{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,23]],"date-time":"2026-03-23T20:11:04Z","timestamp":1774296664438,"version":"3.50.1"},"reference-count":53,"publisher":"Informa UK Limited","issue":"11","content-domain":{"domain":["www.tandfonline.com"],"crossmark-restriction":true},"short-container-title":["Journal of the Operational Research Society"],"published-print":{"date-parts":[[2025,11,2]]},"DOI":"10.1080\/01605682.2025.2468790","type":"journal-article","created":{"date-parts":[[2025,2,24]],"date-time":"2025-02-24T03:53:41Z","timestamp":1740369221000},"page":"2359-2376","update-policy":"https:\/\/doi.org\/10.1080\/tandf_crossmark_01","source":"Crossref","is-referenced-by-count":4,"title":["Developing a resilient project portfolio optimization model: a tool for an automotive part manufacturer against uncertainties"],"prefix":"10.1080","volume":"76","author":[{"given":"Mohammadreza","family":"Pishvaei","sequence":"first","affiliation":[{"name":"Department of Industrial Engineering and Management Systems, Amirkabir University of Technology","place":["Tehran, Iran"]}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Maryam","family":"Ashrafi","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering and Management Systems, Amirkabir University of Technology","place":["Tehran, Iran"]}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Mohammad Hossein","family":"Haghighi","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering and Management Systems, Amirkabir University of Technology","place":["Tehran, Iran"]}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"301","published-online":{"date-parts":[[2025,2,24]]},"reference":[{"key":"e_1_3_3_2_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2020.113757"},{"key":"e_1_3_3_3_1","doi-asserted-by":"publisher","DOI":"10.1002\/qre.2737"},{"key":"e_1_3_3_4_1","doi-asserted-by":"publisher","DOI":"10.1108\/BIJ-07-2014-0072"},{"key":"e_1_3_3_5_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.camwa.2011.09.036"},{"key":"e_1_3_3_6_1","doi-asserted-by":"publisher","DOI":"10.4018\/978-1-59904-498-9.ch001"},{"key":"e_1_3_3_7_1","unstructured":"Datta S. and. & Mahapatra S. S. (2014). A decision support system towards suppliers\u2019 selection in resilient supply chain: Exploration of fuzzy-Topsis. International Journal of Management and International Business Studies 4(2) 159\u2013168."},{"key":"e_1_3_3_8_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11081-014-9271-9"},{"key":"e_1_3_3_9_1","doi-asserted-by":"publisher","DOI":"10.1201\/b13102"},{"issue":"2","key":"e_1_3_3_10_1","first-page":"113","article-title":"Resilient supplier selection in a supply chain by a new interval-valued fuzzy group decision model based on possibilistic statistical concepts","volume":"10","author":"Foroozesh N.","year":"2017","unstructured":"Foroozesh, N., Tavakkoli-Moghaddam, R., & Mousavi, S. (2017). Resilient supplier selection in a supply chain by a new interval-valued fuzzy group decision model based on possibilistic statistical concepts. Journal of Industrial and Systems Engineering, 10(2), 113\u2013133.","journal-title":"Journal of Industrial and Systems Engineering"},{"key":"e_1_3_3_11_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00521-018-3506-1"},{"key":"e_1_3_3_12_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00500-023-08445-w"},{"key":"e_1_3_3_13_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ins.2020.08.119"},{"key":"e_1_3_3_14_1","doi-asserted-by":"publisher","DOI":"10.9770\/jesi.2022.9.4(9)"},{"key":"e_1_3_3_15_1","doi-asserted-by":"publisher","DOI":"10.1007\/978-981-10-7323-6_1"},{"issue":"2","key":"e_1_3_3_16_1","first-page":"185","article-title":"A novel fuzzy Bayesian network-based approach for solving the project time-cost-quality trade-off problem","volume":"54","author":"Haghighi M.","year":"2022","unstructured":"Haghighi, M., Ashrafi, M., & Nazerfard, E. (2022). A novel fuzzy Bayesian network-based approach for solving the project time-cost-quality trade-off problem. AUT Journal of Modeling and Simulation, 54(2), 185\u2013196.","journal-title":"AUT Journal of Modeling and Simulation"},{"key":"e_1_3_3_17_1","doi-asserted-by":"publisher","DOI":"10.1080\/17509653.2012.10671234"},{"key":"e_1_3_3_18_1","doi-asserted-by":"publisher","DOI":"10.1108\/ECAM-08-2022-0801"},{"key":"e_1_3_3_19_1","doi-asserted-by":"publisher","DOI":"10.1504\/IJRS.2019.097016"},{"key":"e_1_3_3_20_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2011.09.002"},{"key":"e_1_3_3_21_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jmsy.2016.09.006"},{"key":"e_1_3_3_22_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2016.07.007"},{"key":"e_1_3_3_23_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.01.007"},{"key":"e_1_3_3_24_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2022.105737"},{"key":"e_1_3_3_25_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2019.01.007"},{"key":"e_1_3_3_26_1","article-title":"A