{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T12:28:07Z","timestamp":1740140887708,"version":"3.37.3"},"reference-count":24,"publisher":"IOP Publishing","issue":"1","license":[{"start":{"date-parts":[[2021,3,1]],"date-time":"2021-03-01T00:00:00Z","timestamp":1614556800000},"content-version":"vor","delay-in-days":0,"URL":"http:\/\/creativecommons.org\/licenses\/by\/3.0\/"},{"start":{"date-parts":[[2021,3,1]],"date-time":"2021-03-01T00:00:00Z","timestamp":1614556800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/iopscience.iop.org\/info\/page\/text-and-data-mining"}],"content-domain":{"domain":["iopscience.iop.org"],"crossmark-restriction":false},"short-container-title":["J. Phys.: Conf. Ser."],"published-print":{"date-parts":[[2021,3,1]]},"abstract":"<jats:title>Abstract<\/jats:title>\n               <jats:p>Project is an activity or business that is temporary and has a certain period of time, unique and produces a product, service or both. Achieving project activity right on the schedule was an important thing for project owners or contractors. However, the schedule of the \"X2\" Well Drilling Project has delayed from the original plan due to several inhibiting factors. Therefore, the cost\u2019s project increased during project implementation. The factor analysis method is used to reduce the number of independent variables until new variables are found which are then examined for their relationship and a mathematical model is built using the regression analysis method. The location of this research was one company with 100 valid respondents. The results of this study indicate that there are 3 (three) new factors that have a positive effect and 1 (one) new factors that have a negative effect on the condition of the differences that occur. If a project can be completed before the work period ends, at other times if the owner wants to build a construction project again, there is no doubt that the owner will re-choose Oil Service Company to work on another Drilling Project.<\/jats:p>","DOI":"10.1088\/1742-6596\/1839\/1\/012003","type":"journal-article","created":{"date-parts":[[2021,3,18]],"date-time":"2021-03-18T16:52:07Z","timestamp":1616086327000},"page":"012003","update-policy":"https:\/\/doi.org\/10.1088\/crossmark-policy","source":"Crossref","is-referenced-by-count":0,"title":["Evaluation of \u201cX2\u201d delination well drilling project block on oil service company"],"prefix":"10.1088","volume":"1839","author":[{"given":"W","family":"Sardjono","sequence":"first","affiliation":[]},{"given":"RC","family":"Lahlianti","sequence":"additional","affiliation":[]},{"family":"Hobri","sequence":"additional","affiliation":[]},{"given":"M","family":"Tohir","sequence":"additional","affiliation":[]},{"given":"M","family":"Mukhlis","sequence":"additional","affiliation":[]}],"member":"266","reference":[{"key":"JPCS_1839_1_012003bib1","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1016\/j.ijproman.2015.01.014","article-title":"Front-end definition of projects: Ten paradoxes and some reflections regarding project management and project governance","volume":"34","author":"Samset","year":"2016","journal-title":"International Journal of Project Management"},{"year":"2018","author":"Agrafiotis","key":"JPCS_1839_1_012003bib2"},{"key":"JPCS_1839_1_012003bib3","article-title":"Identification of Effective Safety Risk Mitigating Factors for Well Control Drilling Operation: An Explanatory Research Approach","volume":"17","author":"Asad","year":"2018","journal-title":"Journal of Engineering, Design & Technology"},{"key":"JPCS_1839_1_012003bib4","doi-asserted-by":"crossref","first-page":"235","DOI":"10.7753\/IJCATR0404.1005","article-title":"Project Scheduling: Survey and Research Potentials","volume":"4","author":"Atef","year":"2015","journal-title":"International Journal of Computer Applications Technology and Research"},{"year":"2018","author":"Burgelman","key":"JPCS_1839_1_012003bib5"},{"edition":"12","year":"2014","author":"Cooper","key":"JPCS_1839_1_012003bib6"},{"year":"2016","author":"El-Reedy","key":"JPCS_1839_1_012003bib7"},{"article-title":"Managing Project Scope Definition to Improve Stakeholders\u2019 Participation and Enhance Project Outcome 26th IPMA World Congress","year":"2012","author":"Fageha","key":"JPCS_1839_1_012003bib8"},{"key":"JPCS_1839_1_012003bib9","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1108\/BEPAM-06-2014-0030","article-title":"Identifying Stakeholders\u2019 Involvement That Enhances Project Scope Definition Completeness In Saudi Arabian Public Building Projects","volume":"6","author":"Fageha","year":"2016","journal-title":"Built Environment Project and Asset Management"},{"key":"JPCS_1839_1_012003bib10","doi-asserted-by":"crossref","first-page":"2","DOI":"10.1108\/14714171311322165","article-title":"Is Adaptation Sustainable? : A Method to Estimate Climate-Critical Construction Resource Capacity","volume":"13","author":"Fu","year":"2013","journal-title":"Construction Innovation"},{"year":"2016","author":"Ghozali","key":"JPCS_1839_1_012003bib11"},{"key":"JPCS_1839_1_012003bib12","first-page":"12","article-title":"Estimating Duration of Projects Manual Tasks Using MODAPTS plus Method","author":"Golp\u00eera","year":"2013"},{"key":"JPCS_1839_1_012003bib13","first-page":"11","article-title":"Fundamentals