{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T17:53:20Z","timestamp":1754157200455,"version":"3.41.2"},"reference-count":37,"publisher":"Emerald","issue":"9","license":[{"start":{"date-parts":[[2011,9,27]],"date-time":"2011-09-27T00:00:00Z","timestamp":1317081600000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.emeraldinsight.com\/page\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Industr Mngmnt &amp; Data Systems"],"published-print":{"date-parts":[[2011,9,27]]},"DOI":"10.1108\/02635571111182746","type":"journal-article","created":{"date-parts":[[2011,10,1]],"date-time":"2011-10-01T07:33:41Z","timestamp":1317454421000},"page":"1356-1380","source":"Crossref","is-referenced-by-count":8,"title":["Unpaced production lines with three simultaneous imbalance sources"],"prefix":"10.1108","volume":"111","author":[{"given":"Tom","family":"McNamara","sequence":"first","affiliation":[]},{"given":"Sabry","family":"Shaaban","sequence":"additional","affiliation":[]},{"given":"Sarah","family":"Hudson","sequence":"additional","affiliation":[]}],"member":"140","reference":[{"key":"b1","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2002.1166373"},{"key":"b2","unstructured":"Atwater, B.J. and Chakravorty, S.S. (1994), \u201cDoes protective capacity assist managers in competing along time\u2010based dimensions?\u201d,Production and Inventory Control Management Journal, Vol. 35 No. 3, pp. 53\u20109."},{"key":"b3","doi-asserted-by":"publisher","DOI":"10.1080\/00207547608956389"},{"key":"b4","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2002.1172868"},{"key":"b5","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2003.1261402"},{"key":"b6","doi-asserted-by":"publisher","DOI":"10.1007\/s001700200090"},{"key":"b7","doi-asserted-by":"publisher","DOI":"10.1504\/IJMTM.2003.002538"},{"key":"b8","unstructured":"Chow, W.M. (1987), \u201cBuffer capacity analysis for sequential production lines with variable process times\u201d,International Journal of Production Research, Vol. 25 No. 8, pp. 1183\u201096."},{"key":"b9","doi-asserted-by":"publisher","DOI":"10.1287\/opre.36.2.229"},{"key":"b10","doi-asserted-by":"publisher","DOI":"10.1057\/jors.1977.145"},{"key":"b11","doi-asserted-by":"publisher","DOI":"10.1080\/00207547908919595"},{"key":"b12","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.1993.718023"},{"key":"b14","doi-asserted-by":"crossref","unstructured":"Harris, J.H. and Powell, S.G. (1999), \u201cAn algorithm for optimal buffer placement in reliable serial lines\u201d,IIE Transactions, Vol. 31 No. 4, pp. 287\u2010302.","DOI":"10.1080\/07408179908969834"},{"key":"b15","doi-asserted-by":"publisher","DOI":"10.1287\/ited.2.2.1"},{"key":"b17","doi-asserted-by":"publisher","DOI":"10.1287\/opre.44.3.435"},{"key":"b16","doi-asserted-by":"crossref","unstructured":"Hillier, M.S. (2000), \u201cCharacterizing the optimal allocation of storage space in production line systems with variable processing times\u201d,IIE Transactions, Vol. 32 No. 1, pp. 1\u20108.","DOI":"10.1080\/07408170008963874"},{"key":"b18","doi-asserted-by":"publisher","DOI":"10.1080\/07408179908969802"},{"key":"b19","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(99)00020-1"},{"key":"b21","doi-asserted-by":"publisher","DOI":"10.1080\/00207549408957107"},{"key":"b22","doi-asserted-by":"publisher","DOI":"10.1080\/00207549608904965"},{"key":"b23","doi-asserted-by":"publisher","DOI":"10.1080\/00207548708919831"},{"key":"b24","doi-asserted-by":"publisher","DOI":"10.1080\/00207547208929908"},{"key":"b25","unstructured":"Powell, S.G. (1994), \u201cBuffer allocation in unbalanced three\u2010station serial lines\u201d,International Journal of Production Research, Vol. 32 No. 9, pp. 2201\u201017."},{"key":"b26","doi-asserted-by":"publisher","DOI":"10.1080\/07408179608966249"},{"key":"b27","doi-asserted-by":"publisher","DOI":"10.1080\/07408179808966437"},{"key":"b28","doi-asserted-by":"publisher","DOI":"10.1080\/00207547608956617"},{"key":"b29","doi-asserted-by":"publisher","DOI":"10.1080\/00207540500465535"},{"key":"b30","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2006.323033"},{"key":"b31","doi-asserted-by":"publisher","DOI":"10.1109\/WSC.2005.1574246"},{"key":"b32","doi-asserted-by":"publisher","DOI":"10.1504\/IJMTM.2010.032891"},{"key":"b33","doi-asserted-by":"publisher","DOI":"10.1504\/IJCAT.2009.023618"},{"key":"b34","doi-asserted-by":"publisher","DOI":"10.1504\/IJOR.2009.023288"},{"key":"b35","doi-asserted-by":"publisher","DOI":"10.1504\/IJMTM.2009.024620"},{"key":"b37","doi-asserted-by":"publisher","DOI":"10.1080\/07408179708966314"},{"key":"b38","doi-asserted-by":"publisher","DOI":"10.1080\/00207540210161641"},{"key":"b39","doi-asserted-by":"publisher","DOI":"10.1080\/00207540801939022"},{"key":"b40","doi-asserted-by":"crossref","unstructured":"Yamashita, H. and Altiok, T. (1998), \u201cBuffer capacity allocation for a desired throughput in production lines\u201d,IIE Transactions, Vol. 30, pp. 883\u201091.","DOI":"10.1080\/07408179808966542"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/02635571111182746","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full\/10.1108\/02635571111182746","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T23:38:37Z","timestamp":1753400317000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/111\/9\/1356-1380\/175582"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,9,27]]},"references-count":37,"journal-issue":{"issue":"9","published-print":{"date-parts":[[2011,9,27]]}},"alternative-id":["10.1108\/02635571111182746"],"URL":"https:\/\/doi.org\/10.1108\/02635571111182746","relation":{},"ISSN":["0263-5577"],"issn-type":[{"type":"print","value":"0263-5577"}],"subject":[],"published":{"date-parts":[[2011,9,27]]}}}