{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,25]],"date-time":"2026-06-25T16:50:29Z","timestamp":1782406229644,"version":"3.54.5"},"reference-count":211,"publisher":"Informa UK Limited","issue":"12","content-domain":{"domain":["www.tandfonline.com"],"crossmark-restriction":true},"short-container-title":["International Journal of Production Research"],"published-print":{"date-parts":[[2024,6,17]]},"DOI":"10.1080\/00207543.2023.2263577","type":"journal-article","created":{"date-parts":[[2023,10,5]],"date-time":"2023-10-05T12:54:56Z","timestamp":1696510496000},"page":"4565-4594","update-policy":"https:\/\/doi.org\/10.1080\/tandf_crossmark_01","source":"Crossref","is-referenced-by-count":16,"title":["A comprehensive literature review of the flowshop group scheduling problems: systematic and bibliometric reviews"],"prefix":"10.1080","volume":"62","author":[{"given":"Nilg\u00fcn","family":"\u0130nce","sequence":"first","affiliation":[{"name":"Department of Industrial Engineering, Institute of Natural Sciences, Sakarya University, Sakarya, Turkey"},{"name":"Department of Industrial Engineering, Rafet Kay\u0131\u015f Faculty of Engineering, Alanya Alaaddin Keykubat University, Antalya, Turkey"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Derya","family":"Delikta\u015f","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering, Faculty of Engineering, K\u00fctahya Dumlup\u0131nar University, K\u00fctahya, Turkey"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"\u0130hsan","family":"Hakan Selvi","sequence":"additional","affiliation":[{"name":"Department of Information Systems Engineering, Faculty of Computer and Information Sciences, Sakarya University, Sakarya, Turkey"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"301","published-online":{"date-parts":[[2023,10,5]]},"reference":[{"key":"e_1_3_4_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2015.04.004"},{"key":"e_1_3_4_3_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.06.060"},{"key":"e_1_3_4_4_1","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(90)90158-I"},{"key":"e_1_3_4_5_1","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.40.7.868"},{"key":"e_1_3_4_6_1","doi-asserted-by":"publisher","DOI":"10.1080\/095372898233696"},{"key":"e_1_3_4_7_1","doi-asserted-by":"publisher","DOI":"10.1080\/0020754021000042959"},{"key":"e_1_3_4_8_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.06.040"},{"key":"e_1_3_4_9_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2021.1923854"},{"key":"e_1_3_4_10_1","doi-asserted-by":"publisher","DOI":"10.1504\/EJIE.2017.081418"},{"key":"e_1_3_4_11_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-009-2147-z"},{"key":"e_1_3_4_12_1","doi-asserted-by":"publisher","DOI":"10.1080\/09511928908944401"},{"key":"e_1_3_4_13_1","doi-asserted-by":"publisher","DOI":"10.1080\/07408179908969838"},{"key":"e_1_3_4_14_1","doi-asserted-by":"publisher","DOI":"10.1080\/07408179708966323"},{"key":"e_1_3_4_15_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2010.06.006"},{"key":"e_1_3_4_16_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2012.02.032"},{"key":"e_1_3_4_17_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2013.05.015"},{"key":"e_1_3_4_18_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-015-7650-9"},{"key":"e_1_3_4_19_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-021-00704-8"},{"key":"e_1_3_4_20_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-009-2112-x"},{"key":"e_1_3_4_21_1","doi-asserted-by":"crossref","unstructured":"Celano G. A. Costa and S. Fichera. 2011. \u201cFlow Shop Group Scheduling with Limited Buffer Capacity and Different Workforce.\u201d In ICINCO (2) 486\u2013491.","DOI":"10.5220\/0003648704860491"},{"key":"e_1_3_4_22_1","doi-asserted-by":"crossref","unstructured":"Chen Y. and Y. Cheng. 2021. \u201cGroup Scheduling and Due Date Assignment Without Restriction on A Single Machine.