{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T08:55:19Z","timestamp":1762505719719,"version":"3.41.2"},"reference-count":30,"publisher":"Emerald","issue":"1","license":[{"start":{"date-parts":[[2011,2,8]],"date-time":"2011-02-08T00:00:00Z","timestamp":1297123200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2011,2,8]]},"abstract":"<jats:sec><jats:title content-type=\"abstract-heading\">Purpose<\/jats:title><jats:p>The general purpose of the paper is to improve supply chain (SC) responsiveness and agility by developing advanced planning and scheduling (APS) with collaboration process into agile supply and demand networks (ASDN).<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title><jats:p>Some industrial examples are presented to extract the APS requirements, then business models that are supported by analytical models are developed into APS modules to respond to the requirements. At the end, the modules are attached into an ASDN simulator to measure the benefit of the APS with collaboration process.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Findings<\/jats:title><jats:p>The results show that the APS with collaboration process is superior to existing APS software in terms of promising lead times to customers at minimum inventory level.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Research limitations\/implications<\/jats:title><jats:p>Since the APS with collaboration process cannot optimize transportation planning, SCs cannot therefore optimize networks by finding the optimum network configuration. Currently, the simulator needs to be tested in several possible network scenarios to find the optimal network configuration.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Practical implications<\/jats:title><jats:p>The APS with collaboration process makes it possible to give guaranteed lead times at minimum inventory level. Furthermore, it is possible to combine the APS with collaboration process with enterprise resources planning or MRP II by considering the criticality of the planning.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title><jats:p>The attachment of APS with collaboration process business into ASDN represents the original aspect of this paper.<\/jats:p><\/jats:sec>","DOI":"10.1108\/14637151111105607","type":"journal-article","created":{"date-parts":[[2011,1,29]],"date-time":"2011-01-29T07:06:32Z","timestamp":1296284792000},"page":"107-126","source":"Crossref","is-referenced-by-count":8,"title":["Advanced planning and scheduling with collaboration processes in agile supply and demand networks"],"prefix":"10.1108","volume":"17","author":[{"given":"Yohanes","family":"Kristianto","sequence":"first","affiliation":[]},{"given":"Mian M.","family":"Ajmal","sequence":"additional","affiliation":[]},{"given":"Petri","family":"Helo","sequence":"additional","affiliation":[]}],"member":"140","reference":[{"key":"key2022031320441946000_b3","doi-asserted-by":"crossref","unstructured":"Chen, K. and Ji, P. (2007), \u201cA mixed integer programming model for advanced planning and scheduling\u201d, European Journal of Operations Research, Vol. 184, pp. 512\u201022.","DOI":"10.1016\/j.ejor.2006.06.018"},{"key":"key2022031320441946000_b2","doi-asserted-by":"crossref","unstructured":"Chen, W.L., Huang, C.Y. and Lai, Y.C. (2009), \u201cMulti\u2010tier and multi\u2010site collaborative production: illustrated by a case example of TFT\u2010LCD manufacturing\u201d, Computers in Industry, Vol. 57, pp. 61\u201072.","DOI":"10.1016\/j.cie.2008.08.012"},{"key":"key2022031320441946000_b4","doi-asserted-by":"crossref","unstructured":"Coronado, M., Adrian, E. and Lyons, A.C. (2007), \u201cEvaluating operations flexibility in industrial supply chains to support built\u2010to\u2010order initiatives\u201d, Business Process Management Journal, Vol. 30 No. 4, pp. 572\u201087.","DOI":"10.1108\/14637150710763586"},{"key":"key2022031320441946000_b6","unstructured":"Feitzinger, E. and Lee, H.L. (1997), \u201cMass customization at Hewlett Packard: the power of postponement\u201d, Harvard Business Review, January\u2010February, pp. 116\u201021."