{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,29]],"date-time":"2025-12-29T18:58:40Z","timestamp":1767034720481,"version":"3.41.2"},"reference-count":37,"publisher":"Emerald","issue":"2","license":[{"start":{"date-parts":[[2005,4,1]],"date-time":"2005-04-01T00:00:00Z","timestamp":1112313600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005,4,1]]},"abstract":"<jats:sec><jats:title content-type=\"abstract-heading\">Purpose<\/jats:title><jats:p>This paper aims to describe a structured review framework for managing business performance. The framework entails the review of business performance, including the strategic relevance of the measures, as well as the efficiency and effectiveness of the performance measurement system itself.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title><jats:p>A range of approaches and tools are employed in the framework, which features a review card providing a high\u2010level view of the review process, showing the different types of review perspectives and their interactions.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Findings<\/jats:title><jats:p>The performance measurement system of an organisation is a mechanism to manage and control the organisation. Maintaining the effectiveness of the organisation and the measurement systems requires a systematic review process. The process of reviewing performance is a complex task that spans the whole organisation. A good review process seeks the correct balance between organisational benefits and the effort required.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title><jats:p>Overall, the framework presented provides a structured path of performance review in a methodical and effective manner. This is useful for practitioners to apply and adapt in their situations.<\/jats:p><\/jats:sec>","DOI":"10.1108\/14637150510591129","type":"journal-article","created":{"date-parts":[[2005,4,26]],"date-time":"2005-04-26T02:00:06Z","timestamp":1114480806000},"page":"109-122","source":"Crossref","is-referenced-by-count":64,"title":["A framework to review performance measurement systems"],"prefix":"10.1108","volume":"11","author":[{"given":"Manoochehr","family":"Najmi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"John","family":"Rigas","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ip\u2010Shing","family":"Fan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","reference":[{"key":"key2022012919544968300_b1","doi-asserted-by":"crossref","unstructured":"Andersson, P., Aronsson, H. and Storhagen, N.G. (1989), \u201cMeasuring logistics performance\u201d, Engineering Costs and Production Economics, Vol. 17, pp. 253\u201062.","DOI":"10.1016\/0167-188X(89)90074-8"},{"key":"key2022012919544968300_b2","unstructured":"BAE (1999), Submission for the UK Quality Award, BAE, London."},{"key":"key2022012919544968300_b3","doi-asserted-by":"crossref","unstructured":"Bititci, U.S. and Turner, T. (2000), \u201cDynamics of performance measurement systems\u201d, International Journal of Operations & Production Management, Vol. 20 No. 6, pp. 692\u2010704.","DOI":"10.1108\/01443570010321676"},{"key":"key2022012919544968300_b4","doi-asserted-by":"crossref","unstructured":"Bititci, U.S., Carrie, S.A. and McDevitt, L. (1997), \u201cIntegrated performance measurement systems: a development guide\u201d, International Journal of Operations & Production Management, Vol. 17 No. 5, pp. 522\u201034.","DOI":"10.1108\/01443579710167230"},{"key":"key2022012919544968300_b6","doi-asserted-by":"crossref","unstructured":"Bourne, M., Mills, J., Wilcox, M., Neely, A. and Platts, K. (2000), \u201cDesigning, implementing and updating performance measurement system\u201d, International of Journal of Operations & Production Management, Vol. 20 No. 7, pp. 754\u201071.","DOI":"10.1108\/01443570010330739"},{"key":"key2022012919544968300_b5","unstructured":"Bourne, M.C.S. (1999), \u201cDesigning and implementing a balanced performance measurement system\u201d, Control, July, pp. 21\u20103."