{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,4]],"date-time":"2026-07-04T11:08:39Z","timestamp":1783163319924,"version":"3.54.6"},"reference-count":154,"publisher":"Emerald","issue":"5","license":[{"start":{"date-parts":[[2018,10,8]],"date-time":"2018-10-08T00:00:00Z","timestamp":1538956800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["BPMJ"],"published-print":{"date-parts":[[2019,8,19]]},"abstract":"<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Purpose<\/jats:title>\n<jats:p>Despite its popularity, business process management (BPM) is not unequivocally defined, but obtains different forms with varying specifications. This paper presents a critical overview of BPM, as it appears within four dominant management paradigms: total quality management, standardized management systems, business process reengineering and Six Sigma. The purpose of this paper is to explore BPM specifications and compare the BPM implementation potential under each paradigm.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Design\/methodology\/approach<\/jats:title>\n<jats:p>This is based on the analysis of a large number of highly cited scholarly publications. In order to identify the nature of BPM within each paradigm, a common framework for comparison is first established and then, for each paradigm, BPM is analyzed according to the main parameters of this framework.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Findings<\/jats:title>\n<jats:p>Many differences among various BPM forms are paradigm driven. So, the approach adopted by each paradigm (i.e. individual-process or systemic approach) affects the scope and role of BPM. The principles of each paradigm directly affect the attributes assigned to BPM. Despite of important differences, the structure of BPM within all paradigms conforms to the stages of the classical BPM lifecycle. However, each paradigm assigns different weights to each stage and also displays different levels of BPM implementability.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Originality\/value<\/jats:title>\n<jats:p>The paper presents a first systematic comparison of BPM specifications for the dominant management paradigms primarily deployed. It thus explains why many attributes originating from the paradigms have crept into the general BPM specifications. This work can be considered as a step toward defining the core attributes of a paradigm-independent BPM model, thus enhancing its application scope as an invaluable management tool.<\/jats:p>\n<\/jats:sec>","DOI":"10.1108\/bpmj-01-2018-0023","type":"journal-article","created":{"date-parts":[[2018,10,8]],"date-time":"2018-10-08T09:28:13Z","timestamp":1538990893000},"page":"1040-1069","source":"Crossref","is-referenced-by-count":29,"title":["Paradigms in business process management specifications: a critical overview"],"prefix":"10.1108","volume":"25","author":[{"given":"Panos T.","family":"Chountalas","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Athanasios G.","family":"Lagodimos","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"140","published-online":{"date-parts":[[2018,10,8]]},"reference":[{"issue":"5","key":"key2021041509514440700_ref001","doi-asserted-by":"crossref","first-page":"549","DOI":"10.1016\/S0272-6963(00)00029-2","article-title":"The impact of design management and process management on quality: an empirical investigation","volume":"18","year":"2000","journal-title":"Journal of Operations Management"},{"issue":"1-2","key":"key2021041509514440700_ref002","first-page":"33","article-title":"Implications of some of the recent improvement philosophies for the management of the information systems organization","volume":"99","year":"1999","journal-title":"Industrial Management and Data Systems"},{"issue":"3","key":"key2021041509514440700_ref003","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1108\/BPMJ-03-2014-0019","article-title":"A systematic review of lean six sigma for the manufacturing industry","volume":"21","year":"2015","journal-title":"Business Process Management Journal"},{"issue":"5","key":"key2021041509514440700_ref004","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1108\/14637150110406812","article-title":"Business process reengineering: a survey of international experience","volume":"7","year":"2001","journal-title":"Business Process Management Journal"},{"issue":"4","key":"key2021041509514440700_ref005","doi-asserted-by":"crossref","first-page":"129","DOI":"10.2753\/MIS0742-1222270405","article-title":"Productivity and performance effects of business process reengineering: a firm-level analysis","volume":"27","year":"2011","journal-title":"Journal of Management Information Systems"},{"issue":"3","key":"key2021041509514440700_ref006","doi-asserted-by":"crossref","first-page":"472","DOI":"10.5465\/amr.1994.9412271808","article-title":"A theory of quality management underlying the Deming management method","volume":"19","year":"1994","journal-title":"Academy of Management Review"},{"issue":"3","key":"key2021041509514440700_ref007","doi-asserted-by":"crossref","first-page":"282","DOI":"10.1108\/09544780610660004","article-title":"Similarities and differences between TQM, six sigma and lean","volume":"18","year":"2006","journal-title":"The TQM Magazine"},{"issue":"2","key":"key2021041509514440700_ref008","first-page":"19","article-title":"Lean and six sigma methodologies in NHS Scotland: an empirical study and directions for future research","volume":"16","year":"2012","journal-title":"Quality Innovation Prosperity"},{"issue":"3","key":"key2021041509514440700_ref009","doi-asserted-by":"crossref","first-page":"294","DOI":"10.1108\/02656710710730889","article-title":"Six sigma in service organisations: benefits, challenges and difficulties, common myths, empirical observations and success factors","volume":"24","year":"2007","journal-title":"International Journal of Quality and Reliability