of Project Management","author":"Heagney","year":"2012"},{"key":"JPCS_1839_1_012003bib14","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1108\/ECAM-07-2014-0095","article-title":"Green Building Projects: Schedule Performance, Influential Factors and Solutions","volume":"22","author":"Hwang","year":"2015","journal-title":"Engineering, Construction and Architectural Management"},{"key":"JPCS_1839_1_012003bib15","doi-asserted-by":"crossref","first-page":"388","DOI":"10.1108\/14714170910995930","article-title":"Framework For A Generic Work Breakdown Structure For Building Projects","volume":"9","author":"Ibrahim","year":"2009","journal-title":"Construction Innovation"},{"key":"JPCS_1839_1_012003bib16","doi-asserted-by":"crossref","first-page":"6","DOI":"10.1108\/BPMJ-10-2014-0102","article-title":"Project Cost Control: A New Method To Plan And Control Costs In Large Projects","volume":"22","author":"Jayaraman","year":"2016","journal-title":"Business Process Management Journal"},{"key":"JPCS_1839_1_012003bib17","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1108\/JEDT-07-2018-0119","article-title":"Integrated Cost, Quality, Risk and Schedule Control Through Earned Value Management (EVM)","volume":"17","author":"Khesal","year":"2019","journal-title":"Journal of Engineering, Design and Technology"},{"key":"JPCS_1839_1_012003bib18","first-page":"253","article-title":"Built Environment Project and Asset Management : Developing A Clients\u2019 Charter And Construction Project Kpis To Direct And Drive Industry Improvements","volume":"7","author":"Kumaraswamy","year":"2017"},{"key":"JPCS_1839_1_012003bib19","first-page":"1","article-title":"Improving Project Budget Estimation Accuracy and Precision by Analyzing Reserves for Both Identified and Unidentified Risks","volume":"50","author":"Kwon","year":"2018","journal-title":"Project Management Journal"},{"key":"JPCS_1839_1_012003bib20","doi-asserted-by":"crossref","DOI":"10.1016\/j.eswa.2015.02.057","article-title":"Characterizing Activity Sequences Using Profile Hidden Markov Models","author":"Liu","year":"2015"},{"article-title":"Society of Petroleum Engineers : Automated Reporting Using Rig Sensor Data Enables Superior Drilling Project Management","year":"2009","author":"Mathis","key":"JPCS_1839_1_012003bib21"},{"key":"JPCS_1839_1_012003bib22","first-page":"477","article-title":"Readiness model of Knowledge Management Systems Implementation at the Higher Education","volume":"14","author":"Sardjono","year":"2020","journal-title":"ICIC Express Letters ICIC International"},{"key":"JPCS_1839_1_012003bib23","first-page":"361","article-title":"The Social Welfare factors of Public Transportation Drivers With Online Application As a Result of The 4.0 Industrial Revolution In Transportation","volume":"14","author":"Sardjono","year":"2020","journal-title":"ICIC Express Letters ICIC International"},{"key":"JPCS_1839_1_012003bib24","article-title":"The application of the factor analysis method to determine the performance of IT implementation in companies based on the IT balanced scorecard measurement method","volume":"1538","author":"Sardjono","year":"2019","journal-title":"Journal of Physics: Conference Series"}],"container-title":["Journal of Physics: Conference Series"],"original-title":[],"link":[{"URL":"https:\/\/iopscience.iop.org\/article\/10.1088\/1742-6596\/1839\/1\/012003","content-type":"text\/html","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/iopscience.iop.org\/article\/10.1088\/1742-6596\/1839\/1\/012003\/pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/iopscience.iop.org\/article\/10.1088\/1742-6596\/1839\/1\/012003\/pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"syndication"},{"URL":"https:\/\/iopscience.iop.org\/article\/10.1088\/1742-6596\/1839\/1\/012003\/pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,2,1]],"date-time":"2022-02-01T02:03:08Z","timestamp":1643680988000},"score":1,"resource":{"primary":{"URL":"https:\/\/iopscience.iop.org\/article\/10.1088\/1742-6596\/1839\/1\/012003"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,3,1]]},"references-count":24,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2021,3,1]]}},"URL":"https:\/\/doi.org\/10.1088\/1742-6596\/1839\/1\/012003","relation":{},"ISSN":["1742-6588","1742-6596"],"issn-type":[{"type":"print","value":"1742-6588"},{"type":"electronic","value":"1742-6596"}],"subject":[],"published":{"date-parts":[[2021,3,1]]},"assertion":[{"value":"Evaluation of \u201cX2\u201d delination well drilling project block on oil service company","name":"article_title","label":"Article Title"},{"value":"Journal of Physics: Conference Series","name":"journal_title","label":"Journal Title"},{"value":"paper","name":"article_type","label":"Article Type"},{"value":"Published under licence by IOP Publishing Ltd","name":"copyright_information","label":"Copyright Information"},{"name":"date_received","label":"Date Received","group":{"name":"publication_dates","label":"Publication dates"}},{"name":"date_accepted","label":"Date Accepted","group":{"name":"publication_dates","label":"Publication dates"}},{"name":"date_epub","label":"Online publication date","group":{"name":"publication_dates","label":"Publication dates"}}]}}