},{"key":"key2022012919544968300_b100","unstructured":"CMMI (2002), \u201cCapability Maturity Model Integration\u201d, Software Engineering Institute, Carnegie Mellon University, Pittsburgh, PA, available at: www.sei\/cmu.edu\/cmmi."},{"key":"key2022012919544968300_b7","unstructured":"Dixon, J.R., Nanni, J. and Vollmann, T.E. (1990), The New Performance Challenge: Measuring Operations for World\u2010Class Competition, Irwin, Homewood, IL."},{"key":"key2022012919544968300_b9","unstructured":"Eccles, R.G. (1991), \u201cThe performance measurement manifesto\u201d, Harvard Business Review, January\/February, pp. 131\u20107."},{"key":"key2022012919544968300_b10","unstructured":"European Foundation for Quality Management (2000), Self\u2010Assessment Based on the European Model for Total Quality, European Foundation for Quality Management, Brussels."},{"key":"key2022012919544968300_b11","unstructured":"European Foundation for Quality Management (2003), The EFQM Excellence Model, European Foundation for Quality Management, Brussels."},{"key":"key2022012919544968300_b12","unstructured":"Feigenbaum, A.V. (1983), Total Quality Control, McGraw\u2010Hill, New York, NY."},{"key":"key2022012919544968300_b14","doi-asserted-by":"crossref","unstructured":"Ghalayini, A.M. and Noble, J.S. (1996), \u201cThe changing basis of performance measurement\u201d, International Journal of Operations & Production Management, Vol. 16 No. 8, pp. 63\u201080.","DOI":"10.1108\/01443579610125787"},{"key":"key2022012919544968300_b15","doi-asserted-by":"crossref","unstructured":"ISO (2000), ISO 9000:2000, International Organisation for Standardisation, Geneva.","DOI":"10.1049\/ic:20000156"},{"key":"key2022012919544968300_b16","doi-asserted-by":"crossref","unstructured":"Ishikawa, K. (1991), Introduction to Quality Control, Chapman & Hall, London.","DOI":"10.1007\/978-94-011-7688-0"},{"key":"key2022012919544968300_b17","unstructured":"Johnson, H.T. and Kaplan, R.S. (1987), Relevance Lost: The Rise and Fall of Management Accounting, Harvard Business School Press, Boston, MA."},{"key":"key2022012919544968300_b18","unstructured":"Kaplan, R.S. and Norton, D.P. (1992), \u201cThe balanced scorecard \u2013 measures that drive performance\u201d, Harvard Business Review, January\/February, pp. 71\u20109."},{"key":"key2022012919544968300_b19","doi-asserted-by":"crossref","unstructured":"Kueng, P., Meier, A. and Wettsrein, T. (2001), \u201cPerformance measurement systems must be engineered\u201d, Communications of the AIS, Vol. 7, Article 3.","DOI":"10.17705\/1CAIS.00703"},{"key":"key2022012919544968300_b20","unstructured":"Lingle, J.H. and Schiemann, W.A. (1996), \u201cFrom balanced scorecard to strategic gauges: is measurement worth it?\u201d, Management Review, Vol. 85 No. 3, pp. 56\u201062."},{"key":"key2022012919544968300_b21","unstructured":"Lynch, R.L. and Cross, K.F. (1991), Measure Up \u2013 the Essential Guide to Measuring Business Performance, Mandarin, London."},{"key":"key2022012919544968300_b23","unstructured":"Maskell, B.H. (1991), Performance Measurement for World Class Manufacturing: A Model for American Companies, Productivity Press, Cambridge, MA."},{"key":"key2022012919544968300_b24","doi-asserted-by":"crossref","unstructured":"Medori, D. and Steeple, D. (2000), \u201cA framework for auditing and enhancing performance measurement systems\u201d, International Journal of Operations & Production Management, Vol. 20 No. 5, pp. 520\u201033.","DOI":"10.1108\/01443570010318896"},{"key":"key2022012919544968300_b26","doi-asserted-by":"crossref","unstructured":"Neely, A., Mills, J., Platts, K., Richards, H., Gregory, M., Bourne, M. and Kennerley, M. (2000), \u201cPerformance measurement system design: developing and testing a process\u2010based approach\u201d, International Journal of Operations & Production Management, Vol. 20 No. 10, pp. 1119\u201045.","DOI":"10.1108\/01443570010343708"},{"key":"key2022012919544968300_b27","unstructured":"Neely, A.D., Mills, J.F., Gregory, M.J., Richards, A.H., Platts, K.W. and Bourne, M.C.S. (1996), Getting the Measure of Your Business, Findlay, London."