\u201d In Advances in Production Management Systems. Artificial Intelligence for Sustainable and Resilient Production Systems: IFIP WG 5.7 International Conference APMS 2021 Proceedings Part III 250\u2013257. Nantes France: Springer.","DOI":"10.1007\/978-3-030-85906-0_28"},{"key":"e_1_3_4_23_1","first-page":"288","article-title":"Bottleneck-based Group Scheduling in a Flow Line Cell","volume":"5","author":"Chen Y. C.","year":"1998","unstructured":"Chen, Y. C., and C. C. Lee. 1998. \u201cBottleneck-based Group Scheduling in a Flow Line Cell.\u201d International Journal of Industrial Engineering-Theory Applications and Proctaice 5:288\u2013300.","journal-title":"International Journal of Industrial Engineering-Theory Applications and Proctaice"},{"key":"e_1_3_4_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2012.04.009"},{"key":"e_1_3_4_25_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2013.06.003"},{"key":"e_1_3_4_26_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2021.107229"},{"key":"e_1_3_4_27_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2021.107705"},{"key":"e_1_3_4_28_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2021.107280"},{"key":"e_1_3_4_29_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2011.06.008"},{"key":"e_1_3_4_30_1","first-page":"442","article-title":"A Hybrid Genetic Algorithm for Group Scheduling with Sequence Dependent Group Setup Time","volume":"10","author":"Cho K.","year":"2003","unstructured":"Cho, K., and B. Ahn. 2003. \u201cA Hybrid Genetic Algorithm for Group Scheduling with Sequence Dependent Group Setup Time.\u201d International Journal of Industrial Engineering-Theory Applications and Practice10:442\u2013448.","journal-title":"International Journal of Industrial Engineering-Theory Applications and Practice"},{"key":"e_1_3_4_31_1","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.12.1.24.11899"},{"key":"e_1_3_4_32_1","doi-asserted-by":"publisher","DOI":"10.3390\/a7030376"},{"key":"e_1_3_4_33_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.883469"},{"key":"e_1_3_4_34_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-015-1049-1"},{"key":"e_1_3_4_35_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2019.103413"},{"key":"e_1_3_4_36_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.asoc.2021.107890"},{"key":"e_1_3_4_37_1","doi-asserted-by":"publisher","DOI":"10.1111\/itor.2019.26.issue-6"},{"key":"e_1_3_4_38_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2004.03.013"},{"key":"e_1_3_4_39_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.apm.2013.10.061"},{"key":"e_1_3_4_40_1","doi-asserted-by":"crossref","unstructured":"Eddaly M. B. Jarboui R. Bouabda and A. Rebai. 2009. \u201cHybrid Estimation of Distribution Algorithm for Permutation Flowshop Scheduling Problem with Sequence Dependent Family Setup Times.\u201d In 2009 International Conference on Computers & Industrial Engineering 217\u2013220. Troyes France: IEEE.","DOI":"10.1109\/ICCIE.2009.5223755"},{"key":"e_1_3_4_41_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2011.03.007"},{"key":"e_1_3_4_42_1","doi-asserted-by":"publisher","DOI":"10.1007\/s001700200105"},{"key":"e_1_3_4_43_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.01.029"},{"key":"e_1_3_4_44_1","doi-asserted-by":"publisher","DOI":"10.1007\/s13369-013-0611-4"},{"key":"e_1_3_4_45_1","doi-asserted-by":"crossref","unstructured":"Fahmy S. A. 2016. \u201cOptimal Design and Scheduling of Cellular Manufacturing Systems: An Experimental Study.