{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T18:08:28Z","timestamp":1754158108607,"version":"3.41.2"},"reference-count":20,"publisher":"Emerald","issue":"4","license":[{"start":{"date-parts":[[1998,12,1]],"date-time":"1998-12-01T00:00:00Z","timestamp":912470400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.emeraldinsight.com\/page\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Business Process Mgmt Journal"],"published-print":{"date-parts":[[1998,12]]},"DOI":"10.1108\/14637159810238192","type":"journal-article","created":{"date-parts":[[2002,7,28]],"date-time":"2002-07-28T18:46:58Z","timestamp":1027882018000},"page":"291-305","source":"Crossref","is-referenced-by-count":16,"title":["From BPR to CPR \u2010 conceptualising re\u2010engineering in construction"],"prefix":"10.1108","volume":"4","author":[{"given":"P.E.D.","family":"Love","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"H.","family":"Li","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","reference":[{"key":"b2","doi-asserted-by":"crossref","unstructured":"Anumba, C.J. and Evbuomwan, N.F.O. (1996, \u201cConcurrent engineering in design\u2010build projects\u201d,Construction Management and Economics, Vol. 15 No. 3.","DOI":"10.1080\/014461997373006"},{"key":"b4","doi-asserted-by":"publisher","DOI":"10.1080\/10580539408964630"},{"key":"b8","unstructured":"Evbuomwan, N.F.O. and Anumba, C.J. (1996, \u201cTowards a concurrent engineering model for design\u2010and\u2010build projects\u201d,The Structural Engineer, Vol. 74 No. 5, March, pp. 3\u20108."},{"key":"b9","doi-asserted-by":"publisher","DOI":"10.1016\/0925-5273(95)00109-3"},{"key":"b13","doi-asserted-by":"publisher","DOI":"10.1080\/00207549608904937"},{"key":"b14","doi-asserted-by":"publisher","DOI":"10.1177\/154193129503901202"},{"key":"b15","unstructured":"Ireland, V. (1994, \u201cThe T40 project; process reengineering in construction\u201d,Australian Project Manager, Vol. 14, pp. 31\u20107."},{"key":"b18","doi-asserted-by":"crossref","unstructured":"Keidel, R.W. (1994, \u201cRe\u2010thinking organisational design\u201d,The Academy of Management Executive, Vol. 8 No. 4, pp. 12\u201030.","DOI":"10.5465\/ame.1994.9412071698"},{"key":"b20","unstructured":"Koskela, L. (1992,Application of the New Production Philosophy to Construction, CIFE Technical Report, No. 72, Centre for Integrated Facility Engineering, Stanford University."},{"key":"b22","unstructured":"Latham, M. (1994,Constructing the Team: Joint Review of Procurement and Contractual Arrangements in the UK Construction Industry, Department of the Environment."},{"key":"b23","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(97)00040-6"},{"key":"b24","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(97)00066-5"},{"key":"b25","doi-asserted-by":"publisher","DOI":"10.1108\/09544789810214828"},{"key":"b26","doi-asserted-by":"crossref","unstructured":"Love, P.E.D., Gunasekaran A. and Li, H. (1998c, \u201cPutting an engine into re\u2010engineering: toward a process orientated organisation\u201d,International Journal of Operations & Production Management(in press).","DOI":"10.1108\/01443579810225531"},{"key":"b27","unstructured":"Love, P.E.D., Mohamed, S. and Tucker, S.N. (1996, \u201cConstruction process re\u2010engineering and the Australian construction industry\u201d,Australian Institute of Building Papers, Vol. 7, pp. 13\u201023."},{"key":"b29","doi-asserted-by":"publisher","DOI":"10.1016\/0263-7863(96)00036-1"},{"key":"b31","unstructured":"Nicholas, J.M. (1994, \u201cConcurrent engineering: overcoming obstacles to teamwork\u201d,Production and Inventory Management, Vol. 35 No. 3, pp. 18\u201022."},{"key":"b32","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0483(95)00063-1"},{"key":"b39","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0483(96)00001-1"},{"key":"b40","unstructured":"The Economist(1994), \u201cRe\u2010engineering reviewed\u201d,The Economist,2 July, p. 66."}],"container-title":["Business Process Management Journal"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/14637159810238192","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full\/10.1108\/14637159810238192","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:36:47Z","timestamp":1753403807000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/bpmj\/article\/4\/4\/291-305\/258301"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[1998,12]]},"references-count":20,"journal-issue":{"issue":"4","published-print":{"date-parts":[[1998,12]]}},"alternative-id":["10.1108\/14637159810238192"],"URL":"https:\/\/doi.org\/10.1108\/14637159810238192","relation":{},"ISSN":["1463-7154"],"issn-type":[{"type":"print","value":"1463-7154"}],"subject":[],"published":{"date-parts":[[1998,12]]}}}