{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,12]],"date-time":"2026-05-12T04:39:08Z","timestamp":1778560748144,"version":"3.51.4"},"reference-count":11,"publisher":"Emerald","issue":"3","license":[{"start":{"date-parts":[[2004,4,1]],"date-time":"2004-04-01T00:00:00Z","timestamp":1080777600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2004,4,1]]},"abstract":"<jats:p>Collaborative working in construction projects is becoming very important as many activities are usually performed involving actors based in different geographical locations. Recent years have seen the emergence and development of a plethora of visual software modelling tools, modelling standards, methods for wide enterprise concurrent engineering, and techniques for exchanging and sharing construction information between software applications. This paper describes an integrated product and process information modelling system developed to manage information essential to construction managers. The integrated conceptual model is based on information and functional requirements and was developed to model both product and process information in a hierarchical manner. The also shows how the model relates to practice, and presents the benefits that are gained from structuring information using this approach.<\/jats:p>","DOI":"10.1108\/02635570410525771","type":"journal-article","created":{"date-parts":[[2004,4,6]],"date-time":"2004-04-06T19:43:58Z","timestamp":1081280638000},"page":"218-233","source":"Crossref","is-referenced-by-count":22,"title":["Integrating product and process information in the construction sector"],"prefix":"10.1108","volume":"104","author":[{"given":"D.","family":"Bouchlaghem","sequence":"first","affiliation":[]},{"given":"A.G.","family":"Kimmance","sequence":"additional","affiliation":[]},{"given":"C.J.","family":"Anumba","sequence":"additional","affiliation":[]}],"member":"140","reference":[{"key":"key2022012220435367500_B1","doi-asserted-by":"crossref","unstructured":"Anumba, C.J. and Evbuomwan, N.F.O. (1997), \u201cConcurrent engineering in design\u2010build projects\u201d, Construction Management and Economics, Vol. 15 No. 3, pp. 271\u201081.","DOI":"10.1080\/014461997373006"},{"key":"key2022012220435367500_B2","unstructured":"Anumba, C.J., Cutting\u2010Decelle, A.F., Baldwin, A.N., Dufau, J., Mommessin, M. and Bouchlaghem, D. (1998), \u201cIntegration of product and process models as a keystone of concurrent engineering in construction: the ProMICE project\u201d, Proceedings of ECPPM \u201998: Product and Process Modelling in the Building Industry, pp. 9\u201019."},{"key":"key2022012220435367500_B3","unstructured":"Dubois, A.M.,  Flynn, J., Verhorf, M.H.G. and Augenbroe, F. (1995), \u201cConceptual modelling approaches in the COMBINE project\u201d, Final Combine Workshop Paper, Dublin."},{"key":"key2022012220435367500_B4","unstructured":"IDEF0 (1993), \u201cIntegration definition for function modelling\u201d, Federal Information Processing Standards Publication No. 183."},{"key":"key2022012220435367500_B5","doi-asserted-by":"crossref","unstructured":"Jun, M. and Cai, S. (2003), \u201cKey obstacles to EDI success: from the US small manufacturing companies\u2019 perspective\u201d, Industrial Management and Data Systems, Vol. 103 No. 3, pp. 192\u2010203.","DOI":"10.1108\/02635570310465670"},{"key":"key2022012220435367500_B6","unstructured":"Kimmance, A.G., Anumba, C.J., Bouchlaghem, D. and Baldwin, A.N. (2002), \u201cThe application of an integrated information modelling system for the construction industry\u201d, Proceedings of the 4th European Conference on Process and Product Modelling (ECPPM): e\u2010Work and e\u2010Business in Architecture, Engineering and Construction, Portoroz, Slovenia."},{"key":"key2022012220435367500_B7","doi-asserted-by":"crossref","unstructured":"Kimmance, A.G., Anumba, C.J., Bouchlaghem, D. and Baldwin, A.H. (2003), \u201cThe application of information modelling methodologies: the HIPPY approach to integrated project management\u201d, International Journal of Internet and Enterprise Management, Vol. 1 No. 2.","DOI":"10.1504\/IJCAT.2004.003836"},{"key":"key2022012220435367500_B8","doi-asserted-by":"crossref","unstructured":"Lau, H.C.W., Lee, W.B. and Lau, P.K.H. (2003), \u201cFlexible flow integration: an object technology approach\u201d, Industrial Management & Data Systems, Vol. 103 No. 3, pp. 167\u201076.","DOI":"10.1108\/02635570310465643"},{"key":"key2022012220435367500_B9","doi-asserted-by":"crossref","unstructured":"Nikolopoulos, K., Metaxiotis, K., Lekatis, N. and Assimakopoulos, V. (2003), \u201cIntegrating industrial maintenance strategy into ERP\u201d, Industrial Management & Data Systems, Vol. 103 No. 3, pp. 184\u201091.","DOI":"10.1108\/02635570310465661"},{"key":"key2022012220435367500_B10","unstructured":"Rumbaugh, J., Booch, G. and Jacobson, I. (1999), The Unified Modelling Language Reference Manual, Addison\u2010Wesley, London."},{"key":"key2022012220435367500_B11","doi-asserted-by":"crossref","unstructured":"Sommer, R.A. (2003), \u201cBusiness process flexibility: a driver for outsourcing\u201d, Industrial Management & Data Systems, Vol. 103 No. 3, pp. 177\u201083.","DOI":"10.1108\/02635570310465652"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/02635570410525771\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/02635570410525771\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T23:37:20Z","timestamp":1753400240000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/104\/3\/218-233\/180282"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004,4,1]]},"references-count":11,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2004,4,1]]}},"alternative-id":["10.1108\/02635570410525771"],"URL":"https:\/\/doi.org\/10.1108\/02635570410525771","relation":{},"ISSN":["0263-5577"],"issn-type":[{"value":"0263-5577","type":"print"}],"subject":[],"published":{"date-parts":[[2004,4,1]]}}}