Management"},{"issue":"1","key":"key2021041509514440700_ref010","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/S0024-6301(98)00130-7","article-title":"Strategic business process management for organisational effectiveness","volume":"32","year":"1999","journal-title":"Long Range Planning"},{"issue":"1","key":"key2021041509514440700_ref011","doi-asserted-by":"crossref","first-page":"5","DOI":"10.1108\/09544780510573020","article-title":"The integration of lean management and six sigma","volume":"17","year":"2005","journal-title":"The TQM Magazine"},{"issue":"3","key":"key2021041509514440700_ref012","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1108\/02656710910936735","article-title":"Process embedded design of integrated management systems","volume":"26","year":"2009","journal-title":"International Journal of Quality and Reliability Management"},{"issue":"5","key":"key2021041509514440700_ref013","doi-asserted-by":"crossref","first-page":"585","DOI":"10.1016\/S0378-7206(03)00098-3","article-title":"Exploring the relationship between information technology and business process reengineering","volume":"41","year":"2004","journal-title":"Information and Management"},{"issue":"7","key":"key2021041509514440700_ref014","doi-asserted-by":"crossref","first-page":"789","DOI":"10.1108\/01443571111144850","article-title":"The relationships between organizational culture, total quality management practices and operational performance","volume":"31","year":"2011","journal-title":"International Journal of Operations and Production Management"},{"key":"key2021041509514440700_ref015","volume-title":"2015\u20132016 Baldrige Excellence Framework: A Systems Approach to Improving your Organization\u2019s Performance","author":"Baldrige Performance Excellence Program","year":"2015"},{"issue":"4","key":"key2021041509514440700_ref016","doi-asserted-by":"crossref","first-page":"250","DOI":"10.1108\/09544780410541909","article-title":"Six sigma or design for six sigma?","volume":"16","year":"2004","journal-title":"The TQM Magazine"},{"issue":"2","key":"key2021041509514440700_ref017","doi-asserted-by":"crossref","first-page":"238","DOI":"10.5465\/amr.2003.9416096","article-title":"Exploitation, exploration, and process management: the productivity dilemma revisited","volume":"28","year":"2003","journal-title":"Academy of Management Review"},{"issue":"9-10","key":"key2021041509514440700_ref018","first-page":"1000","article-title":"A critical examination of the business process re-engineering phenomenon","volume":"18","year":"1998","journal-title":"International Journal of Operations and Production Management"},{"issue":"3","key":"key2021041509514440700_ref019","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1080\/14783360500054145","article-title":"The new ISO 9001 and the problem of ceremonial conformity: how have audit methods evolved?","volume":"16","year":"2005","journal-title":"Total Quality Management and Business Excellence"},{"issue":"2","key":"key2021041509514440700_ref020","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1108\/14637150310468371","article-title":"Process management practices and quality systems standards: risks and opportunities of the new ISO 9001 certification","volume":"9","year":"2003","journal-title":"Business Process Management Journal"},{"issue":"1","key":"key2021041509514440700_ref021","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1111\/j.1540-5915.1996.tb00841.x","article-title":"Identification of the critical factors of TQM","volume":"27","year":"1996","journal-title":"Decision Sciences"},{"issue":"1","key":"key2021041509514440700_ref022","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.jom.2008.04.001","article-title":"An empirical assessment of the EFQM excellence model: evaluation as a TQM framework relative to the MBNQA model","volume":"27","year":"2009","journal-title":"Journal of Operations Management"},{"issue":"2","key":"key2021041509514440700_ref023","doi-asserted-by":"crossref","first-page":"159","DOI":"10.2307\/249750","article-title":"The implications of information technology infrastructure for business process redesign","volume":"23","year":"1999","journal-title":"MIS Quarterly"},{"issue":"12","key":"key2021041509514440700_ref024","first-page":"56","article-title":"Develop a process based management system","volume":"37","year":"2004","journal-title":"Quality Progress"},{"issue":"2","key":"key2021041509514440700_ref025","first-page":"37","article-title":"The matrix of change","volume":"38","year":"1997","journal-title":"Sloan Management Review"},{"issue":"6","key":"key2021041509514440700_ref026","doi-asserted-by":"crossref","first-page":"803","DOI":"10.1108\/14637150810915982","article-title":"Process-based management: a structured approach to provide the best answers to the ISO 9001 requirements","volume":"14","year":"2008","journal-title":"Business Process Management Journal"},{"issue":"3","key":"key2021041509514440700_ref027","doi-asserted-by":"crossref","first-page":"233","DOI":"10.2307\/249617","article-title":"Business reengineering at CIGNA corporation: experiences and lessons learned from the first five years","volume":"18","year":"1994","journal-title":"MIS Quarterly"},{"issue":"1","key":"key2021041509514440700_ref028","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ijpe.2009.01.003","article-title":"Six sigma programs: an implementation model","volume":"119","year":"2009","journal-title":"International Journal of Production Economics"},{"key":"key2021041509514440700_ref029","volume-title":"Business Process Management Systems: Strategy and Implementation","year":"2006"},{"issue":"3","key":"key2021041509514440700_ref030","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1108\/17542730810867218","article-title":"Implementing six sigma via TQM improvement: an empirical study in Taiwan","volume":"20","year":"2008","journal-title":"The TQM