{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T17:51:00Z","timestamp":1754157060866,"version":"3.41.2"},"reference-count":36,"publisher":"Emerald","issue":"10","license":[{"start":{"date-parts":[[2012,10,12]],"date-time":"2012-10-12T00:00:00Z","timestamp":1350000000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,10,12]]},"abstract":"<jats:sec><jats:title content-type=\"abstract-heading\">Purpose<\/jats:title><jats:p>The role of a government investment project (GIP) management supervisor is to improve supervision performance and the Chinese government has issued a series of polices, displaying the determination to solve supervision problems. The purpose of this paper is to assist the government to play its role of supervisor and to realize progress supervision performance for GIP in practice with the Agent Construction System (ACS).<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title><jats:p>Taking consideration of the essence of ACS, the paper analyzes the system supported theory, which is a supervision mechanism, with contract management as the core and goals as orientation. The authors design the system frame and its composing modules according to the main function of this information system.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Findings<\/jats:title><jats:p>The research builds an expected supervision information system with four functional modules, which is designed according to logical sequence of supervision, based on a theoretical supervision mechanism.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title><jats:p>The system is, to the best of the authors' knowledge, the most advanced and practical information system for GIP supervision published in the literature.<\/jats:p><\/jats:sec>","DOI":"10.1108\/03684921211276729","type":"journal-article","created":{"date-parts":[[2013,3,25]],"date-time":"2013-03-25T13:48:15Z","timestamp":1364219295000},"page":"1526-1545","source":"Crossref","is-referenced-by-count":1,"title":["Progress supervision information system for GIP with ACS"],"prefix":"10.1108","volume":"41","author":[{"given":"Yunna","family":"Wu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yong","family":"Huang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wei","family":"Luo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","reference":[{"key":"key2021010501090329000_b1","unstructured":"Cantzler, H., Fisher, R.B. and Devy, M. (2002), \u201cImproving architectural 3D reconstruction by plane and edge constraining\u201d, Proceedings of British Machine Vision Association Conference, Cardiff, UK, British Machine Vision Assoc., Manchester, NH, pp. 43\u201052."},{"key":"key2021010501090329000_b15","unstructured":"Chehayeb, N.N. and AbouRizk, S.M. (1995), \u201cApplications of simulation in progress reporting and control\u201d, Proceedings of 1995 Winter Simulation Conference, Arlington, VA, USA, IEEE, New York, NY, pp. 1009\u201016."},{"key":"key2021010501090329000_b2","unstructured":"Chen, D. (2008), \u201cThe development and application of computer vision technology\u201d, Computer Knowledge and Technology, Vol. 35, pp. 2449\u201052."},{"key":"key2021010501090329000_b3","unstructured":"Chen, Z.X., Luo, N.H., Yang, J. and Xiao, J.W. (2003), \u201cResearch for GIS\u2010based construction project schedule management system\u201d, Journal of Wuhan University of Technology, Vol. 25 No. 7, pp. 81\u20103."},{"key":"key2021010501090329000_b4","unstructured":"Cioffi, D.F. (2006), \u201cDesigning project management: a scientific notation and an improved formalism for earned value calculations\u201d, International Journal of Project Management, Vol. 24 No. 2, pp. 136\u201044."},{"key":"key2021010501090329000_b5","unstructured":"Davis, C. (1998), \u201cThe costs and benefits of the earned value management process\u201d, Acquisition Review Quarterly, Fall, pp. 79\u201085."},{"key":"key2021010501090329000_b6","unstructured":"Dick, A.R. and Torr, P.H.S. (2004), \u201cCipolla, modelling and interpretation of architecture from several images\u201d, International Journal of Computer Vision, Vol. 60 No. 2, pp. 111\u201034."},{"key":"key2021010501090329000_b7","unstructured":"Dou, W.Z. and Wu, D.H. (2006), \u201cThe research on development of schedule network diagram of Beijing Olympics preparations projects\u201d, Project Management Technology, Vol. 9, pp. 36\u201040."