{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,26]],"date-time":"2026-06-26T05:23:21Z","timestamp":1782451401651,"version":"3.54.5"},"reference-count":55,"publisher":"Emerald","issue":"5","license":[{"start":{"date-parts":[[2014,8,26]],"date-time":"2014-08-26T00:00:00Z","timestamp":1409011200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,8,26]]},"abstract":"<jats:sec>\n               <jats:title content-type=\"abstract-heading\">Purpose<\/jats:title>\n               <jats:p> \u2013 The purpose of this paper is to seek to advance business process redesign (BPR) project research through the generation and testing of a new research model that utilizes formative constructs to model complex BPR project implementation issues. Instead of looking at management principles, the paper examines the activities of improving business processes from the project perspective. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title>\n               <jats:p> \u2013 A survey of 145 managers and executives from medium and large-sized USA and Canadian companies was used to validate the model. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Findings<\/jats:title>\n               <jats:p> \u2013 The model, based on socio-technical theory, includes three implementation components (change management, process redesign, and information and communication technology infrastructure improvement), and links the effects of these components to BPR project outcomes. The empirical findings indicated that all three implementation components had a significant impact on BPR project success, with change management having the greatest effect. Interestingly, the results also showed that productivity improvement was no longer the main focus of companies carrying out BPR projects; instead, improvement in operational and organizational quality was more important. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Research limitations\/implications<\/jats:title>\n               <jats:p> \u2013 The main limitation of this study is its generalizability with respect to company size and organizational culture. The sample in this study was drawn from medium- and large-sized companies in Canada and the USA, but small-sized organizations were excluded from this study due to their distinct features (e.g. superior flexibility or ability to reorient themselves quickly). Also, this study controlled the variable of organizational culture by limiting respondents to Canada and US companies. It would be very interesting to investigate BPR project implementations in other countries where the organizational working culture may be different. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Practical implications<\/jats:title>\n               <jats:p> \u2013 Based on the findings of this study, BPR practitioners can refer to the three BPR project implementation components and then prioritize and sequence the tasks in a BPR project to achieve their preset BPR goals. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title>\n               <jats:p> \u2013 This is the first study which utilizes formative constructs to validate the important BPR project components.<\/jats:p>\n            <\/jats:sec>","DOI":"10.1108\/bpmj-10-2012-0112","type":"journal-article","created":{"date-parts":[[2014,7,31]],"date-time":"2014-07-31T09:58:18Z","timestamp":1406800698000},"page":"773-792","source":"Crossref","is-referenced-by-count":21,"title":["Business process redesign project success: the role of socio-technical theory"],"prefix":"10.1108","volume":"20","author":[{"given":"Junlian","family":"Xiang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Norm","family":"Archer","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Brian","family":"Detlor","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"140","reference":[{"key":"key2020122904174973400_b1","doi-asserted-by":"crossref","unstructured":"Abdolvand, N.\n               , \n                  Albadvi, A.\n                and \n                  Ferdowsi, Z.\n                (2008), \u201cAssessing readiness for business process reengineering\u201d, Business Process Management Journal, Vol. 14 No. 4, pp. 497-511.","DOI":"10.1108\/14637150810888046"},{"key":"key2020122904174973400_b2","doi-asserted-by":"crossref","unstructured":"Aghdasi, M.\n               , \n                  Albadvi, A.\n                and \n                  Ostadi, B.