Journal"},{"issue":"4","key":"key2021041509514440700_ref031","doi-asserted-by":"crossref","first-page":"332","DOI":"10.1108\/20401461111189425","article-title":"Japanese total quality control, TQM, Deming\u2019s system of profound knowledge, BPR, lean and six sigma: comparison and discussion","volume":"2","year":"2011","journal-title":"International Journal of Lean Six Sigma"},{"issue":"9","key":"key2021041509514440700_ref032","doi-asserted-by":"crossref","first-page":"897","DOI":"10.1108\/00070700910992835","article-title":"Standardized food safety management: the case of industrial yoghurt","volume":"111","year":"2009","journal-title":"British Food Journal"},{"key":"key2021041509514440700_ref033","volume-title":"Quality is Free: The Art of Making Quality Certain","year":"1979"},{"issue":"6","key":"key2021041509514440700_ref034","doi-asserted-by":"crossref","first-page":"1154","DOI":"10.1111\/j.1467-6486.2009.00880.x","article-title":"A multi-dimensional framework of organizational innovation: a systematic review of the literature","volume":"47","year":"2010","journal-title":"Journal of Management Studies"},{"issue":"3","key":"key2021041509514440700_ref035","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1108\/09544780610659998","article-title":"Lean production, six sigma quality, TQM and company culture","volume":"18","year":"2006","journal-title":"The TQM Magazine"},{"issue":"1-2","key":"key2021041509514440700_ref036","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/14783363.2012.756749","article-title":"Diagnosing and prognosticating the quality movement: a review on the 25 years quality literature (1987\u20132011)","volume":"24","year":"2013","journal-title":"Total Quality Management and Business Excellence"},{"key":"key2021041509514440700_ref037","volume-title":"Process Innovation: Reengineering Work through Information Technology","year":"1993"},{"issue":"4","key":"key2021041509514440700_ref038","first-page":"11","article-title":"The new industrial engineering: information technology and business process redesign","volume":"31","year":"1990","journal-title":"Sloan Management Review"},{"issue":"3","key":"key2021041509514440700_ref039","doi-asserted-by":"crossref","first-page":"392","DOI":"10.5465\/amr.1994.9412271803","article-title":"Management theory and total quality: improving research and practice through theory development","volume":"19","year":"1994","journal-title":"Academy of Management Review"},{"key":"key2021041509514440700_ref040","volume-title":"Out of the Crisis","year":"1986"},{"key":"key2021041509514440700_ref041","volume-title":"The New Economics for Industry, Government, Education","year":"1993"},{"key":"key2021041509514440700_ref042","volume-title":"Business Competitiveness","year":"2007","edition":"2nd ed."},{"issue":"3","key":"key2021041509514440700_ref043","first-page":"55","article-title":"How to stay flexible and elude fads","volume":"30","year":"1997","journal-title":"Quality Progress"},{"issue":"4","key":"key2021041509514440700_ref044","doi-asserted-by":"crossref","first-page":"348","DOI":"10.1108\/01443570310467302","article-title":"An initial assessment of the influence of IT on TQM: a multiple case study","volume":"23","year":"2003","journal-title":"International Journal of Operations and Production Management"},{"issue":"4","key":"key2021041509514440700_ref045","doi-asserted-by":"crossref","first-page":"93","DOI":"10.2307\/41165768","article-title":"Business process reengineering: improving in new strategic directions","volume":"36","year":"1994","journal-title":"California Management Review"},{"issue":"1","key":"key2021041509514440700_ref046","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1016\/0263-2373(94)90043-4","article-title":"How new is business process redesign?","volume":"12","year":"1994","journal-title":"European Management Journal"},{"issue":"5","key":"key2021041509514440700_ref047","doi-asserted-by":"crossref","first-page":"753","DOI":"10.1016\/S0024-6301(97)00056-3","article-title":"Operationalizing strategy through process","volume":"30","year":"1997","journal-title":"Long Range Planning"},{"key":"key2021041509514440700_ref048","volume-title":"EFQM Excellence Model 2013","author":"European Foundation for Quality Management","year":"2012"},{"issue":"6","key":"key2021041509514440700_ref049","doi-asserted-by":"crossref","first-page":"564","DOI":"10.1108\/17410400910977091","article-title":"The use of quality management tools and techniques in ISO 9001:2000 certified companies: the Greek case","volume":"58","year":"2009","journal-title":"International Journal of Productivity and Performance Management"},{"issue":"5","key":"key2021041509514440700_ref050","first-page":"77","article-title":"Leveraging processes for strategic advantage","volume":"73","year":"1995","journal-title":"Harvard Business Review"},{"issue":"4","key":"key2021041509514440700_ref051","first-page":"33","article-title":"The processes of organization and management","volume":"39","year":"1998","journal-title":"Sloan Management Review"},{"issue":"13","key":"key2021041509514440700_ref052","doi-asserted-by":"crossref","first-page":"3091","DOI":"10.1080\/0020754031000101312","article-title":"Incorporating links to ISO 9001 into manufacturing process models using IDEF 9000","volume":"41","year":"2003","journal-title":"International Journal of Production Research"},{"issue":"5","key":"key2021041509514440700_ref053","doi-asserted-by":"crossref","first-page":"403","DOI":"10.1002\/qre.491","article-title":"A strategic assessment of six sigma","volume":"18","year":"2002","journal-title":"Quality and Reliability Engineering International"},{"issue":"2","key":"key2021041509514440700_ref054","first-page":"89","article-title":"Business process reengineering: strategic tool for managing organizational change an application in a multinational company","volume":"7","year":"2012","journal-title":"International