{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,27]],"date-time":"2026-03-27T03:10:41Z","timestamp":1774581041123,"version":"3.50.1"},"reference-count":91,"publisher":"Emerald","issue":"4","license":[{"start":{"date-parts":[[2008,7,4]],"date-time":"2008-07-04T00:00:00Z","timestamp":1215129600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2008,7,4]]},"abstract":"<jats:sec><jats:title content-type=\"abstract-heading\">Purpose<\/jats:title><jats:p>The purpose of this paper is to explore the transfer of lean manufacturing\/production from the Japanese manufacturing industry to the construction sector in the west.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title><jats:p>Research literature from the fields of lean manufacturing\/production and lean construction was reviewed. This revealed a number of characteristics that are specific to lean construction, most notably the recognition that critical research findings have been slow to emerge but appear to be gaining momentum.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Findings<\/jats:title><jats:p>In the transition from manufacturing to construction the process losses appear to be related to critical aspects and the challenges surrounding practical application to a different context. Lean is highly interpretive and there is no shared definition or understanding of what is meant by lean, lean production, and lean construction. The focus has been mainly on production system design, planning and management, and implementation. This narrow focus has meant that some important issues concerning the wider aspects of lean have been overlooked. There is a need for a \u201cback to basics\u201d discussion on many other aspects of the approach, such as whole\u2010life value and waste identification.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Research limitations\/implications<\/jats:title><jats:p>The work is limited to an extensive literature review.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title><jats:p>The extensive literature review makes an original contribution to the lean construction field and provides a valuable resource for researchers.<\/jats:p><\/jats:sec>","DOI":"10.1108\/09699980810886874","type":"journal-article","created":{"date-parts":[[2010,1,22]],"date-time":"2010-01-22T05:30:48Z","timestamp":1264138248000},"page":"383-398","source":"Crossref","is-referenced-by-count":103,"title":["Lost in transition: the transfer of lean manufacturing to construction"],"prefix":"10.1108","volume":"15","author":[{"given":"Bo","family":"J\u00f8rgensen","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Stephen","family":"Emmitt","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","reference":[{"key":"key2022031319541100900_b1","doi-asserted-by":"crossref","unstructured":"Abrahamson, E. (1996), \u201cManagement fashion\u201d, Academy of Management Review, Vol. 21 No. 1, pp. 254\u201085.","DOI":"10.5465\/amr.1996.9602161572"},{"key":"key2022031319541100900_b2","doi-asserted-by":"crossref","unstructured":"Alarc\u00f3n, L. (Ed.) (1997), Lean Construction, A.A. Balkema Publishers, Rotterdam.","DOI":"10.4324\/9780203345825"},{"key":"key2022031319541100900_b3","unstructured":"Alarc\u00f3n, L., Diethelm, S., Rojo, O. and Calderon, R. (2005), \u201cAssessing the impacts of implementing lean construction\u201d, Proceedings of the 13th Annual Conference of the International Group for Lean Construction (IGLC\u201013), Sydney, July, pp. 387\u2010393."},{"key":"key2022031319541100900_b4","unstructured":"Alves, T.C.L. and Tommelein, I.D. (2004), \u201cSimulation of buffering and batching practices in the interface detailing\u2010fabrication \u2013 installation of hvac ductwork\u201d, Proceedings of the 12th Annual Conference of The International Group for Lean Construction, Elsinore, Denmark."