\u201d In 2016 IEEE International Conference on Systems Man and Cybernetics (SMC) 004532\u2013004537. Budapest Hungary: IEEE.","DOI":"10.1109\/SMC.2016.7844945"},{"key":"e_1_3_4_46_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2018.04.004"},{"key":"e_1_3_4_47_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2016.09.055"},{"key":"e_1_3_4_48_1","doi-asserted-by":"publisher","DOI":"10.1155\/2015\/124258"},{"key":"e_1_3_4_49_1","doi-asserted-by":"publisher","DOI":"10.1057\/palgrave.jors.2601784"},{"key":"e_1_3_4_50_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2003.11.004"},{"key":"e_1_3_4_51_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207549608904945"},{"key":"e_1_3_4_52_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-009-0147-3"},{"key":"e_1_3_4_53_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-009-2322-2"},{"key":"e_1_3_4_54_1","doi-asserted-by":"publisher","DOI":"10.3934\/jimo.2021124"},{"key":"e_1_3_4_55_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0167-5060(08)70356-X"},{"key":"e_1_3_4_56_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540601009976"},{"key":"e_1_3_4_57_1","unstructured":"Gupta A. P. Jog and S. Webster. 1996. \u201cUsing Genetic Algorithms for Scheduling with Multiple Families and Setup Times.\u201d In Proceedings of the ISCA 11th International Conference on Computers and Their Applications Vol. 7 298. San Francisco CA: International Society for Computers and Their Applications (ISCA)."},{"key":"e_1_3_4_58_1","doi-asserted-by":"publisher","DOI":"10.1057\/palgrave.jors.2601971"},{"key":"e_1_3_4_59_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.scient.2011.05.023"},{"key":"e_1_3_4_60_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540310001657595"},{"key":"e_1_3_4_61_1","doi-asserted-by":"crossref","unstructured":"He X. Y.-F. Liu Q.-K. Pan Y. Yu and Y.-Z. Li. 2021. \u201cA Novel Constructive Heuristic for Flowshop Group Scheduling Problems to Minimize Total Flow Time.\u201d In 2021 40th Chinese Control Conference (CCC) 1639\u20131644. Shanghai China: IEEE.","DOI":"10.23919\/CCC52363.2021.9549650"},{"key":"e_1_3_4_62_1","doi-asserted-by":"publisher","DOI":"10.1504\/EJIE.2007.015388"},{"key":"e_1_3_4_63_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2007.02.031"},{"key":"e_1_3_4_64_1","doi-asserted-by":"publisher","DOI":"10.1007\/s12190-018-01222-1"},{"key":"e_1_3_4_65_1","doi-asserted-by":"crossref","unstructured":"Huang P.-Y. T.-P. Hong G. Horng and C.-Y. Kao. 2004. \u201cExtending the Palmer Algorithm to Solve Group Flexible Flow-Shop Problems.\u201d In 30th Annual Conference of IEEE Industrial Electronics Society 2004. IECON 2004 Vol. 2 1902\u20131907. Busan South Korea: IEEE.","DOI":"10.1109\/IECON.2004.1431874"},{"key":"e_1_3_4_66_1","doi-asserted-by":"publisher","DOI":"10.1080\/0305215X.2021.1983806"},{"key":"e_1_3_4_67_1","doi-asserted-by":"publisher","DOI":"10.3390\/math8122225"},{"key":"e_1_3_4_68_1","doi-asserted-by":"crossref","unstructured":"Huzayyin A. M. Badr and M. Helal. 2000. \u201cAn Investigation of The Group Scheduling Heuristics in A Flow-Line Cell.\u201d In Current Advances in Mechanical Design and Production VII 591\u2013601. Cairo-Egypt: Elsevier.","DOI":"10.1016\/B978-008043711-8\/50060-X"},{"key":"e_1_3_4_69_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.procir.2014.01.072"},{"key":"e_1_3_4_70_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2018.1518602"},{"key":"e_1_3_4_71_1","first-page":"48","article-title":"Balancing and Simulating Inter-cell and Intra-cell Moves Costs in a Cellular Manufacturing System","volume":"1","author":"Iqbal A.","year":"2010","unstructured":"Iqbal, A. 2010. \u201cBalancing and Simulating Inter-cell and Intra-cell Moves Costs in a Cellular Manufacturing System.