Journal of Business and Management"},{"issue":"10","key":"key2021041509514440700_ref055","doi-asserted-by":"crossref","first-page":"1326","DOI":"10.1108\/EUM0000000005972","article-title":"An empirical study of the ISO 9000 standards\u2019 contribution towards total quality management","volume":"21","year":"2001","journal-title":"International Journal of Operations and Production Management"},{"issue":"1","key":"key2021041509514440700_ref056","doi-asserted-by":"crossref","first-page":"80","DOI":"10.1108\/13598539810203887","article-title":"A survey instrument for standardizing TQM modeling research","volume":"3","year":"1998","journal-title":"International Journal of Quality Science"},{"issue":"11","key":"key2021041509514440700_ref057","doi-asserted-by":"crossref","first-page":"2521","DOI":"10.1080\/00207540210132733","article-title":"Modelling and analysis of business process reengineering","volume":"40","year":"2002","journal-title":"International Journal of Production Research"},{"issue":"2-3","key":"key2021041509514440700_ref058","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/S0925-5273(97)00035-2","article-title":"The role of information technology in business process reengineering","volume":"50","year":"1997","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"key2021041509514440700_ref059","first-page":"45","article-title":"Beyond PDCA: a new process management model","volume":"39","year":"2006","journal-title":"Quality Progress"},{"issue":"6","key":"key2021041509514440700_ref060","doi-asserted-by":"crossref","first-page":"577","DOI":"10.1080\/14783363.2010.483064","article-title":"Quality management initiatives in Europe: an empirical analysis according to their structural elements","volume":"21","year":"2010","journal-title":"Total Quality Management"},{"issue":"2","key":"key2021041509514440700_ref061","doi-asserted-by":"crossref","first-page":"309","DOI":"10.2307\/2393640","article-title":"Total quality management: empirical, conceptual, and practical issues","volume":"40","year":"1995","journal-title":"Administrative Science Quarterly"},{"issue":"4","key":"key2021041509514440700_ref062","first-page":"104","article-title":"Reengineering work: don\u2019t automate, obliterate","volume":"68","year":"1990","journal-title":"Harvard Business Review"},{"issue":"2","key":"key2021041509514440700_ref063","first-page":"26","article-title":"Process management and the future of six sigma","volume":"43","year":"2002","journal-title":"Sloan Management Review"},{"issue":"4","key":"key2021041509514440700_ref064","first-page":"111","article-title":"The process audit","volume":"85","year":"2007","journal-title":"Harvard Business Review"},{"key":"key2021041509514440700_ref065","doi-asserted-by":"crossref","unstructured":"Hammer, M. (2010), \u201cWhat is business process management?\u201d, in vom Brocke, J. and Rosemann, M. (Eds), Handbook on Business Process Management Vol. 1, Springer, Berlin and Heidelberg, pp. 3-16.","DOI":"10.1007\/978-3-642-00416-2_1"},{"key":"key2021041509514440700_ref066","volume-title":"Reengineering the Corporation: A Manifesto for Business Revolution","year":"1993","edition":"1st ed."},{"key":"key2021041509514440700_ref067","doi-asserted-by":"crossref","unstructured":"Harmon, P. (2015), \u201cThe scope and evolution of business process management\u201d, in vom Brocke, J. and Rosemann, M. (Eds), Handbook on Business Process Management, Vol. 1, Springer, Berlin and Heidelberg, pp. 37-80.","DOI":"10.1007\/978-3-642-45100-3_3"},{"issue":"5","key":"key2021041509514440700_ref068","first-page":"60","article-title":"Six sigma: a breakthrough strategy for profitability","volume":"31","year":"1998","journal-title":"Quality Progress"},{"key":"key2021041509514440700_ref069","volume-title":"Six sigma: The Breakthrough Management Strategy Revolutionizing the World\u2019s Top Corporations","year":"2000","edition":"1st ed."},{"key":"key2021041509514440700_ref070","volume-title":"What is Six Sigma Process Management?","year":"2005"},{"issue":"3","key":"key2021041509514440700_ref071","doi-asserted-by":"crossref","first-page":"79","DOI":"10.1016\/0007-6813(95)90027-6","article-title":"Getting past the obstacles to successful reengineering","volume":"38","year":"1995","journal-title":"Business Horizons"},{"issue":"1","key":"key2021041509514440700_ref072","doi-asserted-by":"crossref","first-page":"21","DOI":"10.1080\/14783360500249836","article-title":"Business process management as competitive advantage: a review and empirical study","volume":"17","year":"2006","journal-title":"Total Quality Management and Business Excellence"},{"key":"key2021041509514440700_ref073","volume-title":"What is Total Quality Control? The Japanese Way","year":"1985"},{"key":"key2021041509514440700_ref074","volume-title":"Directives, Part 1: Consolidated ISO Supplement \u2013 Procedures Specific to ISO","author":"ISO\/IEC","year":"2017","edition":"8th ed."},{"key":"key2021041509514440700_ref075","volume-title":"Business Process Management: Practical Guidelines to Successful Implementations","year":"2006"},{"issue":"8","key":"key2021041509514440700_ref076","doi-asserted-by":"crossref","first-page":"713","DOI":"10.1016\/j.jclepro.2005.04.005","article-title":"Integrated management systems: three different levels of integration","volume":"14","year":"2006","journal-title":"Journal of Cleaner Production"},{"issue":"5","key":"key2021041509514440700_ref077","doi-asserted-by":"crossref","first-page":"702","DOI":"10.1017\/jmo.2015.58","article-title":"Crossing the management fashion border: the adoption of business process reengineering services by management consultants offering total quality management services in the United States, 1992\u20132004","volume":"22","year":"2016","journal-title":"Journal of Management and Organization"},{"issue":"8","key":"key2021041509514440700_ref078","first-page":"19","article-title":"The quality