},{"key":"key2022031319541100900_b5","doi-asserted-by":"crossref","unstructured":"Arbulu, R.J., Tommelein, I.D., Walsh, K.D. and Hershauer, J.C. (2003), \u201cValue stream analysis of a re\u2010engineered construction supply chain\u201d, Building Research & Information, Vol. 31 No. 2, pp. 161\u201071.","DOI":"10.1080\/09613210301993"},{"key":"key2022031319541100900_b6","unstructured":"Ballard, G. (1993), \u201cLean construction and EPC performance improvement\u201d, 1st International Workshop on Lean Construction, Espoo, Finland (reprinted in Alarc\u00f3n, L., 1997, pp. 79\u201091)."},{"key":"key2022031319541100900_b7","unstructured":"Ballard, G. (2000), \u201cThe last planner system of production control\u201d, PhD thesis, University of Birmingham, Birmingham."},{"key":"key2022031319541100900_b8","doi-asserted-by":"crossref","unstructured":"Ballard, G. (2002), \u201cManaging work flow on design projects: a case study\u201d, Engineering, Construction and Architectural Management, Vol. 9 No. 3, pp. 284\u201091.","DOI":"10.1108\/eb021223"},{"key":"key2022031319541100900_b9","unstructured":"Ballard, G. (2005), \u201cConstruction: one type of project\u2010based production system\u201d, Proceedings SCRI Forum Event Lean Construction: The Next Generation, January 19th, SCRI, University of Salford."},{"key":"key2022031319541100900_b11","doi-asserted-by":"crossref","unstructured":"Ballard, G. and Howell, G. (1998), \u201cShielding production: essential step in production control\u201d, Journal of Construction Engineering and Management, Vol. 124 No. 1, pp. 11\u201017.","DOI":"10.1061\/(ASCE)0733-9364(1998)124:1(11)"},{"key":"key2022031319541100900_b12","doi-asserted-by":"crossref","unstructured":"Ballard, G. and Howell, G.A. (2003a), \u201cLean project management\u201d, Building Research and Information, Vol. 31 No. 2, pp. 119\u201033.","DOI":"10.1080\/09613210301997"},{"key":"key2022031319541100900_b13","unstructured":"Ballard, G. and Howell, G.A. (2003b), \u201cAn update on last planner\u201d, in Proceeding For the 11th Annual Conference of the International Group for Lean Construction (IGLC\u201011), Blacksburg, VA, USA, July 2003."},{"key":"key2022031319541100900_b10","doi-asserted-by":"crossref","unstructured":"Ballard, G., Harper, N. and Zabelle, T. (2003), \u201cLearning to see work flow: application of lean production concepts to precast concrete fabrication\u201d, Journal of Engineering, Construction and Architectural Management, Vol. 10 No. 1, pp. 6\u201014.","DOI":"10.1108\/09699980310466505"},{"key":"key2022031319541100900_b14","doi-asserted-by":"crossref","unstructured":"Ballard, G., Koskela, L., Howell, G.A. and Tommelein, I.D. (2005), \u201cDiscussion of \u2018improving labor flow reliability for better productivity as lean construction principle\u2019 by H. Randolph Thomas, Michael J. Horman, R. Edward Minchin Jr and Dong Chen\u201d, Discussion and Closures in the Journal of Construction Engineering and Management, May, pp. 615\u201016.","DOI":"10.1061\/(ASCE)0733-9364(2005)131:5(615)"},{"key":"key2022031319541100900_b15","unstructured":"Ballard, G., Tommelein, I., Koskela, L. and Howell, G. (2002), \u201cLean construction tools and techniques\u201d, in Hellingsworth, B., Best, R. and de Valence, G. (Eds), Design and Construction: Building in Value, Elsevier, pp. 227\u201055."},{"key":"key2022031319541100900_b16","doi-asserted-by":"crossref","unstructured":"Benders, J. (1999), \u201cTricks and trucks: a case study of organization concepts at work\u201d, The International Journal of Human Resource Management, Vol. 10 No. 4, pp. 624\u201037.","DOI":"10.1080\/095851999340305"},{"key":"key2022031319541100900_b17","doi-asserted-by":"crossref","unstructured":"Benders, J. and van Bijsterveld, M. (2000), \u201cLeaning on lean: the reception of a management fashion in Germany\u201d, New Technology, Work and Employment, Vol. 15 No. 1, pp. 50\u201064.","DOI":"10.1111\/1468-005X.00064"},{"key":"key2022031319541100900_b18","unstructured":"Berggren, C. (1992), Alternatives to Lean Production: Work Organization in the Swedish Auto Industry, ILR Press, Ithaca, New York, NY."