{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T18:07:15Z","timestamp":1754158035003,"version":"3.41.2"},"reference-count":45,"publisher":"Emerald","issue":"1","license":[{"start":{"date-parts":[[2001,3,1]],"date-time":"2001-03-01T00:00:00Z","timestamp":983404800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2001,3,1]]},"abstract":"<jats:p>This paper describes a conceptual model of the process by which a \u201cfad\u201d makes the important transition to \u201cparadigm\u201d. It is a distinctive contribution to management theory whereby transferable principles are evaluated as a set of business paradigms. The heart of the transformation process is a generic systems model which provides the infrastructure linking the various sources of evidence. This includes horizontal market sector performance surveys; vertical in\u2010depth industrial case studies; influence diagram linking management actions to bottom\u2010line improvements; and consultancy rules of thumb. The approach is illustrated via application to the Total Cycle Time Compression paradigm.<\/jats:p>","DOI":"10.1108\/14637150110383872","type":"journal-article","created":{"date-parts":[[2007,4,13]],"date-time":"2007-04-13T10:01:52Z","timestamp":1176458512000},"page":"8-23","source":"Crossref","is-referenced-by-count":4,"title":["The process of establishing a BPR paradigm"],"prefix":"10.1108","volume":"7","author":[{"given":"Denis R.","family":"Towill","sequence":"first","affiliation":[]}],"member":"140","reference":[{"key":"key2022031520311940600_b1","unstructured":"Ackoff, R.L. (1999), \u201cAckoff\u2019s best: his classic writings on management\u201d, John Wiley & Sons, New York, NY."},{"key":"key2022031520311940600_b2","doi-asserted-by":"crossref","unstructured":"Andraski, J.C. (1994), \u201cFoundations for a successful continuous replenishment programme\u201d, International Journal of Logistics Management, Vol. 5 No. 1, pp. 1\u20108.","DOI":"10.1108\/09574099410805036"},{"key":"key2022031520311940600_b3","unstructured":"Balle\u00b4, M. (1995), \u201cThe business process re\u2010engineering action kit\u201d, Kogan Page, New York, NY."},{"key":"key2022031520311940600_b4","doi-asserted-by":"crossref","unstructured":"Belk, K. and Steels, W. (1998), \u201cCase study ATS BERK from arbitration to agility\u201d, Logistics Information Management, Vol. 2 No. 2, pp. 128\u201033.","DOI":"10.1108\/09576059810210016"},{"key":"key2022031520311940600_b5","doi-asserted-by":"crossref","unstructured":"Berry, D., Naim, M.M. and Towill, D.R. (1985), \u201cBusiness process re\u2010engineering an electronics supply chain\u201d, Proceedings of IEE Science, Measurement and Technology, Vol. 142 No. 5, pp. 395\u2010403.","DOI":"10.1049\/ip-smt:19952179"},{"key":"key2022031520311940600_b6","doi-asserted-by":"crossref","unstructured":"Burbidge, J.L. (1995), \u201cBack to production management\u201d, Manufacturing Engineer, pp. 66\u201071.","DOI":"10.1049\/me:19950208"},{"key":"key2022031520311940600_b7","doi-asserted-by":"crossref","unstructured":"Christopher, M. and Braithwaite, A. (1989), \u201cManaging strategic lead times\u201d, Logistics Information Management, Vol. 2 No. 4, pp. 192\u20107.","DOI":"10.1108\/eb007484"},{"key":"key2022031520311940600_b8","doi-asserted-by":"crossref","unstructured":"Del Vecchio, A. and Towill, D.R. (1990), \u201cConceptual modelling of industrial production distribution systems via standard form\u2019, Mathematics and Computer Modelling, Vol. 14, pp. 1029\u201034.","DOI":"10.1016\/0895-7177(90)90333-I"},{"key":"key2022031520311940600_b9","doi-asserted-by":"crossref","unstructured":"Edgehill, J., Olsmatts, C. and Towill, D.R. (1988), \u201cIndustrial case study on the dynamics and sensitivity of a close\u2010coupled production distribution system\u201d, International Journal of Production Research, Vol. 26 No. 10, pp. 1681\u201093.","DOI":"10.1080\/00207548808947982"},{"key":"key2022031520311940600_b10","doi-asserted-by":"crossref","unstructured":"Evans, G.N., Towill, D.R. and Mason\u2010Jones, R. (1999), \u201cThe SCOPE model of business process re\u2010engineering\u201d, Business Process Management Journal, Vol. 5 No. 2, pp. 121\u201035.","DOI":"10.1108\/14637159910269683"},{"key":"key2022031520311940600_b11","unstructured":"Forrester, J.W. (1961), \u201cIndustrial dynamics\u201d, MIT Press, Cambridge, MA."