{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,2]],"date-time":"2026-04-02T07:16:45Z","timestamp":1775114205027,"version":"3.50.1"},"reference-count":16,"publisher":"Emerald","issue":"1","license":[{"start":{"date-parts":[[2007,1,23]],"date-time":"2007-01-23T00:00:00Z","timestamp":1169510400000},"content-version":"tdm","delay-in-days":0,"URL":"http:\/\/www.emeraldinsight.com\/page\/tdm"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Construction Innovation"],"published-print":{"date-parts":[[2007,1,23]]},"DOI":"10.1108\/14714170710721322","type":"journal-article","created":{"date-parts":[[2007,1,15]],"date-time":"2007-01-15T08:53:14Z","timestamp":1168851194000},"page":"99-121","source":"Crossref","is-referenced-by-count":59,"title":["Evaluating the effect of construction process characteristics to the applicability of lean principles"],"prefix":"10.1108","volume":"7","author":[{"given":"Abdulsalam A.","family":"Al\u2010Sudairi","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","reference":[{"key":"b2","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1990)116:4(575)"},{"key":"b3","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1992)118:3(525)"},{"key":"b4","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1994)120:2(288)"},{"key":"b6","doi-asserted-by":"publisher","DOI":"10.1080\/096132197370462"},{"key":"b33","unstructured":"Al\u2010Sudairi, A. (2004), \u201cSimulation as an aid tool to the best utilization of lean principles\u201d, in Bertelsen, S. and Formoso, C. (Eds),Proceedings 12th Ann. Conf. Intl. Group for Lean Construction IGLC\u201012, Helsingor, Denmark."},{"key":"b8","unstructured":"Al\u2010sudairi, A., Diekmann, J. and Songer, A. (2000), \u201cInterplay of project complexity and lean production methods\u201d,Proceedings 8th Ann. Conf. Intl. Group for Lean Construction IGLC\u20108, Brighton."},{"key":"b11","unstructured":"Ardhaldjian, R. and Fahner, M. (1994), \u201cUsing simulation in the business process reengineering effort\u201d,Industrial Engineering, July, pp. 60\u20101."},{"key":"b15","doi-asserted-by":"publisher","DOI":"10.1016\/S0045-7949(97)00147-8"},{"key":"b18","doi-asserted-by":"publisher","DOI":"10.1142\/S0219869X04000020"},{"key":"b21","doi-asserted-by":"publisher","DOI":"10.1108\/01443579710157989"},{"key":"b22","unstructured":"Houshyar, A. and Nuila, V. (1994), \u201cWell\u2010designed simulation: a tool for superior management, part 1\u201d,International Journal of Modeling and Simulation, Vol. 14 No. 3, pp. 129\u201033."},{"key":"b23","unstructured":"Kartam, S., Ibbs, W. and Ballard, G. (1995), \u201cReengineering construction planning\u201d,Project Management Journal, June, pp. 27\u201037."},{"key":"b26","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0742-597X(1996)12:6(40)"},{"key":"b27","doi-asserted-by":"crossref","unstructured":"Salem, O. and Zimmer, E. (2005), \u201cApplication of lean manufacturing principles to construction\u201d,Lean Construction Journal, Vol. 2 No. 2, pp. 51\u20104.","DOI":"10.60164\/40g1a6i4g"},{"key":"b29","unstructured":"Tommelein, I. (1997), \u201cModels of lean construction processes: example of pipe\u2010spool materials management\u201d,Proceedings of Construction Congress V, October 5\u20107 in Minneapolis, MN, ASCE, VA, USA, pp. 405\u201013."},{"key":"b30","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1998)124:4(279)"}],"container-title":["Construction Innovation"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/14714170710721322","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full\/10.1108\/14714170710721322","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:43:19Z","timestamp":1753404199000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/ci\/article\/7\/1\/99-121\/19606"}},"subtitle":[],"editor":[{"given":"Jay","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"editor","vocabulary":"crossref"}]}],"short-title":[],"issued":{"date-parts":[[2007,1,23]]},"references-count":16,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2007,1,23]]}},"alternative-id":["10.1108\/14714170710721322"],"URL":"https:\/\/doi.org\/10.1108\/14714170710721322","relation":{},"ISSN":["1471-4175"],"issn-type":[{"value":"1471-4175","type":"print"}],"subject":[],"published":{"date-parts":[[2007,1,23]]}}}