},{"key":"key2022031319541100900_b19","doi-asserted-by":"crossref","unstructured":"Berggren, C. (1993), \u201cLean production \u2013 the end of history?\u201d, Work, Employment and Society, Vol. 7 No. 2, pp. 163\u201088.","DOI":"10.1177\/095001709372001"},{"key":"key2022031319541100900_b20","unstructured":"Boyer, R. and Freyssenet, M. (2002), The Productive Models: The Conditions of Profitability, Palgrave Macmillan, New York, NY."},{"key":"key2022031319541100900_b21","doi-asserted-by":"crossref","unstructured":"Briggs, P. (1988), \u201cThe Japanese at work: illusions of the ideal\u201d, Industrial Relations Journal, Vol. 19 No. 1, pp. 24\u201030.","DOI":"10.1111\/j.1468-2338.1988.tb00011.x"},{"key":"key2022031319541100900_b22","unstructured":"CIB (2002), Benchmarking of Labor\u2010Intensive Construction Activities: Lean Construction and Fundamental Principles of Workforce Management, CIB Publication 276 (by Thomas, R., Horman, M., de Souza, U.E.L. and Zavrski, I.), International Council for Research and Innovation in Building and Construction (CIB), Rotterdam."},{"key":"key2022031319541100900_b23","unstructured":"CII (2004), Application of Lean Manufacturing Principles to Construction. A Report to the Construction Industry Institute (CII no. 191), Diekmann, J., Krewedl, M., Balonick, J., Stewart, T. and Won, S. The University of Texas at Austin, TX."},{"key":"key2022031319541100900_b24","doi-asserted-by":"crossref","unstructured":"Choo, H.J., Hammond, J., Tommelein, I.D., Austin, S.A. and Ballard, G. (2004), \u201cDePlan: a tool for integrated design management\u201d, Automation in Construction, Vol. 13, pp. 313\u201026.","DOI":"10.1016\/j.autcon.2003.09.012"},{"key":"key2022031319541100900_b25","doi-asserted-by":"crossref","unstructured":"Cooney, R. (2002), \u201cIs \u2018lean\u2019 a universal production system?: Batch production in the automotive industry\u201d, International Journal of Operations & Production Management, Vol. 22 No. 10, pp. 1130\u201047.","DOI":"10.1108\/01443570210446342"},{"key":"key2022031319541100900_b26","unstructured":"Cooper, R. and Slagmulder, R. (1999), Supply Chain Development for the Lean Enterprise, The Institute of Management Accountants Foundation for Applied Research, Montvale, NJ, Productivity Press, Portland, OR."},{"key":"key2022031319541100900_b27","unstructured":"Cusumano, M.A. (1994), \u201cThe limits of \u2018Lean\u2019\u201d, Sloan Management Review, Summer, pp. 27\u201032."},{"key":"key2022031319541100900_b28","unstructured":"DETR (1998), Rethinking Construction, Department of the Environment, Transportation and the Regions, London."},{"key":"key2022031319541100900_b29","doi-asserted-by":"crossref","unstructured":"Dohse, K., J\u00fcrgens, U. and Malsch, T. (1985), \u201cFrom \u2018Fordism\u2019 to \u2018Toyotism\u2019?\u201d, The Social Organization of the Labor Process in the Japanese Automobile Industry, Politics and Society, Vol. 14 No. 2, pp. 115\u201046.","DOI":"10.1177\/003232928501400201"},{"key":"key2022031319541100900_b30","doi-asserted-by":"crossref","unstructured":"Elfving, J.A., Tommelein, I.D. and Ballard, G. (2005), \u201cConsequences of competitive bidding in project\u2010based production\u201d, Journal of Purchasing & Supply Management, Vol. 11 No. 4, pp. 173\u201081.","DOI":"10.1016\/j.pursup.2005.12.001"},{"key":"key2022031319541100900_b31","doi-asserted-by":"crossref","unstructured":"Fernie, S. and Thorpe, A. (2007), \u201cExploring change in construction: supply chain management\u201d, Engineering, Construction and Architectural