{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T13:08:16Z","timestamp":1762520896895,"version":"3.41.2"},"reference-count":24,"publisher":"Emerald","issue":"4","license":[{"start":{"date-parts":[[2004,5,1]],"date-time":"2004-05-01T00:00:00Z","timestamp":1083369600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2004,5,1]]},"abstract":"<jats:p>A case\u2010based research approach is used to illustrate the power of modelling manufacturing performance measures and to help develop insights into the nature and problems evident when attempting to use simulation across different enterprise sectors. The research methodology used considered three specific companies, each with distinctive characteristics and attributes; a small to medium enterprise, a medium to large enterprise and a large enterprise. From a cross\u2010case analysis of the use of discreet\u2010event (DE) simulation when applied in these instances, the research attempts to develop policy implications that will provide a better understanding of how simulation studies should be approached across different manufacturing enterprises.<\/jats:p>","DOI":"10.1108\/02635570410530720","type":"journal-article","created":{"date-parts":[[2004,6,5]],"date-time":"2004-06-05T01:49:11Z","timestamp":1086400151000},"page":"309-321","source":"Crossref","is-referenced-by-count":10,"title":["Simulating production performance: cross case analysis and policy implications"],"prefix":"10.1108","volume":"104","author":[{"given":"James","family":"O'Kane","sequence":"first","affiliation":[]}],"member":"140","reference":[{"doi-asserted-by":"crossref","unstructured":"Amaratunga, D. and Baldry, D. (2001), \u201cCase study methodology as a means of theory building: performance measurement in facilities management organisations\u201d, Work Study, Vol. 50 No. 3, pp. 95\u2010104.","key":"key2022031419554036400_b1","DOI":"10.1108\/00438020110389227"},{"doi-asserted-by":"crossref","unstructured":"Baldwin, L.P., Eldabi, T., Hlupic, V. and Irani, Z. (2000), \u201cEnhancing simulation software for use in manufacturing\u201d, Logistics Information Management, Vol. 13 No. 2, pp. 263\u201070.","key":"key2022031419554036400_b2","DOI":"10.1108\/09576050010354014"},{"doi-asserted-by":"crossref","unstructured":"Ball, P. (1998), \u201cAbstracting performance in hierarchical manufacturing simulation\u201d, Journal of Materials Processing Technology, Vol. 76, pp. 246\u201051.","key":"key2022031419554036400_b3","DOI":"10.1016\/S0924-0136(97)00355-5"},{"doi-asserted-by":"crossref","unstructured":"Bititci, U.S., Suwignjo, P. and Carrie, A.S. (1999), \u201cStrategy management through quantitative modelling of performance measurement systems\u201d, International Journal of Production Economics, Vol. 69 No. 1, pp. 15\u201022.","key":"key2022031419554036400_b4","DOI":"10.1016\/S0925-5273(99)00113-9"},{"doi-asserted-by":"crossref","unstructured":"Brookes, N.J. and Backhouse, C.J. (1998), \u201cMeasuring the performance of product introduction\u201d, Proceedings of the Institution of Mechanical Engineers, p. B 212 1.","key":"key2022031419554036400_b5","DOI":"10.1243\/0954405981515464"},{"unstructured":"Daniels, R.C. (1995), \u201cPerformance measurement at the sharp end: driving continuous improvement on the shop floor\u201d, Engineering Management Journal, Vol. 30 No. 7, pp. 34\u20109.","key":"key2022031419554036400_b6"},{"doi-asserted-by":"crossref","unstructured":"de Ron, A.J. (1995), \u201cMeasure of manufacturing performance in advanced manufacturing systems\u201d, International Journal of Production Economics, Vol. 41, pp. 147\u201060.","key":"key2022031419554036400_b7","DOI":"10.1016\/0925-5273(95)00071-2"},{"doi-asserted-by":"crossref","unstructured":"Doulgeri, Z. and Kehris, E. (2003), \u201cEffects of workstation loading on the objective of the system's entry policy in FMS\u201d, Integrated Manufacturing Systems, Vol. 14 No. 3, pp. 293\u2010304.","key":"key2022031419554036400_b8","DOI":"10.1108\/09576060310463235"},{"doi-asserted-by":"crossref","unstructured":"Ghalayini, A.M., Noble, J.S. and Crowe, T.J. (1997), \u201cAn integrated dynamic performance measurement system for improving manufacturing competitiveness\u201d, International Journal of Production Economics, Vol. 48, pp. 207\u201025.","key":"key2022031419554036400_b9","DOI":"10.1016\/S0925-5273(96)00093-X"},{"doi-asserted-by":"crossref","unstructured":"Gregory, M.J. (1993), \u201cIntegrated performance measurement: a review of current practice and emerging trend\u201d, International Journal of Production Economics, Vol. 30, pp. 281\u201096.","key":"key2022031419554036400_b10","DOI":"10.1016\/0925-5273(93)90099-7"},{"doi-asserted-by":"crossref","unstructured":"Holst, L. and