{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T16:46:40Z","timestamp":1770482800329,"version":"3.49.0"},"reference-count":56,"publisher":"Emerald","issue":"2","license":[{"start":{"date-parts":[[2011,3,15]],"date-time":"2011-03-15T00:00:00Z","timestamp":1300147200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,3,15]]},"abstract":"<jats:sec><jats:title content-type=\"abstract-heading\">Purpose<\/jats:title><jats:p>Scheduling needs to be concise and well\u2010determined but able to respond to the ever\u2010changing and uncertain market or environment against the constraints of production capacity, resources, time frame, etc. The purpose of this paper is to model and solve a scheduling problem with another domain perspective that adopts the concept of agent, and an agent\u2010based scheduling environment is proposed for solving the scheduling problem, in which three agents are developed, i.e. a sales agent, a scheduling agent, and a production agent.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title><jats:p>The modeling and development of the proposed agent\u2010based scheduling environment and its agents under constraints are discussed. Constraint priority scheduling concepts are applied to the environment and its agents, and the feature of responding to customer change orders is included in the model. The proposed agent\u2010based scheduling environment with three agents is applied to a lamp\u2010manufacturing company in China as a case study, and the integrated agent\u2010based approach is also illustrated in the case study.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Findings<\/jats:title><jats:p>Throughout the autonomous communication between agents in the proposed model, a constraint\u2010prioritized schedule is generated to fulfill customer orders and customer change orders, as well as to achieve a better scheduling performance result. From the simulation results and analysis in the case study, satisfactory results show that the proposed model can generate a constraint\u2010prioritized schedule for the studied company that can completely fulfill customer orders, adjust and fulfill customer change orders, and achieve a better scheduling result.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title><jats:p>In this paper, the scheduling problem is modeled and solved by using the domain perspective of agent\u2010based approach. By using an agent\u2010based approach, the agents can be implemented to represent manufacturing resources or aggregations of resources. Under the proposed modeling approach, the collaboration across the entire scheduling activities can be enhanced, and the efficiency and effectiveness in the scheduling activities can also be increased.<\/jats:p><\/jats:sec>","DOI":"10.1108\/02635571111115164","type":"journal-article","created":{"date-parts":[[2011,2,26]],"date-time":"2011-02-26T08:53:19Z","timestamp":1298710399000},"page":"246-263","source":"Crossref","is-referenced-by-count":4,"title":["Constraint priority scheduling using an agent\u2010based approach"],"prefix":"10.1108","volume":"111","author":[{"given":"C.Y.","family":"Lam","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"W.H.","family":"Ip","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","reference":[{"key":"key2022031820065090000_b1","doi-asserted-by":"crossref","unstructured":"Amico, D.M. and Truban, M. (1993), \u201cApplying tabu search to the job\u2010shop scheduling problem\u201d, Annals of Operations Research, Vol. 40, pp. 231\u201052.","DOI":"10.1007\/BF02023076"},{"key":"key2022031820065090000_b2","doi-asserted-by":"crossref","unstructured":"Aydin, M.E. and Oztemel, E. (2000), \u201cDynamic job\u2010shop scheduling using reinforcement learning agents\u201d, Robotics and Autonomous Systems, Vol. 33 No. 3, pp. 169\u201078.","DOI":"10.1016\/S0921-8890(00)00087-7"},{"key":"key2022031820065090000_b3","doi-asserted-by":"crossref","unstructured":"Baker, K.R. and Smith, J.C. (2003), \u201cA multiple\u2010criterion model for machine scheduling\u201d, Journal of Scheduling, Vol. 6, pp. 7\u201016.","DOI":"10.1023\/A:1022231419049"},{"key":"key2022031820065090000_b4","doi-asserted-by":"crossref","unstructured":"Beck, J.C., Davenport, A.J., Davis, E.D. and Fox, M. (1998), \u201cThe ODO project: toward a unified basis for constraint\u2010directed scheduling\u201d, Journal of Scheduling, Vol. 1, pp. 89\u2010125.","DOI":"10.1002\/(SICI)1099-1425(199808)1:2<89::AID-JOS9>3.0.CO;2-H"},{"key":"key2022031820065090000_b5","unstructured":"Bigus, J.P. and Bigus, J. (1998), Constructing Intelligent Agents with Java, Wiley, Hoboken, NJ."