},{"key":"key2022012919544968300_b28","unstructured":"Oakland, J.S. (1986), Statistical Process Control \u2013 a Practical Guide, Heinemann, London."},{"key":"key2022012919544968300_b29","unstructured":"Richardson, P.R. and Gordon, J.R.M. (1980), \u201cMeasuring total manufacturing performance\u201d, Sloan Management Review, Winter, pp. 47\u201058."},{"key":"key2022012919544968300_b32","unstructured":"Skinner, W. (1974), \u201cThe decline, fall and renewal of manufacturing\u201d, Industrial Engineering, October, pp. 32\u20108."},{"key":"key2022012919544968300_b35","unstructured":"Wettstein, T. and Kueng, P.A. (2002), \u201cA maturity model for performance measure systems\u201d, in Brebbia, C. and Pascola, P. (Eds), Management Information Systems, WIT Press, Southampton."},{"key":"key2022012919544968300_b36","unstructured":"Wisner, J.D. and Fawcett, S.E. (1991), \u201cLink firm strategy to operating decisions through performance measurement\u201d, Production and Inventory Management Journal, 3rd quarter, pp. 5\u201011."},{"key":"key2022012919544968300_frg8","unstructured":"Eccles, R.G. and Pyburn, P. (1992), \u201cCreating a comprehensive system to measure performance\u201d, Management Accounting, October, pp. 41\u20104."},{"key":"key2022012919544968300_frg13","doi-asserted-by":"crossref","unstructured":"Fitzgerald, L. (1988), \u201cManaging performance measurement in service industries\u201d, International Journal of Operations & Production Management, Vol. 8 No. 3, pp. 109\u201016.","DOI":"10.1108\/eb054830"},{"key":"key2022012919544968300_frg22","unstructured":"Lynch, R.L. and Cross, K.F. (1992), Measure Up! Yardsticks for Continuous Improvement, Blackwell, Oxford."},{"key":"key2022012919544968300_frg25","doi-asserted-by":"crossref","unstructured":"Moseng, B. and Bredrup, H. (1993), \u201cA methodology for industrial studies of productivity performance\u201d, Production Planning and Control, Vol. 4 No. 3.","DOI":"10.1080\/09537289308919439"},{"key":"key2022012919544968300_frg30","unstructured":"Senge, P.M. (1990), The Fifth Discipline: The Art and Practice of the Learning Organization, Century, London."},{"key":"key2022012919544968300_frg31","unstructured":"Sink, D.S. and Tuttle, T. (1989), Planning and Measurement in Your Organisation of the Future, Industrial Engineering and Management Press, Norcross, GA."},{"key":"key2022012919544968300_frg33","unstructured":"Stoop, P.P.M. (1996), \u201cPerformance management in manufacturing \u2013 a method for short term evaluation and diagnosis\u201d, PhD thesis, Eindhoven University of Technology, Eindhoven."},{"key":"key2022012919544968300_frg34","doi-asserted-by":"crossref","unstructured":"Stoop, P.P.M. and Bertrand, M.W. (1997), \u201cPerformance prediction and diagnosis in two production departments\u201d, Integrated Manufacturing Systems, Vol. 8 No. 2, pp. 103\u20109.","DOI":"10.1108\/09576069710165783"}],"container-title":["Business Process Management Journal"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/14637150510591129","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/14637150510591129\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/14637150510591129\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:35:44Z","timestamp":1753403744000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/bpmj\/article\/11\/2\/109-122\/273068"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005,4,1]]},"references-count":37,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2005,4,1]]}},"alternative-id":["10.1108\/14637150510591129"],"URL":"https:\/\/doi.org\/10.1108\/14637150510591129","relation":{},"ISSN":["1463-7154"],"issn-type":[{"type":"print","value":"1463-7154"}],"subject":[],"published":{"date-parts":[[2005,4,1]]}}}