trilogy","volume":"19","year":"1986","journal-title":"Quality Progress"},{"issue":"7","key":"key2021041509514440700_ref079","doi-asserted-by":"crossref","first-page":"633","DOI":"10.1080\/0954412988325","article-title":"Measurement of business excellence","volume":"9","year":"1998","journal-title":"Total Quality Management"},{"key":"key2021041509514440700_ref080","doi-asserted-by":"crossref","unstructured":"Kannengiesser, U. (2008), \u201cSubsuming the BPM life cycle in an ontological framework of designing\u201d, in Dietz, J.L.G., Albani, A. and Barjis, J. (Eds), Advances in Enterprise Engineering I, Proceedings \u2013 Lecture Notes in Business Information Processing, Vol. 10, Springer-Verlag Berlin, Berlin, pp. 31-45.","DOI":"10.1007\/978-3-540-68644-6_3"},{"issue":"4","key":"key2021041509514440700_ref081","doi-asserted-by":"crossref","first-page":"451","DOI":"10.1080\/1478336032000047264","article-title":"Integration of standardized management systems: searching for a recipe and ingredients","volume":"14","year":"2003","journal-title":"Total Quality Management and Business Excellence"},{"issue":"1","key":"key2021041509514440700_ref082","doi-asserted-by":"crossref","first-page":"93","DOI":"10.1016\/S0024-6301(97)00094-0","article-title":"Aligning BPR to strategy: a framework for analysis","volume":"31","year":"1998","journal-title":"Long Range Planning"},{"issue":"1","key":"key2021041509514440700_ref083","doi-asserted-by":"crossref","first-page":"31","DOI":"10.1108\/13683040110385809","article-title":"Six Sigma seen as a methodology for total quality management","volume":"5","year":"2001","journal-title":"Measuring Business Excellence"},{"issue":"3","key":"key2021041509514440700_ref084","doi-asserted-by":"crossref","first-page":"786","DOI":"10.1108\/BPMJ-11-2016-0226","article-title":"Business process management \u2013 at the crossroads","volume":"24","year":"2018","journal-title":"Business Process Management Journal"},{"issue":"2","key":"key2021041509514440700_ref085","doi-asserted-by":"crossref","first-page":"267","DOI":"10.1108\/14637151111122347","article-title":"Process orientation: conceptualization and measurement","volume":"17","year":"2011","journal-title":"Business Process Management Journal"},{"issue":"4","key":"key2021041509514440700_ref086","doi-asserted-by":"crossref","first-page":"407","DOI":"10.1080\/09537280500483350","article-title":"Implementing the lean sigma framework in an Indian SME: a case study","volume":"17","year":"2006","journal-title":"Production Planning and Control"},{"issue":"5-6","key":"key2021041509514440700_ref087","doi-asserted-by":"crossref","first-page":"708","DOI":"10.1016\/j.technovation.2004.10.003","article-title":"Benefits, obstacles, and future of six sigma approach","volume":"26","year":"2006","journal-title":"Technovation"},{"issue":"18","key":"key2021041509514440700_ref088","doi-asserted-by":"crossref","first-page":"1743","DOI":"10.1016\/j.jclepro.2006.06.015","article-title":"The state of ISO 14001 certification in Greece","volume":"15","year":"2007","journal-title":"Journal of Cleaner Production"},{"issue":"4","key":"key2021041509514440700_ref089","doi-asserted-by":"crossref","first-page":"505","DOI":"10.1080\/14783360500078649","article-title":"The penetration of ISO 9000 certification in Greek industries","volume":"16","year":"2005","journal-title":"Total Quality Management and Business Excellence"},{"issue":"1","key":"key2021041509514440700_ref090","first-page":"65","article-title":"Quality circles after the fad","volume":"63","year":"1984","journal-title":"Harvard Business Review"},{"key":"key2021041509514440700_ref091","doi-asserted-by":"crossref","unstructured":"Lee, J.Y., Lee, D.Y. and Kang, S.W. (2007), \u201cAn overview of the business process maturity model (BPMM)\u201d, in Chang, K.C.C., Wang, W., Chen, L., Ellis, C.A., Hsu, C.H., Tsoi, A.C. and Wang, H.X. (Eds), Advances in Web and Network Technologies, and Information Management, Proceedings \u2013 Lecture Notes in Computer Science, Vol. 4537, Springer-Verlag Berlin, Berlin, pp. 384-395.","DOI":"10.1007\/978-3-540-72909-9_42"},{"issue":"5-6","key":"key2021041509514440700_ref092","first-page":"687","article-title":"A SUPER methodology for business process improvement: an industrial case study in Hong Kong\/China","volume":"21","year":"2001","journal-title":"International Journal of Operations and Production Management"},{"issue":"2","key":"key2021041509514440700_ref093","doi-asserted-by":"crossref","first-page":"193","DOI":"10.1016\/S0272-6963(02)00087-6","article-title":"Six sigma: a goal-theoretic perspective","volume":"21","year":"2003","journal-title":"Journal of Operations Management"},{"issue":"2","key":"key2021041509514440700_ref094","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1108\/02635571111115191","article-title":"ISO 9001 diffusion analysis according to activity sectors","volume":"111","year":"2011","journal-title":"Industrial Management and Data Systems"},{"issue":"3","key":"key2021041509514440700_ref095","doi-asserted-by":"crossref","first-page":"306","DOI":"10.1016\/S0263-2373(98)00007-3","article-title":"Operations management and reengineering","volume":"16","year":"1998","journal-title":"European Management Journal"},{"issue":"4","key":"key2021041509514440700_ref096","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1108\/13598540410550019","article-title":"The development of a supply chain management process maturity model using the concepts of business process orientation","volume":"9","year":"2004","journal-title":"Supply Chain Management \u2013 An International Journal"},{"issue":"2-3","key":"key2021041509514440700_ref097","doi-asserted-by":"crossref","first-page":"141","DOI":"10.1016\/S0925-5273(97)00038-8","article-title":"A strategic alignment approach for effective business process reengineering: linking strategy, processes and customers for competitive