Management, Vol. 14 No. 4, pp. 319\u201033.","DOI":"10.1108\/09699980710760649"},{"key":"key2022031319541100900_b32","doi-asserted-by":"crossref","unstructured":"Freire, J. and Alarc\u00f3n, L.F. (2002), \u201cAchieving lean design process: improvement methodology\u201d, Journal of Construction Engineering and Management, Vol. 128 No. 3, pp. 248\u201056.","DOI":"10.1061\/(ASCE)0733-9364(2002)128:3(248)"},{"key":"key2022031319541100900_b33","doi-asserted-by":"crossref","unstructured":"Formoso, C.T., dos Santos, A. and Powell, J.A. (2002a), \u201cAn exploratory study on the applicability of process transparency in construction sites\u201d, Journal of Construction Research, Vol. 3 No. 1, pp. 35\u201054.","DOI":"10.1142\/S1609945102000102"},{"key":"key2022031319541100900_b34","doi-asserted-by":"crossref","unstructured":"Formoso, C.T., Soibelman, L., De Cesare, C. and Isatto, E.L. (2002b), \u201cMaterial waste in building industry: main causes and prevention\u201d, Journal of Construction Engineering and Management, July\/August, pp. 316\u201025.","DOI":"10.1061\/(ASCE)0733-9364(2002)128:4(316)"},{"key":"key2022031319541100900_b35","doi-asserted-by":"crossref","unstructured":"Gil, N., Tommelein, I.D., Stout, A. and Garrett, T. (2005), \u201cEmbodying product and process flexibility to cope with challenging project deliveries\u201d, Journal of Construction Engineering and Management, ASCE, April, pp. 439\u201048.","DOI":"10.1061\/(ASCE)0733-9364(2005)131:4(439)"},{"key":"key2022031319541100900_b36","doi-asserted-by":"crossref","unstructured":"Green, S.D. (1999a), \u201cThe missing arguments of lean construction\u201d, Construction Management and Economics, Vol. 17, pp. 133\u20107.","DOI":"10.1080\/014461999371637"},{"key":"key2022031319541100900_b37","unstructured":"Green, S.D. (1999b), \u201cThe dark side of lean construction: exploitation and ideology\u201d, Proceedings for the 7th Annual Conference of the International Group for Lean Construction (IGLC\u20107), Berkeley, CA."},{"key":"key2022031319541100900_b38","unstructured":"Green, S.D. (2000), \u201cThe future of lean construction \u2013 a brave new world\u201d, Proceedings for the 8th Annual Conference on Lean Construction (IGLC\u20108), Brighton."},{"key":"key2022031319541100900_b39","doi-asserted-by":"crossref","unstructured":"Green, S.D. (2002), \u201cThe human resource management implications of lean construction: critical perspectives and conceptual chasms\u201d, Journal of Construction Research, Vol. 3 No. 1, pp. 147\u201066.","DOI":"10.1142\/S1609945102000114"},{"key":"key2022031319541100900_b40","doi-asserted-by":"crossref","unstructured":"Green, S.D. and May, S.C. (2005), \u201cLean construction: arenas of enactment, models of diffusion and the meaning of \u2018leanness\u2019\u201d, Building Research & Information, Vol. 33 No. 6, pp. 498\u2010511.","DOI":"10.1080\/09613210500285106"},{"key":"key2022031319541100900_b41","doi-asserted-by":"crossref","unstructured":"Hines, P., Holweg, M. and Rich, N. (2004), \u201cLearning to evolve; a review of contemporary lean thinking\u201d, International Journal of Operations & Production Management, Vol. 24 No. 10, pp. 994\u20101011.","DOI":"10.1108\/01443570410558049"},{"key":"key2022031319541100900_b42","unstructured":"Howell, G. and Ballard, G. (1999), \u201cBringing light to the dark side of lean construction: a response to Stuart Green\u201d, Proceedings for the 7th Annual Conference of the International Group for Lean Construction (IGLC\u20107), Berkeley, CA."