},{"key":"key2022031820065090000_b6","unstructured":"Brennan, R., Balasubramanian, S. and Norrie, D.H. (1997), \u201cDynamic control architecture for advanced manufacturing systems\u201d, Proceedings of International Conference on Intelligent Systems for Advanced Manufacturing, Pittsburgh, PA, USA, pp. 213\u201023."},{"key":"key2022031820065090000_b7","unstructured":"Bussmann, S. and Schild, K. (2000), \u201cSelf\u2010organizing manufacturing control: an industrial application of agent technology\u201d, Proceedings of the ICMAS, Boston, MA, USA, pp. 87\u201094."},{"key":"key2022031820065090000_b8","doi-asserted-by":"crossref","unstructured":"Cerrada, M., Cardillo, J., Aguilar, J. and Faneite, R. (2007), \u201cAgent\u2010based design for fault management systems in industrial processes\u201d, Computers in Industry, Vol. 58, pp. 313\u201028.","DOI":"10.1016\/j.compind.2006.07.008"},{"key":"key2022031820065090000_b9","unstructured":"Cheng, T.C.E., Ng, C.T. and Yuan, J.J. (2003), \u201cThe single machine batching problem with family setup times to minimize maximum lateness is strongly NP\u2010hard\u201d, Journal of Scheduling, Vol. 6, pp. 483\u201090."},{"key":"key2022031820065090000_b10","doi-asserted-by":"crossref","unstructured":"Cheung, A., Ip, W.H. and Lu, D. (2005), \u201cAn aircraft service scheduling model using genetic algorithms\u201d, Journal of Manufacturing Technology Management, Vol. 16 No. 1, pp. 109\u201019.","DOI":"10.1108\/17410380510574112"},{"key":"key2022031820065090000_b11","doi-asserted-by":"crossref","unstructured":"Cowling, P.I., Ouelhadj, D. and Petrovic, S. (2004), \u201cDynamic scheduling of steel casting and milling using multi\u2010agents\u201d, Production Planning & Control, Vol. 15 No. 2, pp. 178\u201088.","DOI":"10.1080\/09537280410001662466"},{"key":"key2022031820065090000_b12","doi-asserted-by":"crossref","unstructured":"Croce, F., Tadei, R. and Volta, G. (1995), \u201cA genetic algorithm for the job\u2010shop problem\u201d, Computers & Operations Research, Vol. 22, pp. 15\u201024.","DOI":"10.1016\/0305-0548(93)E0015-L"},{"key":"key2022031820065090000_b13","doi-asserted-by":"crossref","unstructured":"Deen, S.M. (2003), Agent\u2010based Manufacturing \u2013 Advances in the Holonic Approach, Springer, Berlin.","DOI":"10.1007\/978-3-662-05624-0"},{"key":"key2022031820065090000_b14","doi-asserted-by":"crossref","unstructured":"Dorndorf, U. and Pesch, E. (1995), \u201cEvolution based learning in a job\u2010shop scheduling environment\u201d, Computations and Operations Research, Vol. 22, pp. 25\u201040.","DOI":"10.1016\/0305-0548(93)E0016-M"},{"key":"key2022031820065090000_b15","unstructured":"Ferber, J. (1999), Multi\u2010agent Systems: An Introduction to Distributed Artificial Intelligence, Addison\u2010Wesley, Harlow."},{"key":"key2022031820065090000_b16","doi-asserted-by":"crossref","unstructured":"Goldberg, D., Cicirello, V. and Dias, M.B. (2003), \u201cTask allocation using a market\u2010based planning mechanism\u201d, Proceedings of AAMAS'03, Melbourne, Australia, Vol. 2, pp. 996\u20107.","DOI":"10.1145\/860575.860763"},{"key":"key2022031820065090000_b17","doi-asserted-by":"crossref","unstructured":"Goncharov, Y. and Sevastyanov, S. (2009), \u201cThe flow shop problem with no\u2010idle constraints: a review and approximation\u201d, European Journal of Operational Research, Vol. 196 No. 2, pp. 