\u201d Journal of Studies on Manufacturing 1:48\u201353.","journal-title":"Journal of Studies on Manufacturing"},{"key":"e_1_3_4_72_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1058538"},{"key":"e_1_3_4_73_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2021.108242"},{"key":"e_1_3_4_74_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-010-3039-y"},{"key":"e_1_3_4_75_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2009.09.005"},{"key":"e_1_3_4_76_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2010.481644"},{"key":"e_1_3_4_77_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.825055"},{"key":"e_1_3_4_78_1","doi-asserted-by":"publisher","DOI":"10.1504\/EJIE.2014.060997"},{"key":"e_1_3_4_79_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-014-1667-6"},{"key":"e_1_3_4_80_1","doi-asserted-by":"publisher","DOI":"10.1504\/EJIE.2019.097920"},{"key":"e_1_3_4_81_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-014-6429-8"},{"key":"e_1_3_4_82_1","doi-asserted-by":"publisher","DOI":"10.1177\/014107680309600304"},{"key":"e_1_3_4_83_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2012.01.012"},{"key":"e_1_3_4_84_1","first-page":"1","article-title":"Procedures for Performing Systematic Reviews","volume":"33","author":"Kitchenham B.","year":"2004","unstructured":"Kitchenham, B. 2004. \u201cProcedures for Performing Systematic Reviews.\u201d Keele, UK, Keele University33:1\u201326.","journal-title":"Keele, UK, Keele University"},{"key":"e_1_3_4_85_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2010.01.006"},{"key":"e_1_3_4_86_1","doi-asserted-by":"publisher","DOI":"10.1177\/003754979606600207"},{"key":"e_1_3_4_87_1","doi-asserted-by":"publisher","DOI":"10.1080\/002075499190554"},{"key":"e_1_3_4_88_1","first-page":"67","article-title":"Analysis of Sequencing Heuristics in a Flexible Flow System with Hybrid Order Shipment Environments","volume":"7","author":"Leu B. Y.","year":"2000","unstructured":"Leu, B. Y., and F. K. Wang. 2000. \u201cAnalysis of Sequencing Heuristics in a Flexible Flow System with Hybrid Order Shipment Environments.\u201d International Journal of Industrial Engineering-Theory and Applications and Practice 7:67\u201375.","journal-title":"International Journal of Industrial Engineering-Theory and Applications and Practice"},{"key":"e_1_3_4_89_1","doi-asserted-by":"crossref","unstructured":"Li Y. and X. Li. 2014. \u201cHybrid Harmony Search for The Flowline Manufacturing Cell Scheduling Problem.\u201d In Proceedings of the 2014 IEEE 18th International Conference on Computer Supported Cooperative Work in Design (CSCWD) 214\u2013219. IEEE.","DOI":"10.1109\/CSCWD.2014.6846844"},{"key":"e_1_3_4_90_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2014.09.007"},{"key":"e_1_3_4_91_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2012.11.024"},{"key":"e_1_3_4_92_1","doi-asserted-by":"crossref","unstructured":"Li Y. X. Zhu and F. Xiao. 2018. \u201cHeuristic Algorithms for Fowline Cellular Manufacturing System Scheduling.\u201d In 2018 IEEE 22nd International Conference on Computer Supported Cooperative Work in Design ((CSCWD)) 779\u2013784. Nanjing China: IEEE.","DOI":"10.1109\/CSCWD.2018.8465219"},{"key":"e_1_3_4_93_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.camwa.2011.10.077"},{"key":"e_1_3_4_94_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10878-019-00452-8"},{"key":"e_1_3_4_95_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11590-020-01581-4"},{"key":"e_1_3_4_96_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540701813210"},{"key":"e_1_3_4_97_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540701484939"},{"key":"e_1_3_4_98_1","doi-asserted-by":"publisher","DOI":"10.1504\/EJIE.2012.047666"},{"key":"e_1_3_4_99_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2018.12.025"},{"key":"e_1_3_4_100_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2007.12.010"},{"key":"e_1_3_4_101_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2011.01.004"},{"key":"e_1_3_4_102_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2015.10.002"},{"key":"e_1_3_4_103_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207721.2011.581396"},{"key":"e_1_3_4_104_1","doi-asserted-by":"crossref","unstructured":"Liou C.-D. and C.-H. Liu. 2010. \u201cA Novel Encoding Scheme of PSO for Two-Machine Group Scheduling.