{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T08:47:47Z","timestamp":1762505267331},"reference-count":25,"publisher":"Informa UK Limited","issue":"6","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["International Journal of Computer Integrated Manufacturing"],"published-print":{"date-parts":[[2007,9]]},"DOI":"10.1080\/09511920601024179","type":"journal-article","created":{"date-parts":[[2007,7,27]],"date-time":"2007-07-27T09:00:28Z","timestamp":1185526828000},"page":"557-566","source":"Crossref","is-referenced-by-count":15,"title":["Workflow-based dynamic scheduling of job shop operations"],"prefix":"10.1080","volume":"20","author":[{"given":"H. C.","family":"Hwang","sequence":"first","affiliation":[{"name":"a VMS Lab., Department of Industrial Engineering , Korea Advanced Institute of Science and Technology (KAIST) , 373-1 Kusong-dong, Yusong-gu, Daejeon, South Korea"}]},{"given":"B. K.","family":"Choi","sequence":"additional","affiliation":[{"name":"a VMS Lab., Department of Industrial Engineering , Korea Advanced Institute of Science and Technology (KAIST) , 373-1 Kusong-dong, Yusong-gu, Daejeon, South Korea"}]}],"member":"301","published-online":{"date-parts":[[2007,7,25]]},"reference":[{"key":"CIT0001","first-page":"121","volume":"8","author":"Aalst W. M.P.","year":"1998","journal-title":"J. Circuits Syst. Comput."},{"key":"CIT0002","doi-asserted-by":"publisher","DOI":"10.1016\/j.rcim.2004.07.010"},{"key":"CIT0003","doi-asserted-by":"crossref","unstructured":"April , J. Better , M. Glover , F. Kelly , J. P. and Manuel Laguna OptTek Systems, Inc. 2005. \u201cEnhancing business process management with simulation optimization\u201d. Technical Report in BPTrends, Available online at:http:\/\/www.bptrends.com","DOI":"10.1109\/WSC.2006.323141"},{"key":"CIT0004","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(99)00055-8"},{"key":"CIT0005","volume-title":"Introduction to Sequencing and Scheduling","author":"Baker K.","year":"1974"},{"issue":"7","key":"CIT0006","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/S0278-6125(98)80077-0","volume":"1","author":"Baker A. D.","year":"1998","journal-title":"J. Mfg Systems"},{"key":"CIT0007","first-page":"105","volume-title":"Proceedings of IFIP WG5.7 Working Conference on Managing Concurrent Manufacturing to Improve Industrial Performance","author":"Choi B. K.","year":"1995"},{"key":"CIT0008","first-page":"274","volume":"15","author":"Choi B. K.","year":"2002","journal-title":"IJCIM"},{"key":"CIT0009","first-page":"383","volume":"19","author":"Choi B. K.","year":"2006","journal-title":"IJCIM"},{"key":"CIT0010","volume-title":"KIIE 2005 Fall Conference","author":"Choi B. K.","year":"2005"},{"key":"CIT0011","volume-title":"BPM 2003 Market Milestone Report","author":"Delphi","year":"2003"},{"key":"CIT0012","volume-title":"Parallel and Distributed Simulation Systems","author":"Fujimoto R. M.","year":"2000"},{"key":"CIT0013","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1007\/978-3-642-80317-8_17","volume-title":"Business Process Modeling","author":"Giaglis G. M.","year":"1996"},{"key":"CIT0014","first-page":"113","volume":"31","author":"Hong K. J.","year":"1999","journal-title":"Soc. Comput. Simulation"},{"key":"CIT0015","doi-asserted-by":"publisher","DOI":"10.1016\/S0957-4174(00)00011-7"},{"key":"CIT0016","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1016\/0305-0548(94)E0019-4","volume":"22","author":"Kim Y. D.","year":"1995","journal-title":"Comput. Ops Res."},{"key":"CIT0017","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2003.09.007"},{"key":"CIT0018","doi-asserted-by":"publisher","DOI":"10.1080\/00207549208942943"},{"key":"CIT0019","doi-asserted-by":"publisher","DOI":"10.1016\/j.is.2004.03.003"},{"key":"CIT0020","volume-title":"Proceedings of the International Workshop on Database programming Language","author":"Singh M. P.","year":"1995"},{"key":"CIT0021","doi-asserted-by":"crossref","first-page":"275","DOI":"10.1016\/S0165-0114(00)00105-6","volume":"125","author":"Volkner P.","year":"2002","journal-title":"Fuzzy Sets and Systems"},{"key":"CIT0022","unstructured":"WFMC TC00-1003. 1995. \u201cThe workflow reference model\u201d. Available online at:http:\/\/www.wfmc.org\/"},{"key":"CIT0023","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(96)00035-4"},{"key":"CIT0024","first-page":"1008","volume-title":"Proceedings of the 1994 Winter Simulation Conference","author":"Ying C. C.","year":"1994"},{"key":"CIT0025","volume-title":"Theory of Modeling and Simulation","author":"Zeigler B.","year":"2000"}],"container-title":["International Journal of Computer Integrated Manufacturing"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.tandfonline.com\/doi\/pdf\/10.1080\/09511920601024179","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,5,1]],"date-time":"2019-05-01T10:32:45Z","timestamp":1556706765000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.tandfonline.com\/doi\/full\/10.1080\/09511920601024179"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2007,7,25]]},"references-count":25,"journal-issue":{"issue":"6","published-online":{"date-parts":[[2007,7,25]]},"published-print":{"date-parts":[[2007,9]]}},"alternative-id":["10.1080\/09511920601024179"],"URL":"https:\/\/doi.org\/10.1080\/09511920601024179","relation":{},"ISSN":["0951-192X","1362-3052"],"issn-type":[{"value":"0951-192X","type":"print"},{"value":"1362-3052","type":"electronic"}],"subject":[],"published":{"date-parts":[[2007,7,25]]}}}