450\u20106.","DOI":"10.1016\/j.ejor.2008.03.039"},{"key":"key2022031820065090000_b18","doi-asserted-by":"crossref","unstructured":"Hilletofth, P., L\u00e4ttil\u00e4, L. and Hilmola, O.P. (2009), Agent\u2010based Decision Support in Manufacturing Supply Chain, Lecture Notes in Computer Science, Vol. 5559, pp. 677\u201086.","DOI":"10.1007\/978-3-642-01665-3_68"},{"key":"key2022031820065090000_b19","doi-asserted-by":"crossref","unstructured":"Hoque, M.A. and Kingsman, B.G. (2006), \u201cSynchronization in common cycle lot size scheduling for a multi\u2010product serial supply chain\u201d, International Journal of Production Economics, Vol. 103 No. 1, pp. 316\u201031.","DOI":"10.1016\/j.ijpe.2005.08.007"},{"key":"key2022031820065090000_b20","doi-asserted-by":"crossref","unstructured":"Horling, B. and Lesser, V.R. (2004), \u201cA survey of multi\u2010agent organizational paradigms\u201d, The Knowledge Engineering Review, Vol. 19, pp. 281\u2010316.","DOI":"10.1017\/S0269888905000317"},{"key":"key2022031820065090000_b21","doi-asserted-by":"crossref","unstructured":"Huang, W. and Chung, P.W.H. (2003), \u201cScheduling of pipeless batch plants using constraint satisfaction techniques\u201d, Computers & Chemical Engineering, Vol. 24 No. 2, pp. 377\u201083.","DOI":"10.1016\/S0098-1354(00)00483-X"},{"key":"key2022031820065090000_b22","doi-asserted-by":"crossref","unstructured":"Jagdev, H.S. and Thoben, K.D. (2001), \u201cAnatomy of enterprise collaboration\u201d, Production Planning & Control, Vol. 12 No. 5, pp. 437\u201051.","DOI":"10.1080\/09537280110042675"},{"key":"key2022031820065090000_b23","doi-asserted-by":"crossref","unstructured":"Jennings, N.R. and Wooldridge, M.J. (1998), \u201cApplications of intelligent agents\u201d, Agent Technology: Foundations, Applications, and Markets, Springer, Secaucus, NJ, pp. 3\u201028.","DOI":"10.1007\/978-3-662-03678-5_1"},{"key":"key2022031820065090000_b24","doi-asserted-by":"crossref","unstructured":"Kempenaer, J., Pinte, J., Detand, J. and Kruth, J.P. (1996), \u201cA collaborative process planning and scheduling system\u201d, Advances in Engineering Software, Vol. 25 No. 1, pp. 3\u20108.","DOI":"10.1016\/0965-9978(95)00080-1"},{"key":"key2022031820065090000_b25","unstructured":"Kornienko, S., Kornienko, O. and Levi, P. (2004), \u201cMulti\u2010agent repairer of damaged process plans in manufacturing environment\u201d, Proceedings of IAS\u20108, Amsterdam, The Netherlands."},{"key":"key2022031820065090000_b26","doi-asserted-by":"crossref","unstructured":"Krothapalli, N.K. and Deshmukh, A.V. (1999), \u201cDesign of negotiation protocols for multi\u2010agent manufacturing systems\u201d, International Journal of Production Research, Vol. 37 No. 7, pp. 1601\u201024.","DOI":"10.1080\/002075499191157"},{"key":"key2022031820065090000_b27","doi-asserted-by":"crossref","unstructured":"Laarhoven, V.P., Aarts, E. and Lenstra, J. (1992), \u201cJob shop scheduling by simulated annealing\u201d, Operations Research, Vol. 40 No. 1, pp. 113\u201025.","DOI":"10.1287\/opre.40.1.113"},{"key":"key2022031820065090000_b28","doi-asserted-by":"crossref","unstructured":"Lee, Y. and Chen, C.Y. (2009), \u201cAn optimization heuristic for the berth scheduling problem\u201d, European Journal of Operational Research, Vol. 196 No. 2, pp. 500\u20108.","DOI":"10.1016\/j.ejor.2008.03.021"},{"key":"key2022031820065090000_b29","doi-asserted-by":"crossref","unstructured":"Lee, Y.H., Kumara, S.R.T. and Chatterjee, K. (2003), \u201cMulti\u2010agent\u2010based dynamic resource scheduling for distributed multiple projects using a market mechanism\u201d, Journal of Intelligent Manufacturing, Vol. 14 No. 5, pp. 471\u201084.","DOI":"10.1023\/A:1025753309346"},{"key":"key2022031820065090000_b30","doi-asserted-by":"crossref","unstructured":"Leven, E. and Segertedt, A. (2007), \u201cA scheduling policy for adjusting economic lot quantities to a feasible solution\u201d, European Journal of Operational Research, Vol. 179 No. 3, pp. 709\u201022.","DOI":"10.1016\/j.ejor.2006.03.038"},{"key":"key2022031820065090000_b31","doi-asserted-by":"crossref","unstructured":"Lu, T. and