},{"key":"key2022031319541100900_b43","doi-asserted-by":"crossref","unstructured":"Howell, G.A., Ballard, G., Tommelein, I.D. and Koskela, L. (2004), \u201cDiscussion of \u2018reducing varibility to improve performance as a lean construction principle\u2019, by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski\u201d, Discussion and Closures in the Journal of Construction Engineering and Management,, March\/April, pp. 299\u2010300.","DOI":"10.1061\/(ASCE)0733-9364(2004)130:2(299)"},{"key":"key2022031319541100900_b44","unstructured":"Johansen, E., Porter, G. and Greenwood, D. (2004), \u201cImplementing lean: UK culture and system change, Proceedings for the 12th Annual Conference of the International Group for Lean Construction (IGLC\u201012), Elsinore, August."},{"key":"key2022031319541100900_b45","unstructured":"J\u00f8rgensen, B. (2006), \u201cIntegrating lean design and lean construction: processes and methods\u201d, PhD thesis, Department of Civil Engineering, Technical University of Denmark, Lynyby, p. 286."},{"key":"key2022031319541100900_b46","doi-asserted-by":"crossref","unstructured":"J\u00f8rgensen, B. and Emmitt, S. (2008), \u201cInvestigating the implementation of design and construction from a \u2018lean\u2019 perspective\u201d, Construction Innovation: Information, Process, Management, Vol. 8 No. 2.","DOI":"10.1108\/14714170910950849"},{"key":"key2022031319541100900_b47","doi-asserted-by":"crossref","unstructured":"J\u00fcrgens, U. (1995), \u201cLean production in Japan: myth and reality\u201d, in Littek, W. and Charles, T. (Eds), The New Division of Labour: Emerging Forms of Work Organisation in International Perspective, Walter de Gruyter, New York, NY, pp. 349\u201066.","DOI":"10.1515\/9783110890747.349"},{"key":"key2022031319541100900_b48","doi-asserted-by":"crossref","unstructured":"Katayama, H. and Bennett, D. (1996), \u201cLean production in a changing competitive world: a Japanese perspective\u201d, International Journal of Operations & Production Management, Vol. 16 No. 2, pp. 8\u201023.","DOI":"10.1108\/01443579610109811"},{"key":"key2022031319541100900_b49","unstructured":"Kenley, R. (2004), \u201cProject micromanagement: practical site planning and management of work flow\u201d, Proceedings for the 12th Annual Conference of the International Group for Lean Construction (IGLC\u201012), Elsinore, August."},{"key":"key2022031319541100900_b50","doi-asserted-by":"crossref","unstructured":"Kieser, A. (1997), \u201cRhetoric and myth in management fashion\u201d, Organization, Vol. 4 No. 1, pp. 49\u201074.","DOI":"10.1177\/135050849741004"},{"key":"key2022031319541100900_b51","unstructured":"Koskela, L. (1992), Application of the New Production Philosophy to Construction, CIFE, Stanford University, CA, Tech. Report No. 72."},{"key":"key2022031319541100900_b52","unstructured":"Koskela, L. (1993), \u201cLean production in construction\u201d, 1st International Workshop on Lean Construction, Espoo, Finland (reprinted in Alarc\u00f3n, L., 1997, pp. 1\u20109)."},{"key":"key2022031319541100900_b53","unstructured":"Koskela, L. (2000), An Exploration Towards a Production Theory and its Application to Construction, VTT, Espoo."},{"key":"key2022031319541100900_b54","unstructured":"Koskela, L. (2001), \u201cOn new footnotes to shingo\u201d, Proceedings for the 9th Annual Conference of the International Group for Lean Construction (IGLC\u20109), Singapore."},{"key":"key2022031319541100900_b55","doi-asserted-by":"crossref","unstructured":"Koskela, L. and Ballard, G. (2006), \u201cShould project management be based on theories of economics or production?\u201d, Building Research and Information, Vol. 34 No. 2, pp. 154\u201063.","DOI":"10.1080\/09613210500491480"},{"key":"key2022031319541100900_b56","unstructured":"Koskela, L., Ballard, G. and Howell, G. (2004), \u201cProject management reconceived from a production perspective\u201d, Proceedings, CIB World Congress, Toronto."},{"key":"key2022031319541100900_b57","unstructured":"Koskela, L., Ballard, G. and Tanhuanp\u00e4\u00e4, V.P. (1997), \u201cTowards lean design management\u201d, Proceedings for the 5th Annual Conference of the International Group for Lean Construction (IGLC\u20105), Gold Coast, Australia."