{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T18:08:23Z","timestamp":1754158103948,"version":"3.41.2"},"reference-count":12,"publisher":"Emerald","issue":"3","license":[{"start":{"date-parts":[[1997,12,1]],"date-time":"1997-12-01T00:00:00Z","timestamp":880934400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[1997,12,1]]},"abstract":"<jats:p>Based on a project performed at a medium\u2010sized producer of medical utensils, reviews some of the problems which the company experienced in connection with the system built up during ISO 9001 certification, and the re\u2010engineering efforts which were performed in order to relieve these problems. Focuses in particular on a re\u2010structuring of the company\u2019s system for production documentation and its relation to the traceability of their products. This system was radically altered during the project without the traceability requirements being violated or reduced. These changes resulted in a marked increase in productivity.<\/jats:p>","DOI":"10.1108\/14637159710192211","type":"journal-article","created":{"date-parts":[[2002,7,28]],"date-time":"2002-07-28T18:57:17Z","timestamp":1027882637000},"page":"192-204","source":"Crossref","is-referenced-by-count":5,"title":["Re\u2010engineering caused by ISO 9000 certification"],"prefix":"10.1108","volume":"3","author":[{"given":"Lars","family":"Hvam","sequence":"first","affiliation":[]},{"given":"Anders","family":"Paarup Nielsen","sequence":"additional","affiliation":[]},{"given":"Ole\u2010Christian","family":"Bjarn\u00f8","sequence":"additional","affiliation":[]}],"member":"140","reference":[{"key":"key2022020320271780800_b1","doi-asserted-by":"crossref","unstructured":"DFK\u2010Quality news (1995, ISO 9000 Denmark Statistic, No 3 (in Danish).","DOI":"10.1049\/ic:19950539"},{"key":"key2022020320271780800_b2","unstructured":"DS\/EN 46001 (1993, Quality Management Systems, Medical Equipment, Special Demands for Application of EN 29001."},{"key":"key2022020320271780800_b3","unstructured":"Garvin, D.A. (1995, \u201cLeveraging processes for strategic advantage\u201d, Harvard Business Review, September\u2010October, pp. 77\u201090."},{"key":"key2022020320271780800_b4","unstructured":"Hammer, M. (1990, \u201cRe\u2010engineering work \u2010 don\u2019t automate \u2010 obliterate\u201d, Harvard Business Review, July\u2010August, pp. 104\u201012."},{"key":"key2022020320271780800_b5","doi-asserted-by":"crossref","unstructured":"Hammer, M. and Champy, J. (1993, Re\u2010engineering the Corporation \u2010 A manifesto for business revolution, Harper Business, New York, NY.","DOI":"10.1016\/S0007-6813(05)80064-3"},{"key":"key2022020320271780800_b6","unstructured":"Harrington, H.J. (1991, Business Process Improvement \u2010 The breakthrough strategy for Total Quality Productivity and Competitiveness, McGraw\u2010Hill, New York, NY."},{"key":"key2022020320271780800_b7","unstructured":"Hodson, W.K. (1992, Maynard\u2019s Industrial Engineering Handbook, McGraw\u2010Hill, New York, NY."},{"key":"key2022020320271780800_b8","unstructured":"International Labour Office (1957, Introduction to Work Study, Geneva."},{"key":"key2022020320271780800_b9","unstructured":"Oakland, J.S. (1993, Total Quality Management \u2010 The Route to Improving Performance, 2nd rev. ed., Butterworth\u2010Heinemann, Stoneham, MA."},{"key":"key2022020320271780800_b10","unstructured":"Salvendy, G. (1992, Handbook of Industrial Engineering, Wiley, New York, NY."},{"key":"key2022020320271780800_b11","doi-asserted-by":"crossref","unstructured":"Talwar, R. (1993, \u201cBusiness re\u2010engineering a strategy\u2010driven approach\u201d, Long Range Planning, Vol. 26 No. 6, pp. 22\u201040.","DOI":"10.1016\/0024-6301(93)90204-S"},{"key":"key2022020320271780800_b12","doi-asserted-by":"crossref","unstructured":"Zairi, M. and Sinclair, D. (1995, \u201cBusiness process re\u2010engineering: a survey of current practice and future trends in integrated management\u201d, Business Process Re\u2010engineering and Management Journal, Vol. 1 No. 1, pp. 8\u201030.","DOI":"10.1108\/14637159510798248"}],"container-title":["Business Process Management Journal"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/14637159710192211","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/14637159710192211\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/14637159710192211\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:36:44Z","timestamp":1753403804000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/bpmj\/article\/3\/3\/192-204\/257672"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1997,12,1]]},"references-count":12,"journal-issue":{"issue":"3","published-print":{"date-parts":[[1997,12,1]]}},"alternative-id":["10.1108\/14637159710192211"],"URL":"https:\/\/doi.org\/10.1108\/14637159710192211","relation":{},"ISSN":["1463-7154"],"issn-type":[{"type":"print","value":"1463-7154"}],"subject":[],"published":{"date-parts":[[1997,12,1]]}}}