},{"key":"key2022031320441946000_b7","doi-asserted-by":"crossref","unstructured":"Fleischmann, B., Meyr, H. and Wagner, M. (2002), \u201cAdvanced planning\u201d, in Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 2nd ed., Springer, Berlin, pp. 71\u201095.","DOI":"10.1007\/978-3-662-10142-1_5"},{"key":"key2022031320441946000_b8","doi-asserted-by":"crossref","unstructured":"Graves, S.C. and Willems, S.P. (2000), \u201cOptimizing strategic safety stock placement in supply chains\u201d, Manufacturing and Service Operations Management, Vol. 2 No. 1, pp. 68\u201083.","DOI":"10.1287\/msom.2.1.68.23267"},{"key":"key2022031320441946000_b30","unstructured":"Gross, D. and Harris, C.M. (1974), Fundamental of Queueing Theory, Willey, New York, NY."},{"key":"key2022031320441946000_b9","unstructured":"Guba, E.G. and Lincoln, Y.S. (1994), \u201cCompeting paradigms in qualitative research\u201d, in Denzin, N.K. and Lincoln, Y.S. (Eds), Handbook of Qualitative Research, Sage, Thousand Oaks, CA, pp. 105\u201017."},{"key":"key2022031320441946000_b10","doi-asserted-by":"crossref","unstructured":"Healy, M. and Perry, C. (2000), \u201cComprehensive criteria to judge validity and reliability of qualitative research within the realism paradigm\u201d, Qualitative Market Research: An International Journal, Vol. 3 No. 3, pp. 118\u201026.","DOI":"10.1108\/13522750010333861"},{"key":"key2022031320441946000_b15","doi-asserted-by":"crossref","unstructured":"Kassmann, D. and Allgor, R. (2006), \u201cSupply chain design, management, and optimization\u201d, paper presented at the 16th European Symposium on Computer Aided Process Engineering and 9th International Symposium on Process Systems Engineering, 10 July.","DOI":"10.1016\/S1570-7946(06)80031-3"},{"key":"key2022031320441946000_b11","doi-asserted-by":"crossref","unstructured":"Kempf, K., Uzsoy, R., Smith, S. and Gary, K. (2000), \u201cEvaluation and comparison of production schedules\u201d, Computers in Industry, Vol. 42, pp. 203\u201020.","DOI":"10.1016\/S0166-3615(99)00071-8"},{"key":"key2022031320441946000_b12","doi-asserted-by":"crossref","unstructured":"Kilger, C. (2002), \u201cThe definition of supply chain project\u201d, in Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 2nd ed., Springer, Berlin, pp. 241\u201059.","DOI":"10.1007\/978-3-662-10142-1_15"},{"key":"key2022031320441946000_b13","doi-asserted-by":"crossref","unstructured":"Kilger, C. and Reuter, B. (2002), \u201cCollaborative planning\u201d, in Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 2nd ed., Springer, Berlin, pp. 223\u201037.","DOI":"10.1007\/978-3-662-10142-1_14"},{"key":"key2022031320441946000_b14","unstructured":"Kilger, C. and Scheeweiss, L. (2002), \u201cDemand fulfillment and ATP\u201d, in Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 2nd ed., Springer, Berlin, pp. 161\u201071."},{"key":"key2022031320441946000_b16","doi-asserted-by":"crossref","unstructured":"Kristianto, Y. and Helo, P. (2009), \u201cStrategic thinking in supply and innovation in dual sourcing procurement\u201d, International Journal of Applied Management Science, Vol. 1 No. 4, pp. 401\u201019.","DOI":"10.1504\/IJAMS.2009.026200"},{"key":"key2022031320441946000_b17","unstructured":"Lee, H.L. (2004), \u201cThe triple a supply chain\u201d, Harvard Business Review, October, pp. 1\u201012."},{"key":"key2022031320441946000_b18","doi-asserted-by":"crossref","unstructured":"Lee, Y.H., Jeong, C.S. and Moon, C. (2002), \u201cAdvanced planning and scheduling with outsourcing in manufacturing supply chain\u201d, Computers in Industry, Vol. 43, pp. 351\u201074.","DOI":"10.1016\/S0360-8352(02)00079-7"},{"key":"key2022031320441946000_b29","doi-asserted-by":"crossref","unstructured":"Lockamy, A. III and McCormack, K. (2004), \u201cLinking SCOR planning practices to supply chain performance: an exploratory study\u201d, International Journal of Operations & Production Management, Vol. 11\/12, pp. 1192\u20102003.","DOI":"10.1108\/01443570410569010"},{"key":"key2022031320441946000_b19","unstructured":"Meyr, H., Rohde, J., Schneeweiss, L. and Wagner, M. (2002), \u201cStructure of advanced planning system\u201d, in Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 2nd ed., Springer, Berlin, pp. 99\u2010104."