},{"key":"key2021010501090329000_b8","doi-asserted-by":"crossref","unstructured":"Hallgren, M. and Wilson, L.T. (2008), \u201cThe nature and management of crises in construction projects: projects\u2010as\u2010practice observations\u201d, International Journal of Project Management, Vol. 26 No. 8, pp. 830\u20108.","DOI":"10.1016\/j.ijproman.2007.10.005"},{"key":"key2021010501090329000_b9","unstructured":"Hu, Y.B., Mo, R., Chang, Z.Y., Yang, H.C. and Xiong, D.D. (2008), \u201cResearch on schedule monitoring technology for the complex multilevel project based on WBS\u201d, Modern Manufacturing Engineering, Vol. 2, pp. 16\u201019."},{"key":"key2021010501090329000_b10","unstructured":"Ibrahim, Y., Trucco, E., Kaka, A., Kagioglou, M. and Aouad, G. (2007), \u201cSemi\u2010automatic development of the work breakdown structure for construction projects\u201d, available at: www.baufachinformation.de\/aufsatz.jsp?ul=2010061001175 (accessed 12 December 2011)."},{"key":"key2021010501090329000_b11","unstructured":"Lan, D.J., Li, S.R. and He, W.Z. (2008), \u201cA study on owner's project delivery system and innovation of agent\u2010construction institution\u201d, China Civil Engineering Journal, Vol. 41 No. 7, pp. 82\u20106."},{"key":"key2021010501090329000_b12","unstructured":"Li, Y.P. and Jiang, C.G. (2009), \u201cDiscussion on the building of effective supervision and administration system of construction\u2010agent projects invested by the governments\u201d, Journal of Shenyang Jianzhu University (Social Science), Vol. 11 No. 1, pp. 60\u20102."},{"key":"key2021010501090329000_b13","unstructured":"Liu, W., Wang, Y.Q. and Tian, L. (2001), \u201cManagement information system for cost schedule integration control for nuclear power projects\u201d, Journal of Tsinghua University (Science and Technology), Vol. 41 No. 2, pp. 122\u20105."},{"key":"key2021010501090329000_b14","unstructured":"Ma, G.F. and Tu, M.Z. (2002), \u201cThe application of TOC in project schedule management\u201d, Journal of Industrial Engineering and Engineering Management, Vol. 16 No. 4, pp. 72\u20105."},{"key":"key2021010501090329000_b16","unstructured":"North, S. (2000), \u201cTowards a 3D visualization framework for construction planning with procession\u201d, Proceedings IEEE International Conference on Information Visualization, London, UK, IEEE Comput. Soc., Los Alamitos, CA, pp. 577\u201082."},{"key":"key2021010501090329000_b18","doi-asserted-by":"crossref","unstructured":"Olson, D.L. and Wu, D. (2010a), \u201cA review of enterprise risk management in supply chain\u201d, Kybernetes, Vol. 39 No. 5, pp. 694\u2010706.","DOI":"10.1108\/03684921011043198"},{"key":"key2021010501090329000_b17","doi-asserted-by":"crossref","unstructured":"Olson, D.L. and Wu, D. (2010b), \u201cEarthquakes and risk management in China\u201d, Human and Ecological Risk Assessment, Vol. 16 No. 3, pp. 478\u201093.","DOI":"10.1080\/10807031003779898"},{"key":"key2021010501090329000_b19","doi-asserted-by":"crossref","unstructured":"Pet\u2010Edwards, J. and Mollaghasemi, M. (1996), \u201cA simulation and genetic algorithm approach to stochastic research constrained project scheduling\u201d, Southcon\/96 Conference Record, Orlando, USA, IEEE, New, York, NY, pp. 333\u20108.","DOI":"10.1109\/SOUTHC.1996.535089"},{"key":"key2021010501090329000_b20","unstructured":"Saad, H. (2003), \u201cMonitoring systems and their effectiveness for project cost control in construction\u201d, International Journal of Project Management, Vol. 21 No. 2, pp. 45\u201054."},{"key":"key2021010501090329000_b21","unstructured":"Wang, X.Q., Lv, D. and Shi, Y. (2006), \u201cResearch on supervision system of agent\u2010construction system in public projects\u201d, Construction Economy, Vol. 11, pp. 18\u201020."},{"key":"key2021010501090329000_b22","unstructured":"Wei, D.Q. (2004), \u201cInspection supervision of government investment projects\u201d, China Investment, Vol. 8, pp. 119\u201020."},{"key":"key2021010501090329000_b31","unstructured":"Wu, H. (2002), \u201cThe research on supervision and regulatory system of government investment\u201d, Ph.D. diss., Graduate School of Chinese Academy of Social Sciences, Beijing, 4 December."},{"key":"key2021010501090329000_b23","unstructured":"Wu, C.C., Shi, B.S., Yue, C.Y. and Chen, Y. (2008), \u201cResearch on the progress and cost of project\u201d, Journal of Wuhan University of Technology, Vol. 30 No. 8, pp. 181\u20104."