Yih, Y. (2001), \u201cAn agent\u2010based production control framework for multiple\u2010line collaborative manufacturing\u201d, International Journal of Production Research, Vol. 39 No. 10, pp. 2155\u201076.","DOI":"10.1080\/00207540110038478"},{"key":"key2022031820065090000_b32","doi-asserted-by":"crossref","unstructured":"McDonnell, P., Smith, G., Joshi, S. and Kumara, S.R.T. (1999), \u201cA cascading auction protocol as a framework for integrating process planning and heterarchical shop floor control\u201d, IJFMS, Vol. 11 No. 1, pp. 37\u201062.","DOI":"10.1023\/A:1008092606526"},{"key":"key2022031820065090000_b33","unstructured":"Morton, T. and Pentico, D. (1993), Heuristic Scheduling Systems \u2013 With Applications to a Production Systems and Project Management, Wiley, New York, NY."},{"key":"key2022031820065090000_b34","doi-asserted-by":"crossref","unstructured":"Nareyek, A. (2001), Constraint\u2010based Agents, Lecture Notes in Computer Science, 2026, Springer, Berlin.","DOI":"10.1007\/3-540-45746-1"},{"key":"key2022031820065090000_b35","unstructured":"Paredis, J. (1992), \u201cExploiting constraint as background knowledge for genetic algorithms: a case study for scheduling\u201d, Manner and Manderrick, Vol. 285, pp. 281\u201090."},{"key":"key2022031820065090000_b36","doi-asserted-by":"crossref","unstructured":"Park, Y.J., Choi, H.R. and Kim, H.S. (2003), \u201cAutomated negotiation for order transactions of injection mold manufacturer\u201d, Proceedings of ICEC2003, Pittsburgh, PA, USA, Vol. 5, pp. 488\u201097.","DOI":"10.1145\/948005.948068"},{"key":"key2022031820065090000_b37","unstructured":"Parunak, H.V. (1994), Autonomous Agent Architectures: A Non\u2010Technical Introduction, Industrial Technology Institute, Ann Arbor, MI."},{"key":"key2022031820065090000_b38","unstructured":"Pritschow, G., Storr, A. and Weiner, M. (2001), \u201cIntegrated, operator\u2010oriented order and process planning for flexible manufacturing\u201d, Production Engineering VIII, Vol. 1, pp. 103\u20106."},{"key":"key2022031820065090000_b39","doi-asserted-by":"crossref","unstructured":"Shen, W. (2002), \u201cDistributed manufacturing scheduling using intelligent agents\u201d, IEEE Intelligent Systems, Vol. 17 No. 1, pp. 88\u201094.","DOI":"10.1109\/5254.988492"},{"key":"key2022031820065090000_b40","doi-asserted-by":"crossref","unstructured":"Shen, W. and Norrie, D.H. (1999), \u201cAgent\u2010based systems for intelligent manufacturing: a state\u2010of\u2010the\u2010art survey\u201d, Knowledge and Information Systems, Vol. 1 No. 2, pp. 129\u201056.","DOI":"10.1007\/BF03325096"},{"key":"key2022031820065090000_b41","doi-asserted-by":"crossref","unstructured":"Shen, W., Norrie, D.H. and Barthe, J.P. (2001), Multi\u2010agent Systems for Concurrent Intelligent Design and Manufacturing, Taylor & Francis, London, UK.","DOI":"10.4324\/9780203305607"},{"key":"key2022031820065090000_b42","doi-asserted-by":"crossref","unstructured":"Smith, R.G. (1980), \u201cThe contract net protocol: high\u2010level communication and control in a distributed problem solver\u201d, IEEE Transactions on Computers C, Vol. 29 No. 12, pp. 1104\u201013.","DOI":"10.1109\/TC.1980.1675516"},{"key":"key2022031820065090000_b43","doi-asserted-by":"crossref","unstructured":"Surana, A., Kumara, S., Greaves, M. and Raghavan, U.N. (2005), \u201cSupply\u2010chain networks: a complex adaptive systems perspective\u201d, International Journal of Production Research, Vol. 43 No. 2, pp. 4235\u201065.","DOI":"10.1080\/00207540500142274"},{"key":"key2022031820065090000_b44","unstructured":"Swaminathan, J.M., Smith, S.F. and Sadeh, N.M. (1996), \u201cA multi\u2010agent framework for supply chain dynamics\u201d, Proceedings of AI & Manufacturing Research Planning Workshop, Albuquerque, NM, USA."},{"key":"key2022031820065090000_b45","unstructured":"Tonshoff, H., Woelk, P.O., Timm, I. and Herzog, O. (2001), \u201cFlexible process planning and production control using co\u2010operative agent systems\u201d, Proceedings of the COMA 01, Stellenbosch, South Africa, pp. 442\u20109."