\u201d In International Conference in Swarm Intelligence 128\u2013134. Berlin Heidelberg: Springer.","DOI":"10.1007\/978-3-642-13495-1_16"},{"key":"e_1_3_4_105_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1113328"},{"key":"e_1_3_4_106_1","article-title":"Study on Single-machine Group Scheduling with Due-window Assignment and Position-dependent Weights","volume":"2021","author":"Liu W.","year":"2021","unstructured":"Liu, W., X. Wang, X. Wang, and P. Zhao. 2021. \u201cStudy on Single-machine Group Scheduling with Due-window Assignment and Position-dependent Weights.\u201d Mathematical Problems in Engineering2021:2232696.","journal-title":"Mathematical Problems in Engineering"},{"key":"e_1_3_4_107_1","doi-asserted-by":"publisher","DOI":"10.1080\/0305215X.2018.1500562"},{"key":"e_1_3_4_108_1","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(92)90076-V"},{"key":"e_1_3_4_109_1","unstructured":"Logendran R. 1998. \u201cGroup Scheduling for Cellular Manufacturing Systems.\u201d In Group Technology and Cellular Manufacturing. Methodologies and Applications 153\u2013208.\u00a0Gordon and Breach Science Publishers New York."},{"key":"e_1_3_4_110_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2004.03.011"},{"key":"e_1_3_4_111_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2005.02.006"},{"key":"e_1_3_4_112_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0736-5845(02)00059-5"},{"key":"e_1_3_4_113_1","doi-asserted-by":"publisher","DOI":"10.1016\/0925-5273(94)00083-M"},{"key":"e_1_3_4_114_1","doi-asserted-by":"publisher","DOI":"10.1016\/0925-5273(91)90098-E"},{"key":"e_1_3_4_115_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2004.07.004"},{"key":"e_1_3_4_116_1","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(93)90029-M"},{"key":"e_1_3_4_117_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11590-018-1322-2"},{"key":"e_1_3_4_118_1","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2012.61"},{"key":"e_1_3_4_119_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.560620"},{"key":"e_1_3_4_120_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2020.106941"},{"key":"e_1_3_4_121_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207549108948058"},{"key":"e_1_3_4_122_1","doi-asserted-by":"publisher","DOI":"10.1080\/09537289208919375"},{"key":"e_1_3_4_123_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207549008942824"},{"key":"e_1_3_4_124_1","doi-asserted-by":"publisher","DOI":"10.1111\/deci.1992.23.issue-1"},{"key":"e_1_3_4_125_1","doi-asserted-by":"publisher","DOI":"10.22581\/muet1982"},{"key":"e_1_3_4_126_1","doi-asserted-by":"crossref","unstructured":"Mendes N. F. M. J. E. C. Arroyo and H. M. M. Villadiego. 2013. \u201cLocal Search Heuristics for the Flowshop Sequence Dependent Group Scheduling Problem.\u201d In 2013 XXXIX Latin American Computing Conference (CLEI) 1\u20137.\u00a0Caracas Venezuela:\u00a0IEEE.","DOI":"10.1109\/CLEI.2013.6670645"},{"key":"e_1_3_4_127_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2019.06.069"},{"key":"e_1_3_4_128_1","doi-asserted-by":"publisher","DOI":"10.7326\/0003-4819-151-4-200908180-00135"},{"key":"e_1_3_4_129_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jksuci.2022.03.027"},{"key":"e_1_3_4_130_1","doi-asserted-by":"publisher","DOI":"10.1504\/EJIE.2012.045604"},{"key":"e_1_3_4_131_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.961209"},{"key":"e_1_3_4_132_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2015.12.006"},{"key":"e_1_3_4_133_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2019.1683251"},{"key":"e_1_3_4_134_1","doi-asserted-by":"publisher","DOI":"10.4018\/IJAMC"},{"key":"e_1_3_4_135_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-014-5696-8"},{"key":"e_1_3_4_136_1","doi-asserted-by":"publisher","DOI":"10.1109\/TCYB.2020.3041494"},{"key":"e_1_3_4_137_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-031-05921-6"},{"key":"e_1_3_4_138_1","doi-asserted-by":"publisher","DOI":"10.1007\/s001700050149"},{"key":"e_