{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,10]],"date-time":"2026-03-10T13:40:08Z","timestamp":1773150008595,"version":"3.50.1"},"reference-count":14,"publisher":"Informa UK Limited","issue":"4","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Construction Management and Economics"],"published-print":{"date-parts":[[2005,5]]},"DOI":"10.1080\/01446190500040505","type":"journal-article","created":{"date-parts":[[2005,9,7]],"date-time":"2005-09-07T01:24:11Z","timestamp":1126056251000},"page":"355-364","source":"Crossref","is-referenced-by-count":51,"title":["Using linear model for learning curve effect on highrise floor construction"],"prefix":"10.1080","volume":"23","author":[{"given":"J. P.","family":"Couto","sequence":"first","affiliation":[]},{"given":"J. C.","family":"Teixeira","sequence":"additional","affiliation":[]}],"member":"301","reference":[{"issue":"11","key":"cite1","first-page":"22","volume":"67","author":"Carlson J","year":"1973","journal-title":"Manufacturing Engineering and Management"},{"key":"cite2","volume-title":"M\u00e9todos de planeamento para a constru\u00e7\u00e3o repetitiva em altura em Portugal \u2013 m\u00e9todo das curvas de equil\u00edbrio","author":"Couto JPPM","year":"1998"},{"key":"cite4","unstructured":"Couto JPPM Teixeira JMC 2002M\u00e9todo das Curvas de Equil\u00edbrio no Planeamento da Constru\u00e7\u00e3o Repetitiva em Altura(Curve of Balance Method for Planning High\u2010rise Repetitive Building), Revista Engenharia Civil\/Civil Engineering, Department of Civil Engineering, University of Minho, No.\u200913, January pp. 35\u201346"},{"key":"cite5","unstructured":"Couto JPPM Teixeira JMC 2004Modelos de Aprendizagem na Constru\u00e7\u00e3o(Learning Models in Construction), Revista Engenharia Civil\/Civil Engineering, Department of Civil Engineering, University of Minho, No.\u200919, January, pp. 19\u201329"},{"key":"cite6","first-page":"45","volume-title":"IEEE Spectrum","author":"Cunningham J","year":"1980"},{"key":"cite8","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1994)120:3(603)"},{"key":"cite9","first-page":"pp. 79\u2013101","volume-title":"Journal of the Construction Division, ASCE","author":"Gates M","year":"1972"},{"key":"cite12","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1994)120:4(753)"},{"key":"cite15","volume-title":"Principles of Construction Management","author":"Pilcher R","year":"1992"},{"key":"cite17","first-page":"72","volume-title":"Production Engineering","author":"Tanner J","year":"1985"},{"key":"cite19","volume-title":"Linear Methods for Subcontractor Planning","author":"Teixeira JMC","year":"2002"},{"key":"cite20","volume-title":"Planning Methods for Repetitive Construction","author":"Teixeira JMC","year":"2002"},{"key":"cite21","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1986)112:2(245)"},{"key":"cite22","first-page":"124","volume-title":"Journal of Aeronautical Science","author":"Wright JP","year":"1936"}],"container-title":["Construction Management and Economics"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.tandfonline.com\/doi\/pdf\/10.1080\/01446190500040505","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2016,12,12]],"date-time":"2016-12-12T16:45:16Z","timestamp":1481561116000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.tandfonline.com\/doi\/abs\/10.1080\/01446190500040505"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,5]]},"references-count":14,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2005,5]]}},"alternative-id":["10.1080\/01446190500040505"],"URL":"https:\/\/doi.org\/10.1080\/01446190500040505","relation":{},"ISSN":["0144-6193","1466-433X"],"issn-type":[{"value":"0144-6193","type":"print"},{"value":"1466-433X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2005,5]]}}}