},{"key":"key2022031520311940600_b12","unstructured":"Goldman, S.L., Nagel, R.N. and Preiss, K. (1995), Agile Competitors and Virtual Organisations, Van Nostrand Reinhold, New York, NY."},{"key":"key2022031520311940600_b13","unstructured":"Gomersall, E.R. (1964), \u201cThe backlog syndrome\u201d, Harvard Business Review, September\u2010October, pp. 105\u201015."},{"key":"key2022031520311940600_b14","doi-asserted-by":"crossref","unstructured":"Green, S.D. (1998), \u201cThe technocratic totalitarianism of construction process improvement: a critical perspective\u201d, Engineering Construction and Architectural Management, Vol. 5 No.4, pp. 376\u201086.","DOI":"10.1108\/eb021090"},{"key":"key2022031520311940600_b15","doi-asserted-by":"crossref","unstructured":"Hastak, M., Vanegas, J.A. and Puyana\u2010Camargo, M. (1993), \u201cTime\u2010based competition: competitive advantage tool for A\/E.C firms\u201d, ASCE Journal of Construction Engineering and Management, Vol. 119 No. 4, pp. 785\u2010800.","DOI":"10.1061\/(ASCE)0733-9364(1993)119:4(785)"},{"key":"key2022031520311940600_b16","unstructured":"Ibbs, C.W. (1994), \u201cRe\u2010engineering construction work processes\u201d, Int. Jnl. Const. Inf. Tech, Vol. 2 No. 4, pp. 27\u201047."},{"key":"key2022031520311940600_b17","doi-asserted-by":"crossref","unstructured":"Ireland, V. (1996), \u201cCase study; T40 radical time production in construction projects\u201d, Business Change and Re\u2010Engineering, Vol. 3 No. 1, pp. 28\u201038.","DOI":"10.1002\/(SICI)1099-0828(199601)3:1<28::AID-BCR48>3.0.CO;2-A"},{"key":"key2022031520311940600_b18","unstructured":"Lewis, J.P. (1998), Mastering Project Management \u2013 Applying Advanced Concepts of Systems Thinking, Control and Evaluation, and Resource Allocation, McGraw\u2010Hill, New York, NY."},{"key":"key2022031520311940600_b19","doi-asserted-by":"crossref","unstructured":"Mason\u2010Jones, R. and Towill, D.R. (1999), \u201cTotal cycle time and the agile supply chain\u201d, International Journal of Production Economics, Vol. 62, May, pp. 61\u201073.","DOI":"10.1016\/S0925-5273(98)00221-7"},{"key":"key2022031520311940600_b20","unstructured":"Micklethwait, J. and Woolridge, A. (1996), The Witch Doctors \u2013 What the Management Gurus are Saying, Why It Matters and How to Make Sense of It, Mandarin Books, London"},{"key":"key2022031520311940600_b21","unstructured":"Morris, D.C. and Brandon, J.S. (1994), Re\u2010engineering your Business, McGraw\u2010Hill, New York, NY."},{"key":"key2022031520311940600_b22","doi-asserted-by":"crossref","unstructured":"Naylor, J.B., Naim, M.M. and Berry, D. (1997), \u201cLeagility: integrating the lean and agile manufacturing paradigm in the total supply chain\u201d, International Journal of Production Economics, Vol. 62, pp. 107\u201018.","DOI":"10.1016\/S0925-5273(98)00223-0"},{"key":"key2022031520311940600_b23","unstructured":"Ohno, T. (1978), Toyota Production System, Diamond Publishing, Tokyo."},{"key":"key2022031520311940600_b24","doi-asserted-by":"crossref","unstructured":"Parnaby, J. (Dec. 1995), \u201cSystems engineering for better engineering\u201d, IEE Engineering Management Journal, Vol. 5 No. 6, December, pp. 256\u201066.","DOI":"10.1049\/em:19950603"},{"key":"key2022031520311940600_b25","doi-asserted-by":"crossref","unstructured":"Prasad, B. (1999), \u201cHybrid re\u2010engineering strategies for process improvement\u201d, Business Process Management Journal. Vol. 5 No. 2, July, pp. 178\u201097.","DOI":"10.1108\/14637159910269728"},{"key":"key2022031520311940600_b26","unstructured":"Richardson, G.P. (1991), Feedback Thought in Social Science and Systems Theory, University of Pennsylvania Press, Philadelphia, PA."},{"key":"key2022031520311940600_b27","unstructured":"Rummler, G.E. and Brache, A.P. (1993), Improving Performance: How to Manage the White Space on the Organisation Chart, 2nd ed., Jossey\u2010Bass Publisher, San Francisco, CA."},{"key":"key2022031520311940600_b28","unstructured":"Schmenner, R.W. (1988), \u201cThe merit of making things fast\u201d, Sloan Management Review, pp.11\u201017."},{"key":"key2022031520311940600_b29","unstructured":"Schonberger, R.J. (1986), World Class Manufacturing: The Lessons of Simplicity Applied, Free Press, New York, NY."