1_3_4_139_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2015.12.001"},{"key":"e_1_3_4_140_1","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(86)90079-3"},{"key":"e_1_3_4_141_1","doi-asserted-by":"publisher","DOI":"10.1080\/17509653.2014.1003109"},{"key":"e_1_3_4_142_1","doi-asserted-by":"publisher","DOI":"10.1080\/0020754050056417"},{"key":"e_1_3_4_143_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2017.05.010"},{"key":"e_1_3_4_144_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207549308956795"},{"key":"e_1_3_4_145_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.04.017"},{"key":"e_1_3_4_146_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2012.07.013"},{"key":"e_1_3_4_147_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2018.05.033"},{"key":"e_1_3_4_148_1","volume-title":"Multi-stage Group Scheduling Problems with Sequence Dependent Setups","author":"Salmasi N.","year":"2005","unstructured":"Salmasi, N. 2005. Multi-stage Group Scheduling Problems with Sequence Dependent Setups. Eugene: Oregon State University."},{"key":"e_1_3_4_149_1","doi-asserted-by":"crossref","unstructured":"Salmasi N. D. Davarnia and R. Logendran. 2009. \u201cA Tight Lower Bound for Makespan Minimization Sequence Dependent Flowshop Group Scheduling Problems.\u201d In 2009 International Conference on Computers & Industrial Engineering 86\u201389. Troyes France: IEEE.","DOI":"10.1109\/ICCIE.2009.5223864"},{"key":"e_1_3_4_150_1","first-page":"48","article-title":"A Heuristic Approach for Multi-stage Sequence-dependent Group Scheduling Problems","volume":"8","author":"Salmasi N.","year":"2008","unstructured":"Salmasi, N., and R. Logendran. 2008. \u201cA Heuristic Approach for Multi-stage Sequence-dependent Group Scheduling Problems.\u201d Journal of Industrial Engineering International 8:48\u201358.","journal-title":"Journal of Industrial Engineering International"},{"key":"e_1_3_4_151_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2009.04.013"},{"key":"e_1_3_4_152_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-011-3206-9"},{"key":"e_1_3_4_153_1","unstructured":"Schaller J. 1997. \u201cA Comparison of Flow Shop Based Heuristics for Group Scheduling.\u201d In Decision Sciences Institute Vols. 1\u20133 1138\u20131140. San Diego CA: DECISION SCIENCES INSTITUTE."},{"key":"e_1_3_4_154_1","unstructured":"Schaller J. 1998. \u201cOptimal Branch and Bound Procedures for The Group Scheduling Problem.\u201d In Decision Sciences Institute Proceedings Vols. 1\u20133 1391\u20131393.\u00a0Las Vegas: Decision Sciences Institute."},{"key":"e_1_3_4_155_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(01)00049-3"},{"key":"e_1_3_4_156_1","unstructured":"Schaller J. J. Gupta and A. Vakharia. 1997. \u201cGroup Scheduling with Sequence Dependent Setups.\u201d In Proceedings of the Annual Decision Sciences Institute Meeting 1141\u20131143. San Diego CA: Decision Sciences Institute."},{"key":"e_1_3_4_157_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00387-2"},{"key":"e_1_3_4_158_1","doi-asserted-by":"crossref","unstructured":"Sekkal D. N. and F. Belkaid. 2022. \u201cA Bi-objective Optimization for Flow Shop Group Scheduling Problem with Sequence Dependent Setup Time.\u201d In 2022 14th International Colloquium of Logistics and Supply Chain Management (LOGISTIQUA) 1\u20137. EL JADIDA Morocco: IEEE.","DOI":"10.1109\/LOGISTIQUA55056.2022.9938059"},{"key":"e_1_3_4_159_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2016.06.005"},{"key":"e_1_3_4_160_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2016.07.021"},{"key":"e_1_3_4_161_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2017.10.015"},{"key":"e_1_3_4_162_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.604051"},{"key":"e_1_3_4_163_1","doi-asserted-by":"publisher","DOI":"10.1108\/01443579610125796"},{"key":"e_1_3_4_164_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10951-014-0369-x"},{"key":"e_1_3_4_165_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540410001708461"},{"key":"e_1_3_4_166_1","doi-asserted-by":"publisher","DOI":"10.1051\/ro\/2020055"},{"key":"e_1_3_4_167_1","doi-asserted-by":"publisher","DOI":"10.1080\/0951192X.2011.552527"},{"key":"e_1_3_4_168_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2012.10.001"},{"key":"e_1_3_4_169_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(03)00196-8"},{"key":"e_1_3_4_170_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2014.903343"},{"key":"e_1_3_4_171_1","doi-asserted-by":"crossref","unstructured":"Tavakkoli-Moghaddam R. A. Bozorgzad and Y. Gholipour-Kanani. 2007. \u201cThe Use of Memetic Algorithm in Operations Scheduling of Cellular Manufacturing Systems with Makespan.\u201d In 2007 IEEE International Conference on Industrial Engineering and Engineering Management 1120\u20131124. Singapore: IEEE.","DOI":"10.1109\/IEEM.2007.4419366"},{"key":"e_1_3_4_172_1","doi-asserted-by":"crossref","unstructured":"Tavakkoli-Moghaddam R. Y. Jafari-Zarandini and Y. Gholipour-Kanani. 2010. \u201cMulti-Objective Particle Swarm Optimization for Sequencing and Scheduling a Cellular Manufacturing System.\u201d In International Conference on Intelligent Computing 69\u201375. Springer.","DOI":"10.1007\/978-3-642-14831-6_10"},{"key":"e_1_3_4_173_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2009.08.012"},{"key":"e_1_3_4_174_1","doi-asserted-by":"publisher","DOI":"10.1186\/s41182-018-0133-6"},{"key":"e_1_3_4_175_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-030-96917-2"},{"key":"e_1_3_4_176_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540902927926"},{"key":"e_1_3_4_177_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2012.756590"},{"key":"e_1_3_4_178_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1011289"},{"key":"e_1_3_4_179_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2017.1317926"},{"key":"e_1_3_4_180_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2010.537704"},{"key":"e_1_3_4_181_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11192-009-0146-3"},{"key":"e_1_3_4_182_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.632385"},{"key":"e_1_3_4_183_1","doi-asserted-by":"crossref","unstructured":"Villadiego H. M. M. J. E. C. Arroyo V. V. Jacob and L. B. Gon\u00e7alves. 2012. \u201cAn Efficient ILS Heuristic for Total Flow Time Minimization in A Flow Shop Sequence Dependent Group Scheduling Problem.\u201d In 2012 12th International Conference on Hybrid Intelligent Systems (HIS) 259\u2013264. Pune India: IEEE.","DOI":"10.1109\/HIS.2012.6421344"},{"key":"e_1_3_4_184_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10878-017-0233-y"},{"key":"e_1_3_4_185_1","doi-asserted-by":"publisher","DOI":"10.1051\/ro\/2022078"},{"key":"e_1_3_4_186_1","doi-asserted-by":"publisher","DOI":"10.1080\/0305215X.2018.1454442"},{"key":"e_1_3_4_187_1","doi-asserted-by":"publisher","DOI":"10.1093\/comjnl\/bxy007"},{"key":"e_1_3_4_188_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.swevo.2023.101320"},{"key":"e_1_3_4_189_1","first-page":"1","article-title":"Solution Algorithms for Single-machine Group Scheduling with Learning Effect and Convex Resource Allocation","volume":"2021","author":"Wang W.","year":"2021","unstructured":"Wang, W., J.-J. Wang, and J.-B. Wang. 2021. \u201cSolution Algorithms for Single-machine Group Scheduling with Learning Effect and Convex Resource Allocation.\u201d Complexity 2021:1\u201313.","journal-title":"Complexity"},{"key":"e_1_3_4_190_1","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2021\/6685149","article-title":"Group Scheduling with Learning Effect and Random Processing Time","volume":"2021","author":"Wang D.","year":"2021","unstructured":"Wang, D., and C. Ye. 2021. \u201cGroup Scheduling with Learning Effect and Random Processing Time.