\n                (2010), \u201cDesired organisational capabilities (DOCs): mapping in BPR context\u201d, International Journal of Production Research, Vol. 48 No. 7, pp. 2029-2053.","DOI":"10.1080\/00207540802620761"},{"key":"key2020122904174973400_b3","doi-asserted-by":"crossref","unstructured":"Ahadi, H.R.\n                (2004), \u201cAn examination of the role of organizational enablers in business reengineering and the impact of information technology\u201d, Information Resources Management Journal, Vol. 17 No. 4, pp. 1-19.","DOI":"10.4018\/irmj.2004100101"},{"key":"key2020122904174973400_b4","doi-asserted-by":"crossref","unstructured":"Al-Mashari, M.\n                and \n                  Zairi, M.\n                (1999), \u201cBPR implementation process: an analysis of key success and failure factors\u201d, Business Process Management Journal, Vol. 5 No. 1, pp. 87-112.","DOI":"10.1108\/14637159910249108"},{"key":"key2020122904174973400_b5","doi-asserted-by":"crossref","unstructured":"Altinkemer, K.Y.Z.D.\n                (2011), \u201cProductivity and performance effects of business process reengineering: a firm-level analysis\u201d, Journal of Management Information Systems, Vol. 27 No. 4, pp. 129-162.","DOI":"10.2753\/MIS0742-1222270405"},{"key":"key2020122904174973400_b6","doi-asserted-by":"crossref","unstructured":"Attaran, M.\n                (2003), \u201cInformation technology and business-process redesign\u201d, Business Process Management Journal, Vol. 9 No. 4, pp. 440-458.","DOI":"10.1108\/14637150310484508"},{"key":"key2020122904174973400_b7","doi-asserted-by":"crossref","unstructured":"Bhatt, G.D.\n                (2000), \u201cExploring the relationship between information technology, infrastructure and business process re-engineering\u201d, Business Process Management Journal, Vol. 6 No. 2, pp. 139-163.","DOI":"10.1108\/14637150010324085"},{"key":"key2020122904174973400_b8","doi-asserted-by":"crossref","unstructured":"Bostrom, R.P.\n                and \n                  Heinen, J.S.\n                (1977), \u201cMIS Problems and failures: a socio-technical perspective. Part I: the causes\u201d, MIS Quarterly, Vol. 1 No. 3, pp. 17-32.","DOI":"10.2307\/248710"},{"key":"key2020122904174973400_b9","doi-asserted-by":"crossref","unstructured":"Bradley, J.\n                (2008), \u201cManagement based critical success factors in the implementation of enterprise resource planning systems\u201d, International Journal of Accounting Information Systems, Vol. 9 No. 3, pp. 175-200.","DOI":"10.1016\/j.accinf.2008.04.001"},{"key":"key2020122904174973400_b10","unstructured":"Chin, W.W.\n                (1998), \u201cThe partial least squares approach to structural equation modeling\u201d, in \n                  Marcoulides, G.A.\n                (Ed.), Modern Methods for Business Research, Lawrence Erlbaum, Mahwah, NJ, pp. 295-336."},{"key":"key2020122904174973400_b11","doi-asserted-by":"crossref","unstructured":"Chin, W.W.\n               , \n                  Marcolin, B.L.\n                and \n                  Newsted, P.R.\n                (2003), \u201cA partial least squares latent variable modeling approach for measuring interaction effects: results from a monte carlo simulation study and an electronic-mail emotion\/adoption study\u201d, Information Systems Research, Vol. 14 No. 2, pp. 189-217.","DOI":"10.1287\/isre.14.2.189.16018"},{"key":"key2020122904174973400_b12","unstructured":"Davenport, T.H.\n                (1993), Process Innovation: Reengineering Work Through Information Technology, Harvard Business School Press, Boston, MA."},{"key":"key2020122904174973400_b13","doi-asserted-by":"crossref","unstructured":"Diamantopoulos, A.\n               , \n                  Riefler, P.\n                and \n                  Roth, K.P.\n                (2008), \u201cAdvancing formative measurement models\u201d, Journal of Business Research, Vol. 61 No. 12, pp. 1203-1218.","DOI":"10.1016\/j.jbusres.2008.01.009"},{"key":"key2020122904174973400_b14","doi-asserted-by":"crossref","unstructured":"Everitt, B.S.\n                (1975), \u201cMultivariate analysis: the need for data and other Problems\u201c, The British Journal of Psychiatry, Vol. 126 No. 3, pp. 237-240.","DOI":"10.1192\/bjp.126.3.237"},{"key":"key2020122904174973400_b15","unstructured":"Fenelon, M.J. III.\n                (2002), \u201cSuccess factors for reengineering projects at medium-sized firms\u201d, PhD thesis, University of New Haven, West Haven, Connecticut."},{"key":"key2020122904174973400_b16","doi-asserted-by":"crossref","unstructured":"Fink, L.\n                and \n                  Neumann, S.