},{"key":"key2022031319541100900_b58","unstructured":"Koskela, L., Howell, G., Ballard, G. and Tommelein, I. (2002), \u201cThe foundations of lean construction\u201d, in Hellingsworth, B., Best, R. and de Valence, G. (Eds), Design and Construction: Building in Value, Elsevier, pp. 211\u201026."},{"key":"key2022031319541100900_b59","unstructured":"Koskela, L. and Kagioglou, M. (2005), \u201cOn the metaphysics of production\u201d, Proceedings of the 13th Annual Conference of the International Group for Lean Construction, Sydney, July."},{"key":"key2022031319541100900_b60","doi-asserted-by":"crossref","unstructured":"Lapinski, A.R., Horman, M.J. and Riley, D.R. (2006), \u201cLean processes for sustainable project delivery\u201d, Journal of Construction Engineering and Management, ASCE, October, pp. 1083\u201091.","DOI":"10.1061\/(ASCE)0733-9364(2006)132:10(1083)"},{"key":"key2022031319541100900_b61","doi-asserted-by":"crossref","unstructured":"Lewis, M.A. (2000), \u201cLean production and sustainable competitive advantage\u201d, International Journal of Operations & Production Management, Vol. 20 No. 8, pp. 959\u201078.","DOI":"10.1108\/01443570010332971"},{"key":"key2022031319541100900_b62","doi-asserted-by":"crossref","unstructured":"Lillrank, P. (1995), \u201cThe transfer of management innovations from Japan\u201d, Organization Studies, Vol. 16 No. 6, pp. 971\u201089.","DOI":"10.1177\/017084069501600603"},{"key":"key2022031319541100900_b63","doi-asserted-by":"crossref","unstructured":"Miller, C.J.M., Packham, G.A. and Thomas, B.C. (2002), \u201cHarmonization between main contractors and subcontractors: a prerequisite for lean construction?\u201d, Journal of Construction Research, Vol. 3 No. 1, pp. 67\u201082.","DOI":"10.1142\/S1609945102000059"},{"key":"key2022031319541100900_b64","doi-asserted-by":"crossref","unstructured":"Morris, J. and Wilkinson, B. (1995), \u201cThe transfer of japanese management to alien institutional environments\u201d, Journal of Management Studies, Vol. 32 No. 6, pp. 719\u201030.","DOI":"10.1111\/j.1467-6486.1995.tb00148.x"},{"key":"key2022031319541100900_b65","unstructured":"Ohno, T. (1988), The Toyota Production System: Beyond Large\u2010Scale Production, Productivity Press, Portland, OR."},{"key":"key2022031319541100900_b66","doi-asserted-by":"crossref","unstructured":"Paez, O., Salem, S., Solomon, J. and Genaidy, A. (2005), \u201cMoving from lean manufacturing to lean construction: towards a common sociotechnological framework\u201d, Human Factors and Ergonomics in Manufacturing, Vol. 15 No. 2, pp. 233\u201045.","DOI":"10.1002\/hfm.20023"},{"key":"key2022031319541100900_b67","unstructured":"dos Santos, A. (1999), \u201cApplication of flow principles in the production management of construction sites\u201d, PhD thesis, School of Construction and Property Management, University of Salford, Salford."},{"key":"key2022031319541100900_b68","unstructured":"Shingo, S. (1988), Non\u2010Stock Production: The Shingo System for Continuous Improvement, Productivity Press Inc., Cambridge, MA."},{"key":"key2022031319541100900_b69","unstructured":"Shingo, S. (1989), A Study of the Toyota Production System From an Industrial Engineering Viewpoint (rev. ed.), Productivity Press Inc., Cambridge, MA (1st ed. 1981)."},{"key":"key2022031319541100900_b70","doi-asserted-by":"crossref","unstructured":"Sullivan, J.J. (1992), \u201cJapanese management philosophies: from the vacuous to the brilliant\u201d, California Management Review, Vol. 34 No. 2, pp. 66\u201087.","DOI":"10.2307\/41166694"},{"key":"key2022031319541100900_b71","unstructured":"Tanskanen, K., Wegelius, T. and Nyman, H. (1993), \u201cNew tools for lean construction\u201d, 1st International Workshop on Lean Construction. Espoo, Finlan (reprinted in Alarc\u00f3n, L., 1997, pp. 335\u201041)."