Bolmsjo, G. (2001), \u201cSimulation integration in manufacturing system development: a study of Japanese industry\u201d, Industrial Management & Data Systems, Vol. 101 No. 7, pp. 339\u201056.","key":"key2022031419554036400_b11","DOI":"10.1108\/EUM0000000005822"},{"unstructured":"Huang, G.Q. and Mak, K.L. (1997), \u201cPerformance measurement in \u2018design for X\u2019\u201d, Proceedings of the CIRP International Symposium on Advanced Design and Manufacture in the Global Manufacturing Era, 21\u201022 August, Hong Kong.","key":"key2022031419554036400_b12"},{"doi-asserted-by":"crossref","unstructured":"Kritchanchai, D. and MacCarthy, B. (2002), \u201cA procedure for establishing a reference state in qualitative simulation of operational systems\u201d, Industrial Management & Data Systems, Vol. 102 No. 6, pp. 332\u201040.","key":"key2022031419554036400_b13","DOI":"10.1108\/02635570210432037"},{"doi-asserted-by":"crossref","unstructured":"Neely, A., Gregory, M. and Platts, K. (1995), \u201cIntegrated performance measurement system design: a literature review and research agenda\u201d, International Journal of Operations & Production Management, Vol. 15 No. 4, pp. 80\u2010116.","key":"key2022031419554036400_b14","DOI":"10.1108\/01443579510083622"},{"unstructured":"Pegden, C.D., Shannon, R.E. and Sadowski, R.P. (1995), Introduction to Simulation Using SIMAN, 2nd ed., McGraw\u2010Hill, New York, NY.","key":"key2022031419554036400_b15"},{"doi-asserted-by":"crossref","unstructured":"Saad, M.S. and Bryne, M.D. (1998), \u201cComprehensive simulation analysis of a flexible hybrid assembly system\u201d, Integrated Manufacturing Systems, Vol. 9 No. 3, pp. 156\u201067.","key":"key2022031419554036400_b16","DOI":"10.1108\/09576069810210394"},{"doi-asserted-by":"crossref","unstructured":"Singh, H., Motwani, J. and Kumar, A. (2000), \u201cA review and analysis of the state\u2010of\u2010the\u2010art research on productivity measurement\u201d, Industrial Management & Data Systems, Vol. 100 No. 5, pp. 234\u201041.","key":"key2022031419554036400_b17","DOI":"10.1108\/02635570010335271"},{"doi-asserted-by":"crossref","unstructured":"Small, M.H. (1999), \u201cAssessing manufacturing performance: an advanced manufacturing technology portfolio perspective\u201d, Industrial Management & Data Systems, Vol. 96 No. 6, pp. 266\u201077.","key":"key2022031419554036400_b18","DOI":"10.1108\/02635579910289202"},{"doi-asserted-by":"crossref","unstructured":"Spedding, T.A. and Chan, K.K. (2001), \u201cSystem level improvement using discrete event simulation\u201d, International Journal of Quality & Reliability Management, Vol. 18 No. 1, pp. 84\u2010103.","key":"key2022031419554036400_b19","DOI":"10.1108\/02656710110365296"},{"doi-asserted-by":"crossref","unstructured":"Tam, A.S.M., Chu, L.K. and Scuilli, D. (2001), \u201cBusiness process modelling in small to medium sized companies\u201d, Industrial Management & Data Systems, Vol. 101 No. 4, pp. 144\u201052.","key":"key2022031419554036400_b20","DOI":"10.1108\/02635570110390107"},{"doi-asserted-by":"crossref","unstructured":"Voss, C., Tsikriktsis, N. and Frohlich, M. (2002), \u201cCase research in operations management\u201d, International Journal of Operations & Production Management, Vol. 22 No. 2, pp. 195\u2010218.","key":"key2022031419554036400_b24","DOI":"10.1108\/01443570210414329"},{"unstructured":"Williams, E.J. and Orlando, D.E. (1998), \u201cSimulation applied to final engine drop assembly\u201d, paper presented at the Winter Simulation Conference, Washington, DC, 13\u201016 December.","key":"key2022031419554036400_b21"},{"unstructured":"WITNESS (2002), Users Manual, The Lanner Group, Redditch.","key":"key2022031419554036400_b22"},{"unstructured":"Yin, R.K. (1994), Case Study Research: Design and Methods, 2nd ed., Sage, London.","key":"key2022031419554036400_b23"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/02635570410530720","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/02635570410530720\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/02635570410530720\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T23:37:21Z","timestamp":1753400241000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/104\/4\/309-321\/180755"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2004,5,1]]},"references-count":24,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2004,5,1]]}},"alternative-id":["10.1108\/02635570410530720"],"URL":"https:\/\/doi.org\/10.1108\/02635570410530720","relation":{},"ISSN":["0263-5577"],"issn-type":[{"type":"print","value":"0263-5577"}],"subject":[],"published":{"date-parts":[[2004,5,1]]}}}