advantage","volume":"50","year":"1997","journal-title":"International Journal of Production Economics"},{"issue":"8","key":"key2021041509514440700_ref098","doi-asserted-by":"crossref","first-page":"1389","DOI":"10.1177\/0170840604046349","article-title":"Process transformation: limitations to radical organizational change within public service organizations","volume":"25","year":"2004","journal-title":"Organization Studies"},{"issue":"2","key":"key2021041509514440700_ref099","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1108\/02656710810846934","article-title":"ISO 9001:2000 in the Egyptian manufacturing sector: perceptions and perspectives","volume":"25","year":"2008","journal-title":"International Journal of Quality and Reliability Management"},{"issue":"15","key":"key2021041509514440700_ref100","doi-asserted-by":"crossref","first-page":"1734","DOI":"10.1016\/j.jclepro.2011.06.003","article-title":"Comparative analysis of diffusion of the ISO 14001 standard by sector of activity","volume":"19","year":"2011","journal-title":"Journal of Cleaner Production"},{"issue":"1","key":"key2021041509514440700_ref101","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1108\/20401461311310508","article-title":"Integrating six sigma with ISO 9001","volume":"4","year":"2013","journal-title":"International Journal of Lean Six Sigma"},{"issue":"1","key":"key2021041509514440700_ref102","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/j.ijpe.2007.02.046","article-title":"Simultaneous consideration of TQM and ISO 9000 on performance and motivation: an empirical study of Spanish companies","volume":"113","year":"2008","journal-title":"International Journal of Production Economics"},{"issue":"6","key":"key2021041509514440700_ref103","doi-asserted-by":"crossref","first-page":"596","DOI":"10.1108\/01443570310476645","article-title":"Factors characterising the maturity of BPR programmes","volume":"23","year":"2003","journal-title":"International Journal of Operations and Production Management"},{"issue":"3","key":"key2021041509514440700_ref104","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1016\/S0272-6963(02)00109-2","article-title":"Assessing the impact of environmental management systems on corporate and environmental performance","volume":"21","year":"2003","journal-title":"Journal of Operations Management"},{"issue":"3","key":"key2021041509514440700_ref105","doi-asserted-by":"crossref","first-page":"329","DOI":"10.1111\/j.1751-5823.2008.00061.x","article-title":"An overview of six sigma","volume":"76","year":"2008","journal-title":"International Statistical Review"},{"issue":"9-10","key":"key2021041509514440700_ref106","first-page":"964","article-title":"Business process reengineering: a theoretical framework and an integrated model","volume":"18","year":"1998","journal-title":"International Journal of Operations and Production Management"},{"key":"key2021041509514440700_ref107","doi-asserted-by":"crossref","unstructured":"Muehlen, M.Z. and Ho, D.T.Y. (2006), \u201cRisk management in the BPM lifecycle\u201d, in Bussler, C. and Haller, A. (Eds), Business Process Management Workshops \u2013 Lecture Notes in Computer Science, Vol. 3812, Springer-Verlag Berlin, Berlin, pp. 454-466.","DOI":"10.1007\/11678564_42"},{"key":"key2021041509514440700_ref108","article-title":"Business process reengineering: a consolidated methodology","year":"1999"},{"issue":"3","key":"key2021041509514440700_ref109","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1108\/14637150810876634","article-title":"Lean, six sigma and lean sigma: fads or real process improvement methods?","volume":"14","year":"2008","journal-title":"Business Process Management Journal"},{"issue":"3","key":"key2021041509514440700_ref110","first-page":"73","article-title":"How to compare six sigma, lean and the theory of constraints","volume":"35","year":"2002","journal-title":"Quality Progress"},{"issue":"1","key":"key2021041509514440700_ref111","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.jom.2005.01.004","article-title":"Achieving competitive advantage through implementing a replicable management standard: installing and using ISO 9000","volume":"24","year":"2005","journal-title":"Journal of Operations Management"},{"issue":"2","key":"key2021041509514440700_ref112","doi-asserted-by":"crossref","first-page":"166","DOI":"10.1108\/14637150910949434","article-title":"An empirical study about the status of business process management","volume":"15","year":"2009","journal-title":"Business Process Management Journal"},{"issue":"5","key":"key2021041509514440700_ref113","doi-asserted-by":"crossref","first-page":"694","DOI":"10.1108\/14637150810903066","article-title":"Process management tasks: a conceptual and practical view","volume":"14","year":"2008","journal-title":"Business Process Management Journal"},{"issue":"2","key":"key2021041509514440700_ref114","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1108\/17542730910938182","article-title":"Exploring process management: are there any widespread models and definitions?","volume":"21","year":"2009","journal-title":"The TQM Journal"},{"issue":"2","key":"key2021041509514440700_ref115","doi-asserted-by":"crossref","first-page":"138","DOI":"10.1108\/02656711011014276","article-title":"The evolution of lean six sigma","volume":"27","year":"2010","journal-title":"International Journal of Quality and Reliability Management"},{"issue":"4","key":"key2021041509514440700_ref116","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1108\/09544780410541891","article-title":"Integrating six sigma with quality management systems","volume":"16","year":"2004","journal-title":"The TQM Magazine"},{"key":"key2021041509514440700_ref117","volume-title":"Competitive Advantage: Creating and Sustaining Superior Performance","year":"1985"},{"issue":"3","key":"key2021041509514440700_ref118","doi-asserted-by":"crossref","first-page":"296","DOI":"10.1016\/j.omega.2004.11.004","article-title":"The