-3"},{"key":"e_1_3_3_16_1","doi-asserted-by":"crossref","unstructured":"de Kok T. G. and J. C. Fransoo. 2003. Planning Supply Chain Operations: Definition and comparison of planning concepts. In Supply Chain Management: Design Coordination and Operation edited by T. G. De Kok and S. C. Graves 597\u2013675. Amsterdam: Elsevier.","DOI":"10.1016\/S0927-0507(03)11012-2"},{"key":"e_1_3_3_17_1","doi-asserted-by":"publisher","DOI":"10.1023\/A:1022602019183"},{"key":"e_1_3_3_18_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1557351"},{"key":"e_1_3_3_19_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2020.11.039"},{"key":"e_1_3_3_20_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.45.1.86"},{"key":"e_1_3_3_21_1","doi-asserted-by":"publisher","DOI":"10.1080\/002075499190473"},{"key":"e_1_3_3_22_1","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.1050.0157"},{"key":"e_1_3_3_23_1","doi-asserted-by":"publisher","DOI":"10.1080\/0740817X.2015.1019162"},{"key":"e_1_3_3_24_1","unstructured":"Kacar N. B. 2012. \u201cFitting Clearing Functions to Empirical Data: Simulation Optimization and Heuristic Algorithms.\u201d PhD thesis North Carolina State University."},{"key":"e_1_3_3_25_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSM.2011.2176560"},{"key":"e_1_3_3_26_1","doi-asserted-by":"crossref","unstructured":"Kacar N. B. L. M\u00f6nch and R. Uzsoy. 2018. \u201cProblem Reduction Approaches for Production Planning Using Clearing Functions.\u201d In 2018 IEEE 14th International Conference on Automation Science and Engineering (CASE) 931\u2013938.","DOI":"10.1109\/COASE.2018.8560429"},{"key":"e_1_3_3_27_1","doi-asserted-by":"crossref","unstructured":"Kacar N. B. and R. Uzsoy. 2010. \u201cEstimating Clearing Functions from Simulation Data.\u201d In Proceedings of the Winter Simulation Conference 1699\u20131710.","DOI":"10.1109\/WSC.2010.5678899"},{"key":"e_1_3_3_28_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2010.03.018"},{"key":"e_1_3_3_29_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(00)00037-2"},{"key":"e_1_3_3_30_1","unstructured":"K\u00f8hler Gudum C. and A. De Kok. 2002. A Safety Stock Adjustment Procedure to Enable Target Service Levels in Simulation of Generic Inventory Systems. Working Papers 71. BETA Publicatie."},{"key":"e_1_3_3_31_1","doi-asserted-by":"publisher","DOI":"10.1137\/S1052623403433638"},{"key":"e_1_3_3_32_1","volume-title":"Workload Control in Job Shops, Grasping the Tap","author":"Land M. J.","year":"2004","unstructured":"Land, M. J. 2004. Workload Control in Job Shops, Grasping the Tap. Ridderkerk: Labyrinth Publications."},{"key":"e_1_3_3_33_1","volume-title":"Mittelfristige Produktionsprogrammplanung mit auslastungsabh\u00e4ngigen Vorlaufzeiten","author":"Lautenschl\u00e4ger M.","year":"1999","unstructured":"Lautenschl\u00e4ger, M. 1999. Mittelfristige Produktionsprogrammplanung mit auslastungsabh\u00e4ngigen Vorlaufzeiten. Frankfurt am Main: Peter Lang."},{"key":"e_1_3_3_34_1","doi-asserted-by":"publisher","DOI":"10.1137\/050635432"},{"key":"e_1_3_3_35_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2015.11.004"},{"key":"e_1_3_3_36_1","doi-asserted-by":"publisher","DOI":"10.1287\/trsc.12.3.183"},{"issue":"2","key":"e_1_3_3_37_1","first-page":"245","article-title":"Die Implikationen durchlauforientierter Losbildung f\u00fcr die Komplexit\u00e4t der Produktionsplanung und -steuerung","volume":"69","author":"Missbauer H.","year":"1999","unstructured":"Missbauer, H. 1999. \u201cDie Implikationen durchlauforientierter Losbildung f\u00fcr die Komplexit\u00e4t der Produktionsplanung und -steuerung.