},{"key":"key2022031320441946000_b20","doi-asserted-by":"crossref","unstructured":"Moon, C., Kim, J.S. and Gen, M. (2004), \u201cAdvanced planning and scheduling based on precedence and resource constraints for e\u2010plants chain\u201d, International Journal of Production Research, Vol. 42 No. 15, pp. 2941\u201055.","DOI":"10.1080\/00207540410001691956"},{"key":"key2022031320441946000_b21","doi-asserted-by":"crossref","unstructured":"Nishioka, N. (2004), \u201cCollaborative agents for production planning and scheduling (CAPPS): a challenge to develop a new software system architecture for manufacturing management in Japan\u201d, International Journal of Production Research, Vol. 42 No. 17, pp. 3355\u201068.","DOI":"10.1080\/00207540410001695989"},{"key":"key2022031320441946000_b22","unstructured":"Rohde, J. (2002), \u201cCoordination and integration\u201d, in Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 2nd ed., Springer, Berlin, pp. 211\u201022."},{"key":"key2022031320441946000_b23","doi-asserted-by":"crossref","unstructured":"Sanchez, R. (2002), \u201cUsing modularity to manage the interactions of the technical and industrial design\u201d, Design management Journal Academic Review, Vol. 2, pp. 8\u201019.","DOI":"10.1111\/j.1948-7177.2002.tb00008.x"},{"key":"key2022031320441946000_b24","doi-asserted-by":"crossref","unstructured":"Stadtler, H. (2002a), \u201cProduction planning and scheduling\u201d, in Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 2nd ed., Springer, Berlin, pp. 177\u201095.","DOI":"10.1007\/978-3-662-10142-1_11"},{"key":"key2022031320441946000_b25","doi-asserted-by":"crossref","unstructured":"Stadtler, H. (2002b), \u201cSupply chain management \u2013 an overview\u201d, in Stadtler, H. and Kilger, C. (Eds), Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies, 2nd ed., Springer, Berlin, pp. 7\u201029.","DOI":"10.1007\/978-3-662-10142-1_2"},{"key":"key2022031320441946000_b26","doi-asserted-by":"crossref","unstructured":"Stadtler, H. (2005), \u201cSupply chain management and advanced planning\u2010basic, overview and challenges\u201d, European Journal of Operations Research, Vol. 163, pp. 575\u201088.","DOI":"10.1016\/j.ejor.2004.03.001"},{"key":"key2022031320441946000_b27","unstructured":"Van Eck, M. (2003), \u201cAdvanced planning and scheduling\u201d, BWI paper, p. iii, available at: http:\/\/obp.math.vu.nl\/logistics\/papers\/vaneck.doc (accessed 2 January 2008)."},{"key":"key2022031320441946000_b28","doi-asserted-by":"crossref","unstructured":"Wiers, V.C.S. (2002), \u201cA case study on the integration of APS and ERP in a steel processing plant\u201d, Production Planning & Control, Vol. 552 \u2013560.","DOI":"10.1080\/09537280210160321"},{"key":"key2022031320441946000_frd1","doi-asserted-by":"crossref","unstructured":"Buxmann, P. and K\u00f6nig, W. (2000), Inter\u2010organisational Co\u2010operation with SAP Systems: Perspectives on Logistics and Service Management, Springer, Berlin.","DOI":"10.1007\/978-3-662-04218-2"},{"key":"key2022031320441946000_frd2","doi-asserted-by":"crossref","unstructured":"Du, X., Jiao, J. and Tseng, M.M. (1999), \u201cIdentifying customer need patterns for customization and personalization\u201d, Integrated Manufacturing System, Vol. 14 No. 5, pp. 387\u201096.","DOI":"10.1108\/09576060310477799"}],"container-title":["Business Process Management Journal"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/14637151111105607","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/14637151111105607\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/14637151111105607\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:36:24Z","timestamp":1753403784000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/bpmj\/article\/17\/1\/107-126\/257030"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2011,2,8]]},"references-count":30,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2011,2,8]]}},"alternative-id":["10.1108\/14637151111105607"],"URL":"https:\/\/doi.org\/10.1108\/14637151111105607","relation":{},"ISSN":["1463-7154"],"issn-type":[{"type":"print","value":"1463-7154"}],"subject":[],"published":{"date-parts":[[2011,2,8]]}}}