},{"key":"key2022031319541100900_b72","doi-asserted-by":"crossref","unstructured":"Thomas, H.R., Horman, M.J., de Souza, U.E.L. and Zavrski, I. (2002), \u201cReducing variability to improve performance as a lean construction principle\u201d, Journal of Construction Engineering and Management, ASCE, March\/April, pp. 144\u201054.","DOI":"10.1061\/(ASCE)0733-9364(2002)128:2(144)"},{"key":"key2022031319541100900_b73","doi-asserted-by":"crossref","unstructured":"Thomas, H.R., Horman, M.J., Minchin, R.E. Jr and Chen, D. (2003), \u201cImproving labor flow reliability for better productivity as lean construction principle\u201d, Journal of Construction Engineering and Management, ASCE, May\/June, pp. 251\u201061.","DOI":"10.1061\/(ASCE)0733-9364(2003)129:3(251)"},{"key":"key2022031319541100900_b74","doi-asserted-by":"crossref","unstructured":"Thomas, H.R., Horman, M.J., de Souza, U.E.L. and Zavrski, I. (2004), Closure to \u201cReducing varibility to improve performance as a lean construction principle\u201d, by H. Thomas, H.R., Horman, M.J., de Souza, U.E.L. and Zavrski, I., Discussion and Closures in the Journal of Construction Engineering and Management, ASCE, March\/April, pp. 300\u2010301.","DOI":"10.1061\/(ASCE)0733-9364(2004)130:2(300)"},{"key":"key2022031319541100900_b75","unstructured":"Thomas, H.R., Horman, M.J., Minchin, R.E. Jr and Chen, D. (2005), \u201cClosure to \u2018Reducing varibility to improve performance as a lean construction principle\u2019 by H. Randolph Thomas, Michael J. Horman, Ubiraci Espinelli Lemes de Souza, and Ivica Zavrski\u201d, Discussion and Closures in the Journal of Construction Engineering and Management, May, pp. 616\u20107."},{"key":"key2022031319541100900_b76","unstructured":"Tommelein, I.D. (1999), \u201cLean construction experiments using discrete\u2010event simulation: techniques and tools for process re\u2010engineering?\u201d, International Journal of Computer\u2010Integrated Design and Construction, CIDAC, Special issue on Construction Process Re\u2010engineering, Vol. 1 No. 2, pp. 53\u201063."},{"key":"key2022031319541100900_b77","doi-asserted-by":"crossref","unstructured":"Tommelein, I.D., Riley, D.R. and Howell, G.A. (1999), \u201cParade game: impact of flow variability on trade performance\u201d, Journal of Construction Engineering and Management, Vol. 125 No. 5, pp. 304\u201010.","DOI":"10.1061\/(ASCE)0733-9364(1999)125:5(304)"},{"key":"key2022031319541100900_b78","unstructured":"Tsao, C. (2005), \u201cUse of work structuring to increase performance of project\u2010based production systems\u201d, PhD thesis, University of California, Berkeley, CA."},{"key":"key2022031319541100900_b79","doi-asserted-by":"crossref","unstructured":"Tsao, C., Tommelein, I., Swanlund, E. and Howell, A. (2004), \u201cWork structuring to achieve integrated product\u2010process design\u201d, Journal of Construction Engineering and Management, Vol. 130 No. 6, pp. 780\u20109.","DOI":"10.1061\/(ASCE)0733-9364(2004)130:6(780)"},{"key":"key2022031319541100900_b80","unstructured":"Tzortzopoulos, P. (2004), \u201cThe design and implementation of product development process models in construction companies\u201d, PhD thesis, University of Salford, Salford."},{"key":"key2022031319541100900_b81","unstructured":"Vrijhoef, R. and Koskela, L. (1999), \u201cRoles of supply chain management in construction\u201d, in Proceedings for the 7th Annual Conference of The International Group for Lean Construction (IGLC\u20107), Berkeley, CA."