\u201d Zeitschrift f\u00fcr Betriebswirtschaft 69 (2): 245\u2013265.","journal-title":"Zeitschrift f\u00fcr Betriebswirtschaft"},{"key":"e_1_3_3_38_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540110090939"},{"key":"e_1_3_3_39_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2008.11.014"},{"key":"e_1_3_3_40_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2009.09.003"},{"key":"e_1_3_3_41_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-0716-0354-3"},{"key":"e_1_3_3_42_1","doi-asserted-by":"publisher","DOI":"10.2307\/1905580"},{"key":"e_1_3_3_43_1","doi-asserted-by":"publisher","DOI":"10.1023\/A:1012827724856"},{"key":"e_1_3_3_44_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2011.09.012"},{"key":"e_1_3_3_45_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-540-24724-1"},{"key":"e_1_3_3_46_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2015.10.013"},{"key":"e_1_3_3_47_1","doi-asserted-by":"publisher","DOI":"10.1080\/07408170701487997"},{"key":"e_1_3_3_48_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2014.06.005"},{"key":"e_1_3_3_49_1","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.2021.1090"},{"key":"e_1_3_3_50_1","doi-asserted-by":"publisher","DOI":"10.1002\/9781119453765"},{"key":"e_1_3_3_51_1","doi-asserted-by":"publisher","DOI":"10.1109\/9.119632"},{"key":"e_1_3_3_52_1","doi-asserted-by":"publisher","DOI":"10.1109\/7.705889"},{"key":"e_1_3_3_53_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2007.06.036"},{"key":"e_1_3_3_54_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00291-007-0099-y"},{"key":"e_1_3_3_55_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11134-022-09759-6"},{"key":"e_1_3_3_56_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2012.678946"},{"key":"e_1_3_3_57_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2010.519000"},{"key":"e_1_3_3_58_1","doi-asserted-by":"crossref","unstructured":"Vogel J. and R. Stolletz. 2021. \u201cAnticipation of Future Demand Changes in Capacity Planning: The Inverse Capacity Boost.\u201d Available at SSRN: https:\/\/ssrn.com\/abstract=3882550.","DOI":"10.2139\/ssrn.3882550"},{"key":"e_1_3_3_59_1","volume-title":"Introduction to Computational Optimization Models for Production Planning in a Supply Chain","author":"Vo\u00df S.","year":"2006","unstructured":"Vo\u00df, S., and D. L. Woodruff. 2006. Introduction to Computational Optimization Models for Production Planning in a Supply Chain. Berlin, Heidelberg: Springer ."},{"key":"e_1_3_3_60_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2012.05.040"},{"key":"e_1_3_3_61_1","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(93)90287-W"}],"container-title":["International Journal of Production Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.tandfonline.com\/doi\/pdf\/10.1080\/00207543.2023.2217301","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,3,1]],"date-time":"2024-03-01T12:25:47Z","timestamp":1709295947000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.tandfonline.com\/doi\/full\/10.1080\/00207543.2023.2217301"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,5,30]]},"references-count":60,"journal-issue":{"issue":"7","published-print":{"date-parts":[[2024,4,2]]}},"alternative-id":["10.1080\/00207543.2023.2217301"],"URL":"https:\/\/doi.org\/10.1080\/00207543.2023.2217301","relation":{},"ISSN":["0020-7543","1366-588X"],"issn-type":[{"value":"0020-7543","type":"print"},{"value":"1366-588X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,5,30]]},"assertion":[{"value":"The publishing and review policy for this title is described in its Aims & Scope.","order":1,"name":"peerreview_statement","label":"Peer Review Statement"},{"value":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","URL":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","order":2,"name":"aims_and_scope_url","label":"Aim & Scope"},{"value":"2022-08-23","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2023-04-06","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2023-05-30","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}