integration of TQM and technology\/RandD management in determining quality and innovation performance","volume":"34","year":"2006","journal-title":"Omega"},{"issue":"3","key":"key2021041509514440700_ref119","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1108\/14637151111136360","article-title":"Core process management practices, quality tools and quality improvement in ISO 9001 certified manufacturing companies","volume":"17","year":"2011","journal-title":"Business Process Management Journal"},{"issue":"3","key":"key2021041509514440700_ref120","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1080\/09544120220135246","article-title":"Integrating the safety dimension into quality management systems: a process model","volume":"13","year":"2002","journal-title":"Total Quality Management"},{"issue":"1","key":"key2021041509514440700_ref121","doi-asserted-by":"crossref","first-page":"142","DOI":"10.1016\/j.ijinfomgt.2015.10.004","article-title":"Business process management and IT management: the missing integration","volume":"36","year":"2016","journal-title":"International Journal of Information Management"},{"issue":"3-4","key":"key2021041509514440700_ref122","first-page":"491","article-title":"Six sigma: concepts, tools, and applications","volume":"105","year":"2005","journal-title":"Industrial Management and Data Systems"},{"issue":"2","key":"key2021041509514440700_ref123","first-page":"65","article-title":"Is there dependence between process maturity and process performance?","volume":"12","year":"2012","journal-title":"Communications of the IIMA"},{"issue":"3","key":"key2021041509514440700_ref124","doi-asserted-by":"crossref","first-page":"381","DOI":"10.2307\/3250967","article-title":"Quality management in systems development: an organizational system perspective","volume":"24","year":"2000","journal-title":"MIS Quarterly"},{"issue":"3","key":"key2021041509514440700_ref125","doi-asserted-by":"crossref","first-page":"323","DOI":"10.1504\/IJSSCA.2005.008095","article-title":"Six sigma and its link to TQM, BPR, lean and the learning organisation","volume":"1","year":"2005","journal-title":"International Journal of Six Sigma and Competitive Advantage"},{"key":"key2021041509514440700_ref126","doi-asserted-by":"crossref","unstructured":"Rosemann, M. and vom Brocke, J. (2015), \u201cThe six core elements of business process management\u201d, in vom Brocke, J. and Rosemann, M. (Eds), Handbook on Business Process Management, Vol. 1, 2nd ed., Springer, Heidelberg, pp. 105-122.","DOI":"10.1007\/978-3-642-45100-3_5"},{"key":"key2021041509514440700_ref127","volume-title":"Improving Performance: How to Manage the White Space on the Organization Chart","year":"1990","edition":"1st ed."},{"issue":"1","key":"key2021041509514440700_ref128","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.ijpe.2010.02.013","article-title":"Investigating the effects of innovation and employee performance on the relationship between total quality management practices and firm performance: an empirical study of Turkish firms","volume":"127","year":"2010","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"key2021041509514440700_ref129","doi-asserted-by":"crossref","first-page":"536","DOI":"10.1016\/j.jom.2007.06.007","article-title":"Six sigma: definition and underlying theory","volume":"26","year":"2008","journal-title":"Journal of Operations Management"},{"issue":"2","key":"key2021041509514440700_ref130","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1016\/S0272-6963(02)00108-0","article-title":"Lean manufacturing: context, practice bundles, and performance","volume":"21","year":"2003","journal-title":"Journal of Operations Management"},{"issue":"6","key":"key2021041509514440700_ref131","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1108\/17542730810909365","article-title":"TQM implementation elements for manufacturing excellence","volume":"20","year":"2008","journal-title":"The TQM Journal"},{"issue":"2","key":"key2021041509514440700_ref132","doi-asserted-by":"crossref","first-page":"235","DOI":"10.1080\/0020754021000022212","article-title":"Examination and comparison of the critical factors of total quality management (TQM) across countries","volume":"41","year":"2003","journal-title":"International Journal of Production Research"},{"issue":"3","key":"key2021041509514440700_ref133","doi-asserted-by":"crossref","first-page":"537","DOI":"10.5465\/amr.1994.9412271813","article-title":"Distinguishing control from learning in total quality management: a contingency perspective","volume":"19","year":"1994","journal-title":"Academy of Management Review"},{"key":"key2021041509514440700_ref134","volume-title":"Business Process Management: The Third Wave","year":"2003","edition":"1st ed."},{"issue":"1","key":"key2021041509514440700_ref135","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1504\/IJSSCA.2006.009367","article-title":"Improving service quality by capitalising on an integrated lean six sigma methodology","volume":"2","year":"2006","journal-title":"International Journal of Six Sigma and Competitive Advantage"},{"issue":"6","key":"key2021041509514440700_ref136","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1016\/0024-6301(93)90204-S","article-title":"Business reengineering: a strategy-driven approach","volume":"26","year":"1993","journal-title":"Long Range Planning"},{"key":"key2021041509514440700_ref137","doi-asserted-by":"crossref","unstructured":"Teng, J.T.C., Grover, V. and Fiedler, K.D. (1994), \u201cBusiness process reengineering: charting a strategic path for the information age\u201d, California Management Review, Vol. 36 No. 3, pp. 9-31.","DOI":"10.2307\/41165753"},{"key":"key2021041509514440700_ref138","doi-asserted-by":"crossref","first-page":"197","DOI":"10.1016\/j.ijpe.2014.08.011","article-title":"ISO 9000 quality system certification and its impact on product