},{"key":"key2022031520311940600_b30","unstructured":"Sherwood, D. (1998), Unlock your Mind: A Practical Guide to Deliberate and Systematic Innovation, Gower Press, New York, NY."},{"key":"key2022031520311940600_b31","unstructured":"Stalk, G.H. Jr and Hout, T.M. (1990), Competing against Time: How Time Based Competition Is Re\u2010shaping Global Markets, Free Press, New York, NY."},{"key":"key2022031520311940600_b32","unstructured":"Stern, C.W. and Stalk, G.H. Jr (1998), Perspectives on Strategy, John Wiley & Sons New York, NY."},{"key":"key2022031520311940600_b33","unstructured":"Thomas, P.R. (1990), Competitiveness through Total Cycle Time, McGraw\u2010Hill, New York, NY."},{"key":"key2022031520311940600_b34","doi-asserted-by":"crossref","unstructured":"Towill, D.R. (1982), \u201cDynamic analysis of an inventory and order based production control system\u201d, International Journal of Production Research, Vol. 20, pp. 671\u2010787.","DOI":"10.1080\/00207548208947797"},{"key":"key2022031520311940600_b35","doi-asserted-by":"crossref","unstructured":"Towill, D.R. (1996), \u201cTime compression and supply chain management\u201d, International Journal of Supply Chain Management, Vol. 1 No. 1, pp. 15\u201027.","DOI":"10.1108\/13598549610799040"},{"key":"key2022031520311940600_b36","doi-asserted-by":"crossref","unstructured":"Towill, D.R. (1997a), \u201cFORRIDGE \u2013 Principles of good practice in material flow\u201d, International Journal of Production Planning and Control, Vol. 8 No. 7, pp. 622\u201032.","DOI":"10.1080\/095372897234722"},{"key":"key2022031520311940600_b37","doi-asserted-by":"crossref","unstructured":"Towill, D.R. (1997b), \u201cSuccessful business systems engineering\u201d, IEE Engineering Management Journal, Vol. 7 No. 1, pp. 55\u201064 and No. 2, pp. 89\u201096.","DOI":"10.1049\/em:19970109"},{"key":"key2022031520311940600_b38","doi-asserted-by":"crossref","unstructured":"Towill, D.R. (1999), \u201cManagement theory \u2013 is it of any practical use?\u201d IEE Engineering Management Journal, Vol. 9 No. 3, June, pp. 111\u201021.","DOI":"10.1049\/em:19990307"},{"key":"key2022031520311940600_b39","doi-asserted-by":"crossref","unstructured":"Towill, D.R. and McCullen, P. (1999), \u201cThe impact of an agile manufacturing programme on supply chain dynamics\u201d, International Journal of Logistics Management, Vol. 10 No. 1, pp.83\u201096.","DOI":"10.1108\/09574099910805879"},{"key":"key2022031520311940600_b40","unstructured":"Trout, J. (1999), \u201cThe power of simplicity \u2013 a management guide to cutting through the nonsense and doing things right\u201d, McGraw\u2010Hill, New York, NY."},{"key":"key2022031520311940600_b41","unstructured":"Turnbull, J. (1999), Private communication to present author covering \u201cManagement theory \u2013 is it of any practical use?\u201d, 21 July."},{"key":"key2022031520311940600_b42","unstructured":"Watson, G.H. (1994), Business Systems Engineering, John Wiley & Sons, New York, NY."},{"key":"key2022031520311940600_b43","doi-asserted-by":"crossref","unstructured":"Wikner, J., Towill, D.R. and Naim, M.M. (1991), \u201cSmoothing supply chain dynamics\u201d, International Journal of Production Economics, Vol. 22, pp. 231\u201048.","DOI":"10.1016\/0925-5273(91)90099-F"},{"key":"key2022031520311940600_b44","unstructured":"Womack, J.P. and Jones, D.T. (1996), Lean Thinking, Simon and Shuster New York, NY."},{"key":"key2022031520311940600_b45","unstructured":"Womack, J.P., Jones, D.T. and Roos, D. (1990), The Machine that Changed the World, Rawson Associates, New York, NY."}],"container-title":["Business Process Management Journal"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/14637150110383872","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/14637150110383872\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/14637150110383872\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:35:24Z","timestamp":1753403724000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/bpmj\/article\/7\/1\/8-23\/258471"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,3,1]]},"references-count":45,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2001,3,1]]}},"alternative-id":["10.1108\/14637150110383872"],"URL":"https:\/\/doi.org\/10.1108\/14637150110383872","relation":{},"ISSN":["1463-7154"],"issn-type":[{"type":"print","value":"1463-7154"}],"subject":[],"published":{"date-parts":[[2001,3,1]]}}}