{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,14]],"date-time":"2026-02-14T04:14:50Z","timestamp":1771042490047,"version":"3.50.1"},"reference-count":18,"publisher":"Emerald","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005,2,1]]},"abstract":"<jats:sec>\n                  <jats:title>Purpose<\/jats:title>\n                  <jats:p>To control and reduce the time and the cost of implementation and to achieve optimal adaptation of the processes and structures of the enterprise in an ERP environment.<\/jats:p>\n               <\/jats:sec>\n               <jats:sec>\n                  <jats:title>Design\/methodology\/approach<\/jats:title>\n                  <jats:p>This paper presents a fundamental methodology based on goal directed project management (GDPM) principles which supports the complicated process of implementation and optimal adaptation (IOA) of an ERP system.<\/jats:p>\n               <\/jats:sec>\n               <jats:sec>\n                  <jats:title>Findings<\/jats:title>\n                  <jats:p>By implementing this methodology it was found that it is able to control and reduce the time and the cost of implementation and to achieve optimal adaptation of the processes and structures of the enterprise in an ERP environment.<\/jats:p>\n               <\/jats:sec>\n               <jats:sec>\n                  <jats:title>Research limitations\/implications<\/jats:title>\n                  <jats:p>Based on the above methodology a system must be developed, which will aim at providing the project manager with the ability to create all the necessary elements for the management and realization of the project and to lead the consultant during the IOA process of ERP systems.<\/jats:p>\n               <\/jats:sec>\n               <jats:sec>\n                  <jats:title>Practical implications<\/jats:title>\n                  <jats:p>This methodology was connected to, and tested with the operations and capabilities of an ERP commercial package in one of the leading software houses in Greece. The functional result of this methodology was proved to support considerably the process of IOA of SEn in the companies-customers.<\/jats:p>\n               <\/jats:sec>\n               <jats:sec>\n                  <jats:title>Originality\/value<\/jats:title>\n                  <jats:p>This paper provides a generic research in this technological field concerning small or medium-sized enterprises based on the GDPM principles which aims at the facilitation and effective guidance for the installation process IOA in all stages and in all levels of analysis.<\/jats:p>\n               <\/jats:sec>","DOI":"10.1108\/09685220510582674","type":"journal-article","created":{"date-parts":[[2005,3,21]],"date-time":"2005-03-21T18:44:32Z","timestamp":1111430672000},"page":"55-71","source":"Crossref","is-referenced-by-count":15,"title":["Goal directed project management methodology for the support of ERP implementation and optimal adaptation procedure"],"prefix":"10.1108","volume":"13","author":[{"given":"Kostas","family":"Metaxiotis","sequence":"first","affiliation":[{"name":"Decision Support Systems Laboratory, National Technical University of Athens, Athens, Greece"}]},{"given":"Ioannis","family":"Zafeiropoulos","sequence":"additional","affiliation":[{"name":"Decision Support Systems Laboratory, National Technical University of Athens, Athens, Greece"}]},{"given":"Konstantina","family":"Nikolinakou","sequence":"additional","affiliation":[{"name":"Decision Support Systems Laboratory, National Technical University of Athens, Athens, Greece"}]},{"given":"John","family":"Psarras","sequence":"additional","affiliation":[{"name":"Decision Support Systems Laboratory, National Technical University of Athens, Athens, Greece"}]}],"member":"140","reference":[{"key":"2025072819442763600_b1","unstructured":"Anderson, S.E.\n          , Grude, V.K. and Haug, T. (1999), Goal Directed Project Management: Effective Techniques and Strategies, Kogan Page Professional Paperback Series, Kogan Page, London."},{"key":"2025072819442763600_b2","unstructured":"Baruer, R.\n           and Longman, C. (n.d.), Method Function and Process Modelling."},{"key":"2025072819442763600_b3","unstructured":"Chung, S.H.\n           and Synder, C. (1999), \u201cERP initiation \u2013 a historical perspective\u201d, paper presented at Americas Conference on Information Systems, Milwaukee, WI, 13-15 August."