Tabu Search Algorithm for Simultaneous Selection and Scheduling of Projects","author":"Kumar M.","year":"2018","unstructured":"Kumar, M., Mittal, M. L., Soni, G., & Joshi, D. (2018). A Tabu Search Algorithm for Simultaneous Selection and Scheduling of Projects. In Harmony Search and Nature Inspired Optimization Algorithms.","journal-title":"Harmony Search and Nature Inspired Optimization Algorithms"},{"key":"e_1_3_3_27_1","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)NH.1527-6996.0000075"},{"key":"e_1_3_3_28_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jlp.2018.11.003"},{"key":"e_1_3_3_29_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2019.08.022"},{"key":"e_1_3_3_30_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.strusafe.2018.08.002"},{"key":"e_1_3_3_31_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2019.106236"},{"key":"e_1_3_3_32_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2021.116067"},{"key":"e_1_3_3_33_1","volume-title":"Organisational resilience in New Zealand","author":"McManus S.","year":"2008","unstructured":"McManus, S. (2008). Organisational resilience in New Zealand. University of Canterbury."},{"issue":"6","key":"e_1_3_3_34_1","first-page":"89","article-title":"A new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling","volume":"16","author":"Mohagheghi V.","year":"2019","unstructured":"Mohagheghi, V., & Mousavi, S., M. (2019). A new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling. Iranian Journal of Fuzzy Systems, 16(6), 89\u2013106.","journal-title":"Iranian Journal of Fuzzy Systems"},{"key":"e_1_3_3_35_1","doi-asserted-by":"publisher","DOI":"10.1007\/s13042-021-01403-8"},{"key":"e_1_3_3_36_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2023.107821"},{"key":"e_1_3_3_37_1","doi-asserted-by":"publisher","DOI":"10.1007\/s00521-022-07207-3"},{"key":"e_1_3_3_38_1","doi-asserted-by":"publisher","DOI":"10.24200\/sci.2019.21387"},{"key":"e_1_3_3_39_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2014.08.054"},{"key":"e_1_3_3_40_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2021.116134"},{"key":"e_1_3_3_41_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2012.05.003"},{"key":"e_1_3_3_42_1","doi-asserted-by":"publisher","DOI":"10.1007\/s11771-016-3061-9"},{"key":"e_1_3_3_43_1","doi-asserted-by":"publisher","DOI":"10.1080\/09537287.2020.1837935"},{"key":"e_1_3_3_44_1","doi-asserted-by":"publisher","DOI":"10.1108\/SEF-08-2012-0085"},{"key":"e_1_3_3_45_1","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2012.710764"},{"key":"e_1_3_3_46_1","doi-asserted-by":"publisher","DOI":"10.24200\/sci.2016.4004"},{"key":"e_1_3_3_47_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.evalprogplan.2019.101703"},{"key":"e_1_3_3_48_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.tre.2015.03.005"},{"key":"e_1_3_3_49_1","doi-asserted-by":"publisher","DOI":"10.1002\/prs.10437"},{"key":"e_1_3_3_50_1","doi-asserted-by":"publisher","DOI":"10.1007\/s10479-019-03375-z"},{"key":"e_1_3_3_51_1","doi-asserted-by":"publisher","DOI":"10.1007\/s13042-017-0737-x"},{"key":"e_1_3_3_52_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jhazmat.2016.09.074"},{"key":"e_1_3_3_53_1","doi-asserted-by":"publisher","DOI":"10.1016\/j.jlp.2018.10.011"},{"key":"e_1_3_3_54_1","doi-asserted-by":"publisher","DOI":"10.3846\/tede.2021.14652"}],"container-title":["Journal of the Operational Research Society"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.tandfonline.com\/doi\/pdf\/10.1080\/01605682.2025.2468790","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,22]],"date-time":"2025-10-22T13:54:00Z","timestamp":1761141240000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.tandfonline.com\/doi\/full\/10.1080\/01605682.2025.2468790"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,2,24]]},"references-count":53,"journal-issue":{"issue":"11","published-print":{"date-parts":[[2025,11,2]]}},"alternative-id":["10.1080\/01605682.2025.2468790"],"URL":"https:\/\/doi.org\/10.1080\/01605682.2025.2468790","relation":{},"ISSN":["0160-5682","1476-9360"],"issn-type":[{"value":"0160-5682","type":"print"},{"value":"1476-9360","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,2,24]]},"assertion":[{"value":"The publishing and review policy for this title is described in its Aims & Scope.","order":1,"name":"peerreview_statement","label":"Peer Review Statement"},{"value":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tjor20","URL":"http:\/\/www.tandfonline.com\/action\/journalInformation?show=aimsScope&journalCode=tjor20","order":2,"name":"aims_and_scope_url","label":"Aim & Scope"},{"value":"2024-04-11","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-02-11","order":1,"name":"revised","label":"Revised","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-02-12","order":2,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2025-02-24","order":3,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}}]}}