},{"key":"key2021010501090329000_b24","unstructured":"Wu, D. (2010), \u201cBilevel programming data envelopment analysis with constrained resource\u201d, European Journal of Operational Research, Vol. 207 No. 2, pp. 856\u201064."},{"key":"key2021010501090329000_b25","unstructured":"Wu, D. and Olson, D.L. (2008), \u201cSupply chain risk, simulation, and vendor selection\u201d, International Journal of Production Economics, Vol. 114 No. 2, pp. 646\u201055."},{"key":"key2021010501090329000_b27","doi-asserted-by":"crossref","unstructured":"Wu, D. and Olson, D.L. (2009a), \u201cEnterprise risk management: small business scorecard analysis\u201d, Production Planning & Control, Vol. 120 No. 4, pp. 262\u20109.","DOI":"10.1080\/09537280902843706"},{"key":"key2021010501090329000_b26","doi-asserted-by":"crossref","unstructured":"Wu, D. and Olson, D.L. (2009b), \u201cIntroduction to the special issue on \u2018optimizing risk management: methods and tools\u2019\u201d, Human and Ecological Risk Assessment, Vol. 15 No. 2, pp. 220\u20106.","DOI":"10.1080\/10807030902760967"},{"key":"key2021010501090329000_b28","doi-asserted-by":"crossref","unstructured":"Wu, D. and Olson, D.L. (2010a), \u201cEnterprise risk management: a DEA var approach in vendor selection\u201d, International Journal of Production Research, Vol. 48 No. 16, pp. 4919\u201032.","DOI":"10.1080\/00207540903051684"},{"key":"key2021010501090329000_b30","unstructured":"Wu, D., Xie, K., Chen, G. and Gui, P. (2010), \u201cA risk analysis model in concurrent engineering product development\u201d, Risk Analysis, Vol. 30 No. 9, pp. 1440\u201053."},{"key":"key2021010501090329000_b29","doi-asserted-by":"crossref","unstructured":"Wu, D.D. and Olson, D.L. (2010b), \u201cIntroduction to special section on \u2018risk and technology\u2019\u201d, Technology Forecasting and Social Change, Vol. 77 No. 6, pp. 837\u20109.","DOI":"10.1016\/j.techfore.2010.01.014"},{"key":"key2021010501090329000_b32","doi-asserted-by":"crossref","unstructured":"Yan, L., Yang, L.Q. and Zhao, H. (2009), \u201cResearch frame for incentive mechanism of the construction agent in government investment project: from the perspective of project governance\u201d, IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong, China, IEEE, Piscataway, NJ, pp. 1513\u20107.","DOI":"10.1109\/IEEM.2009.5373083"},{"key":"key2021010501090329000_b33","doi-asserted-by":"crossref","unstructured":"Yin, Y. and Yan, M. (2009), \u201cResearch on the institutional innovation of agent construction system for government investment project: a perspective of critical governance factors\u201d, IEEE International Conference on Industrial Engineering and Engineering Management, Hong Kong, China, IEEE, Piscataway, NJ, pp. 1830\u20104.","DOI":"10.1109\/IEEM.2009.5373181"},{"key":"key2021010501090329000_b34","unstructured":"Zhang, J.W., Hu, X.B. and Wang, M.Q. (2008), \u201cThe research on critical chain project planning and scheduling methods\u201d, Science and Technology Management Research, Vol. 3, pp. 280\u20102."},{"key":"key2021010501090329000_b35","unstructured":"Zhang, X., Bakis, N., Lukins, T., Ibrahim, Y., Wu, S., Kagioglou, M., Aouad, G., Kaka, A. and Trucco, E. (2009), \u201cAutomating progress measurement of construction projects\u201d, Automation in Construction, Vol. 18 No. 3, pp. 294\u2010301."},{"key":"key2021010501090329000_b36","unstructured":"Zong, J.Y. (2008), \u201cCountermeasure to strengthen the regulatory of government investment projects\u201d, Supervision in China, Vol. 12, pp. 5\u201036."}],"container-title":["Kybernetes"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/03684921211276729","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/03684921211276729\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/03684921211276729\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T23:27:43Z","timestamp":1753399663000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/k\/article\/41\/10\/1526-1545\/273248"}},"subtitle":[],"editor":[{"given":"Desheng","family":"Dash Wu","sequence":"first","affiliation":[],"role":[{"role":"editor","vocabulary":"crossref"}]}],"short-title":[],"issued":{"date-parts":[[2012,10,12]]},"references-count":36,"journal-issue":{"issue":"10","published-print":{"date-parts":[[2012,10,12]]}},"alternative-id":["10.1108\/03684921211276729"],"URL":"https:\/\/doi.org\/10.1108\/03684921211276729","relation":{},"ISSN":["0368-492X"],"issn-type":[{"type":"print","value":"0368-492X"}],"subject":[],"published":{"date-parts":[[2012,10,12]]}}}