and process innovation performance","volume":"158","year":"2014","journal-title":"International Journal of Production Economics"},{"issue":"2","key":"key2021041509514440700_ref139","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1108\/14637150610657495","article-title":"Standardization through process documentation","volume":"12","year":"2006","journal-title":"Business Process Management Journal"},{"issue":"1","key":"key2021041509514440700_ref140","doi-asserted-by":"crossref","first-page":"65","DOI":"10.1108\/14637159910249117","article-title":"Critical review of existing BPR methodologies: the need for a holistic approach","volume":"5","year":"1999","journal-title":"Business Process Management Journal"},{"issue":"2","key":"key2021041509514440700_ref141","first-page":"182","article-title":"Replaying history on process models for conformance checking and performance analysis","volume":"2","year":"2012","journal-title":"Wiley Interdisciplinary Reviews: Data Mining and Knowledge Discovery"},{"key":"key2021041509514440700_ref142","first-page":"1","article-title":"Business process management: a survey","year":"2003"},{"issue":"3","key":"key2021041509514440700_ref143","doi-asserted-by":"crossref","first-page":"50","DOI":"10.1177\/030630700002500304","article-title":"ISO 9000 series and excellence models: fad to fashion to fit","volume":"25","year":"2000","journal-title":"Journal of General Management"},{"issue":"3","key":"key2021041509514440700_ref144","doi-asserted-by":"crossref","first-page":"486","DOI":"10.1016\/j.ijinfomgt.2015.10.002","article-title":"On the role of context in business process management","volume":"36","year":"2016","journal-title":"International Journal of Information Management"},{"issue":"3","key":"key2021041509514440700_ref145","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1108\/09544780510594225","article-title":"Best practices of selected Greek organizations on their road to business excellence: the contribution of the new ISO 9000:2000 series of standards","volume":"17","year":"2005","journal-title":"The TQM Magazine"},{"issue":"2","key":"key2021041509514440700_ref146","first-page":"13","article-title":"Analyzing the past to prepare for the future: writing a literature review","volume":"26","year":"2002","journal-title":"MIS Quarterly"},{"issue":"3","key":"key2021041509514440700_ref147","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/j.giq.2010.07.010","article-title":"Transformational change and business process reengineering (BPR): lessons from the British and Dutch public sector","volume":"28","year":"2011","journal-title":"Government Information Quarterly"},{"key":"key2021041509514440700_ref148","doi-asserted-by":"crossref","unstructured":"Willaert, P., Van den Bergh, J., Willems, J. and Deschoolmeester, D. (2007), \u201cThe process-oriented organisation: a holistic view: developing a framework for business process orientation maturity\u201d, in Alonso, G., Dadam, P. and Rosemann, M. (Eds), Business Process Management, Proceedings \u2013 Lecture Notes in Computer Science, Vol. 4714, Springer-Verlag Berlin, Berlin, pp. 1-15.","DOI":"10.1007\/978-3-540-75183-0_1"},{"issue":"4","key":"key2021041509514440700_ref149","doi-asserted-by":"crossref","first-page":"313","DOI":"10.1016\/S0378-7206(01)00099-4","article-title":"A model for implementing BPR based on strategic perspectives: an empirical study","volume":"39","year":"2002","journal-title":"Information and Management"},{"issue":"3","key":"key2021041509514440700_ref150","doi-asserted-by":"crossref","first-page":"545","DOI":"10.1080\/0020754021000033896","article-title":"Senior management perspectives and ISO 9000 effectiveness: an empirical research","volume":"41","year":"2003","journal-title":"International Journal of Production Research"},{"issue":"1","key":"key2021041509514440700_ref151","doi-asserted-by":"crossref","first-page":"64","DOI":"10.1108\/14637159710161585","article-title":"Business process management: a boundaryless approach to modern competitiveness","volume":"3","year":"1997","journal-title":"Business Process Management Journal"},{"issue":"3","key":"key2021041509514440700_ref152","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1108\/00251749510085021","article-title":"Business process reengineering and process management: a survey of current practice and future trends in integrated management","volume":"33","year":"1995","journal-title":"Management Decision"},{"issue":"18","key":"key2021041509514440700_ref153","doi-asserted-by":"crossref","first-page":"1760","DOI":"10.1016\/j.jclepro.2006.03.007","article-title":"A synergetic model for implementing an integrated management system: an empirical study in China","volume":"15","year":"2007","journal-title":"Journal of Cleaner Production"},{"issue":"5","key":"key2021041509514440700_ref154","doi-asserted-by":"crossref","first-page":"630","DOI":"10.1016\/j.jom.2008.02.001","article-title":"The evolving theory of quality management: the role of six sigma","volume":"26","year":"2008","journal-title":"Journal of Operations Management"}],"container-title":["Business Process Management Journal"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/BPMJ-01-2018-0023\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/BPMJ-01-2018-0023\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T23:14:14Z","timestamp":1753398854000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/bpmj\/article\/25\/5\/1040-1069\/256651"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2018,10,8]]},"references-count":154,"journal-issue":{"issue":"5","published-online":{"date-parts":[[2018,10,8]]},"published-print":{"date-parts":[[2019,8,19]]}},"alternative-id":["10.1108\/BPMJ-01-2018-0023"],"URL":"https:\/\/doi.org\/10.1108\/bpmj-01-2018-0023","relation":{},"ISSN":["1463-7154"],"issn-type":[{"value":"1463-7154","type":"print"}],"subject":[],"published":{"date-parts":[[2018,10,8]]}}}