},{"key":"2025072819442763600_b4","unstructured":"Cleland, D.I.\n           (1994), Project Management: Strategic Design and Implementation."},{"key":"2025072819442763600_b5","unstructured":"Davenport, T.H.\n           (2000), Mission Critical: Realizing the Promise of Enterprise Systems, Harvard Business School Press, Boston, MA."},{"key":"2025072819442763600_b6","unstructured":"Grude, K.V.\n           (1997), Goal-Directed Project Management."},{"issue":"2","key":"2025072819442763600_b7","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1108\/09576060110384299","article-title":"Enterprise resource planning: analyzing the impact","volume":"12","author":"Kennerley","year":"2001","journal-title":"Integrated Manufacturing Systems"},{"key":"2025072819442763600_b8","unstructured":"King, D.\n           (1991), Project Management Made Simple: A Guide to Successful Management of Computer Systems Projects (Yourdon Press Computing Series), Yourdon Press, New York, NY."},{"key":"2025072819442763600_b9","unstructured":"Laudon, K.C.\n           and Laudon, J.P. (2000), Management Information Systems: Organization and Technology in the Networked Enterprise, Prentice Hall, Upper Saddle River, NJ."},{"key":"2025072819442763600_b10","doi-asserted-by":"crossref","unstructured":"Laughlin, S.\n           (1999), \u201cAn ERP game plan\u201d, Journal of Business Strategy, pp. 32-5.","DOI":"10.1108\/eb039981"},{"key":"2025072819442763600_b11","unstructured":"Markus, M.L.\n           and Tanis, C. (2000), \u201cThe enterprise systems experience \u2013 from adoption to success\u201d, in Zmud, R.W. (Ed.), Framing the Domains of IT Research: Glimpsing the Future through the Past, Pinnaflex Educational Resources, Cincinnati, OH."},{"key":"2025072819442763600_b12","unstructured":"Meredith, J.\n           and Mantel, S. (1995), Project Management: A Managerial Approach, 3rd ed., Wiley, New York, NY."},{"key":"2025072819442763600_b13","unstructured":"Pawlowski, S.\n           and Boudreau, M-C. (1999), \u201cConstraints and flexibility in enterprise systems: a dialectic of system and job\u201d, paper presented at Americas Conference on Information Systems, Milwaukee, WI, 13-15 August."},{"key":"2025072819442763600_b14","unstructured":"Rosemann, M.\n           (1999), \u201cERP software: characteristics and consequences\u201d, paper presented at 7th European Conference on Information Systems \u2013 ECIS'99, Copenhagen, June."},{"key":"2025072819442763600_b15","unstructured":"Shtub, A.\n           (1999), Enterprise Resource Planning (ERP): The Dynamics of Operations Management."},{"key":"2025072819442763600_b16","doi-asserted-by":"crossref","unstructured":"Soh, C.\n          , Kien, S.S. and Tay-Yap, J. (2000), \u201cCultural fits and misfits: is ERP a universal solution?\u201d, Communications of the ACM, Vol. 43, pp. 47-51.","DOI":"10.1145\/332051.332070"},{"key":"2025072819442763600_b17","unstructured":"Weiss, J.W.\n           and Wysocki, R.K. (1992), 5-Phase Project Management: A Practical Planning and Implementation Guide."},{"key":"2025072819442763600_b18","unstructured":"Welti, N.\n           (1999), Successful SAP\/R3 Implementation: Practical Management of ERP Projects."}],"container-title":["Information Management &amp; Computer Security"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/09685220510582674\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/ics\/article-pdf\/13\/1\/55\/1201626\/09685220510582674.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"syndication"},{"URL":"https:\/\/www.emerald.com\/ics\/article-pdf\/13\/1\/55\/1201626\/09685220510582674.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,28]],"date-time":"2025-07-28T23:44:35Z","timestamp":1753746275000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.emerald.com\/ics\/article\/13\/1\/55\/176737\/Goal-directed-project-management-methodology-for"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,2,1]]},"references-count":18,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2005,2,1]]}},"URL":"https:\/\/doi.org\/10.1108\/09685220510582674","relation":{},"ISSN":["0968-5227","1758-5805"],"issn-type":[{"value":"0968-5227","type":"print"},{"value":"1758-5805","type":"electronic"}],"subject":[],"published":{"date-parts":[[2005,2,1]]}}}