},{"key":"key2022031820065090000_b46","doi-asserted-by":"crossref","unstructured":"Van Leeuwen, E.H. and Norrie, D.H. (1997), \u201cIntelligent manufacturing: holons and holarchies\u201d, Manufacturing Engineer, Vol. 76 No. 2, pp. 86\u20108.","DOI":"10.1049\/me:19970203"},{"key":"key2022031820065090000_b47","doi-asserted-by":"crossref","unstructured":"Wang, K.F., Lohl, T., Stobbe, M. and Engell, S. (2000), \u201cA genetic algorithm for online\u2010scheduling of a multi\u2010product polymer batch plant\u201d, Computer & Chemical Engineering, Vol. 24 No. 2, pp. 393\u2010400.","DOI":"10.1016\/S0098-1354(00)00427-0"},{"key":"key2022031820065090000_b48","unstructured":"Wang, L., Balasubramanian, S. and Norrie, D.H. (1998), \u201cAgent\u2010based intelligent control system design for real\u2010time distributed manufacturing environments\u201d, Working Notes of the ABM Workshop, Minneapolis, MN, pp. 152\u20109."},{"key":"key2022031820065090000_b49","unstructured":"Weiss, G. (1999), Multi\u2010Agent Systems: A Modern Approach to Distributed Artificial Intelligence, MIT Press, Cambridge, MA."},{"key":"key2022031820065090000_b50","doi-asserted-by":"crossref","unstructured":"Wooldridge, M. (1997), \u201cAgent\u2010based software engineering\u201d, IEEE Proceedings on Software Engineering, Vol. 144, pp. 26\u201037.","DOI":"10.1049\/ip-sen:19971026"},{"key":"key2022031820065090000_b51","doi-asserted-by":"crossref","unstructured":"Xuan, H. and Tang, L. (2007), \u201cScheduling a hybrid flow\u2010shop with batch production at the last stage\u201d, Computers & Operations Research, Vol. 34 No. 9, pp. 2718\u201033.","DOI":"10.1016\/j.cor.2005.10.014"},{"key":"key2022031820065090000_b52","doi-asserted-by":"crossref","unstructured":"Yokoo, M. (2001), Distributed Constraint Satisfaction: Foundation of Co\u2010operation of Multi\u2010agent System, Springer, Berlin.","DOI":"10.1007\/978-3-642-59546-2"},{"key":"key2022031820065090000_b53","doi-asserted-by":"crossref","unstructured":"Yu, R., Iung, B. and Panetto, H. (2003), \u201cA multi\u2010agent\u2010based e\u2010maintenance system with case\u2010based reasoning decision support\u201d, Engineering Applications of Artificial Intelligence, Vol. 16, pp. 321\u201033.","DOI":"10.1016\/S0952-1976(03)00079-4"},{"key":"key2022031820065090000_b54","unstructured":"Yuan, J.J. (1992), \u201cThe NP\u2010hardness of the single machine common due date weighted tardiness problem\u201d, Systems Science and Mathematical Sciences, Vol. 5, pp. 328\u201033."},{"key":"key2022031820065090000_b55","doi-asserted-by":"crossref","unstructured":"Zhang, W.J., Freiheit, T. and Yang, H.S. (2005), \u201cDynamic scheduling in flexible assembly system based on timed petri nets model\u201d, Robotics & Computer\u2010Integrated Manufacturing, Vol. 21 No. 6, pp. 550\u20108.","DOI":"10.1016\/j.rcim.2004.12.002"},{"key":"key2022031820065090000_b56","doi-asserted-by":"crossref","unstructured":"Zhou, Y., Li, B. and Yang, J. (2007), \u201cA biological intelligent scheduling algorithm for scheduling with batch size and non\u2010cutting time consideration\u201d, International Journal of Manufacturing Technology and Management, Vol. 10 No. 2, pp. 247\u201060.","DOI":"10.1504\/IJMTM.2007.011852"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/02635571111115164","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/02635571111115164\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/02635571111115164\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T23:38:29Z","timestamp":1753400309000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/111\/2\/246-263\/186397"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,3,15]]},"references-count":56,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2011,3,15]]}},"alternative-id":["10.1108\/02635571111115164"],"URL":"https:\/\/doi.org\/10.1108\/02635571111115164","relation":{},"ISSN":["0263-5577"],"issn-type":[{"value":"0263-5577","type":"print"}],"subject":[],"published":{"date-parts":[[2011,3,15]]}}}