},{"key":"key2022031319541100900_b82","doi-asserted-by":"crossref","unstructured":"Vrijhoef, R. and Koskela, L. (2000), \u201cThe four roles of supply chain management in construction\u201d, European Journal of Purchasing & Supply Management, Vol. 6 Nos 3\u20104, pp. 169\u201078.","DOI":"10.1016\/S0969-7012(00)00013-7"},{"key":"key2022031319541100900_b83","unstructured":"Vrijhoef, R. and Koskela, L. (2005), \u201cA critical review of construction as a project\u2010based industry: identifying paths towards a project\u2010independent approach to construction\u201d, Proceedings of the CIB Joint Symposium, \u201cCombining Forces \u2013 Advancing Facilities Management and Construction through Innovation\u201d, VTT, Helsinki."},{"key":"key2022031319541100900_b84","unstructured":"Vrijhoef, R., Koskela, L. and Voordijk, H. (2003), \u201cUnderstanding construction supply chains: a multiple theoretical approach to inter\u2010organizational relationships in construction\u201d, Proceedings for the 11th Annual Conference of the International Group for Lean Construction (IGLC\u201011), Blacksburg, Virginia, USA."},{"key":"key2022031319541100900_b85","doi-asserted-by":"crossref","unstructured":"Wilkinson, B., Morris, J. and Munday, M. (1995), \u201cThe iron fist in the velvet glove: management and organization in Japanese manufacturing transplants in Wales\u201d, Journal of Management Studies, Vol. 32 No. 6, pp. 819\u201030.","DOI":"10.1111\/j.1467-6486.1995.tb00154.x"},{"key":"key2022031319541100900_b86","doi-asserted-by":"crossref","unstructured":"Wilkinson, B. and Oliver, N. (1989), \u201cPower, control and the kanban\u201d, Journal of Management Studies, Vol. 26 No. 1, pp. 47\u201058.","DOI":"10.1111\/j.1467-6486.1989.tb00716.x"},{"key":"key2022031319541100900_b87","doi-asserted-by":"crossref","unstructured":"Williams, K., Haslam, C., Johal, S., Williams, J., Adcroft, A. and Willis, R. (1995), \u201cManagement practice or structural factors: the case of America versus Japan in the car industry\u201d, Economic and Industrial Democracy, Vol. 16 No. 1, pp. 9\u201037.","DOI":"10.1177\/0143831X9501600102"},{"key":"key2022031319541100900_b88","unstructured":"Winch, G.M. (2005), \u201cConstruction as production by projects\u201d, in Kazi, S. (Ed.), Learning from Experience: New Challenges, Theories and Practices in Construction, in Proceedings of the CIB Joint Symposium, \u201cCombining Forces \u2013 Advancing Facilities Management and Construction through Innovation\u201d, Vol. 7, VTT, Helsinki, pp. 25\u201041."},{"key":"key2022031319541100900_b89","doi-asserted-by":"crossref","unstructured":"Winch, G.M. (2006), \u201cTowards a theory of construction as production by projects\u201d, Building Research and Information, Vol. 34 No. 2, pp. 164\u201074.","DOI":"10.1080\/09613210500491472"},{"key":"key2022031319541100900_b90","doi-asserted-by":"crossref","unstructured":"Womack, J.P. and Jones, D.T. (1996), Lean Thinking: Banish Waste and Create Wealth in Your Corporation, Simon & Schuster, New York, NY.","DOI":"10.1038\/sj.jors.2600967"},{"key":"key2022031319541100900_b91","unstructured":"Womack, J.P., Jones, D.T. and Roos, D. (1990), The Machine That Changed the World: The Story of Lean Production, Harper Business, New York, NY."}],"container-title":["Engineering, Construction and Architectural Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/09699980810886874","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/09699980810886874\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/09699980810886874\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:11:34Z","timestamp":1753402294000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/ecam\/article\/15\/4\/383-398\/74056"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2008,7,4]]},"references-count":91,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2008,7,4]]}},"alternative-id":["10.1108\/09699980810886874"],"URL":"https:\/\/doi.org\/10.1108\/09699980810886874","relation":{},"ISSN":["0969-9988"],"issn-type":[{"value":"0969-9988","type":"print"}],"subject":[],"published":{"date-parts":[[2008,7,4]]}}}