\u201d Journal of Mathematics 2021:1\u20136.","journal-title":"Journal of Mathematics"},{"key":"e_1_3_4_191_1","doi-asserted-by":"publisher","DOI":"10.1111\/deci.1993.24.issue-4"},{"key":"e_1_3_4_192_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2007.06.021"},{"key":"e_1_3_4_193_1","unstructured":"Wu X. Y. Wang J. Li and C. Chu. 1997. \u201cThe Modeling Study of Cellular Manufacturing System Integration.\u201d In International Conference on Management Science & Engineering Vols. 1\u20132 222\u2013226.\u00a0YICHANG: Harbin Institute Technology Publishers."},{"key":"e_1_3_4_194_1","doi-asserted-by":"publisher","DOI":"10.1109\/TSMC.2019.2917446"},{"key":"e_1_3_4_195_1","doi-asserted-by":"publisher","DOI":"10.1057\/palgrave.jors.2601454"},{"key":"e_1_3_4_196_1","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(99)00070-2"},{"key":"e_1_3_4_197_1","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0548(96)00003-2"},{"key":"e_1_3_4_198_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2020.1757174"},{"key":"e_1_3_4_199_1","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/amm.598.398"},{"key":"e_1_3_4_200_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540802534707"},{"key":"e_1_3_4_201_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-011-3419-y"},{"key":"e_1_3_4_202_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2022.2105763"},{"key":"e_1_3_4_203_1","doi-asserted-by":"publisher","DOI":"10.1007\/s40305-017-0159-1"},{"key":"e_1_3_4_204_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.113360"},{"key":"e_1_3_4_205_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-020-01580-3"},{"key":"e_1_3_4_206_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00170-008-1740-x"},{"key":"e_1_3_4_207_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207540802400636"},{"key":"e_1_3_4_208_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10845-009-0374-7"},{"key":"e_1_3_4_209_1","doi-asserted-by":"publisher","DOI":"10.1109\/JAS.2020.1003539"},{"key":"e_1_3_4_210_1","doi-asserted-by":"crossref","unstructured":"Zhiming W. and Z. Chunwei. 1997. \u201cA Genetic Algorithm for Job Shop Scheduling in Real Time.\u201d In Proceedings of the 1997 American Control Conference (Cat. No. 97CH36041) Vol. 1 162\u2013163. Albuquerque NM USA: IEEE.","DOI":"10.1109\/ACC.1997.611776"},{"key":"e_1_3_4_211_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2021.2017055"},{"key":"e_1_3_4_212_1","doi-asserted-by":"publisher","DOI":"10.1080\/002075499190815"}],"container-title":["International Journal of Production Research"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.tandfonline.com\/doi\/pdf\/10.1080\/00207543.2023.2263577","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,9,24]],"date-time":"2024-09-24T19:04:47Z","timestamp":1727204687000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.tandfonline.com\/doi\/full\/10.1080\/00207543.2023.2263577"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,10,5]]},"references-count":211,"journal-issue":{"issue":"12","published-print":{"date-parts":[[2024,6,17]]}},"alternative-id":["10.1080\/00207543.2023.2263577"],"URL":"https:\/\/doi.org\/10.1080\/00207543.2023.2263577","relation":{},"ISSN":["0020-7543","1366-588X"],"issn-type":[{"value":"0020-7543","type":"print"},{"value":"1366-588X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,10,5]]},"assertion":[{"value":"The publishing and review policy for this title is described in its Aims & Scope.","order":1,"name":"peerreview_statement","label":"Peer Review Statement"},{"value":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","URL":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tprs20","order":2,"name":"aims_and_scope_url","label":"Aim & Scope"},{"value":"2022-12-09","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2023-09-13","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2023-10-05","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}