\n                (2009), \u201cExploring the perceived business value of the flexibility enabled by information technology infrastructure\u201d, Information & Management, Vol. 46 No. 2, pp. 90-99.","DOI":"10.1016\/j.im.2008.11.007"},{"key":"key2020122904174973400_b17","doi-asserted-by":"crossref","unstructured":"Fui-Hoon Nah, F.\n               , \n                  Zuckweiler, K.M.\n                and \n                  Lee-Shang Lau, J.\n                (2003), \u201cERP Implementation: chief information officers\u2019 perceptions of critical success factors\u201d, International Journal of Human-Computer Interaction, Vol. 16 No. 1, pp. 5-22.","DOI":"10.1207\/S15327590IJHC1601_2"},{"key":"key2020122904174973400_b18","doi-asserted-by":"crossref","unstructured":"Gefen, D.\n                and \n                  Straub, D.\n                (2005), \u201cA practical guide to factorial validity using PLS-Graph: tutorial and annoated example\u201d, Communications of AIS, Vol. 16 No. 1, pp. 91-109.","DOI":"10.17705\/1CAIS.01605"},{"key":"key2020122904174973400_b19","doi-asserted-by":"crossref","unstructured":"Grover, V.\n                and \n                  Jeong, S.R.\n                (1995), \u201cThe implementation of business process reengineering\u201d, Journal of Management Information Systems, Vol. 12 No. 1, pp. 109-144.","DOI":"10.1080\/07421222.1995.11518072"},{"key":"key2020122904174973400_b20","doi-asserted-by":"crossref","unstructured":"Grover, V.\n               , \n                  Teng, J.\n               , \n                  Segars, A.H.\n                and \n                  Fiedler, K.\n                (1998), \u201cThe influence of information technology diffusion and business process change on perceived productivity: the IS executive's perspective\u201d, Information & Management, Vol. 34 No. 3, pp. 141-159.","DOI":"10.1016\/S0378-7206(98)00054-8"},{"key":"key2020122904174973400_b21","doi-asserted-by":"crossref","unstructured":"Guha, S.\n                and \n                  Grover, V.\n                (1997), \u201cBusiness process change and organizational performance: exploring an antecedent model\u201d, Journal of Management Information Systems, Vol. 14 No. 1, pp. 119-154.","DOI":"10.1080\/07421222.1997.11518156"},{"key":"key2020122904174973400_b22","doi-asserted-by":"crossref","unstructured":"Hamilton, S.\n                and \n                  Chervany, N.L.\n                (1981), \u201cEvaluating information system effectiveness \u2013 part I: comparing evaluation approaches\u201d, MIS Quarterly, Vol. 5 No. 3, pp. 55-69.","DOI":"10.2307\/249291"},{"key":"key2020122904174973400_b23","doi-asserted-by":"crossref","unstructured":"Hammer, M.\n                and \n                  Champy, J.\n                (1993), Reengineering the Corporation: A Manifesto for Business Revolution, Harper Business Editions, New York, NY.","DOI":"10.1016\/S0007-6813(05)80064-3"},{"key":"key2020122904174973400_b24","doi-asserted-by":"crossref","unstructured":"Herzog, N.V.\n               , \n                  Tonchia, S.\n                and \n                  Polajnar, A.\n                (2009), \u201cLinkages between manufacturing strategy, benchmarking, performance measurement and business process reengineering\u201d, Computers & Industrial Engineering, Vol. 57 No. 3, pp. 963-975.","DOI":"10.1016\/j.cie.2009.03.015"},{"key":"key2020122904174973400_b25","doi-asserted-by":"crossref","unstructured":"Houy, C.\n               , \n                  Fettke, P.\n                and \n                  Loos, P.\n                (2010), \u201cEmpirical research in business process management \u2013 analysis of an emerging field of research\u201d, Business Process Management Journal, Vol. 16 No. 4, pp. 619-661.","DOI":"10.1108\/14637151011065946"},{"key":"key2020122904174973400_b26","doi-asserted-by":"crossref","unstructured":"Hung, R.Y.-Y.\n                (2006), \u201cBusiness process management as competitive advantage: a review and empirical study\u201d, Total Quality Management and Business Excellence, Vol. 17 No. 1, pp. 21-40.","DOI":"10.1080\/14783360500249836"},{"key":"key2020122904174973400_b27","doi-asserted-by":"crossref","unstructured":"Huq, Z.\n               , \n                  Huq, F.\n                and \n                  Cutright, K.\n                (2006), \u201cBPR through ERP: Avoiding change management pitfalls\u201d, Journal of Change Management, Vol. 6 No. 1, pp. 67-85.","DOI":"10.1080\/14697010500523442"},{"key":"key2020122904174973400_b28","doi-asserted-by":"crossref","unstructured":"Ifinedo, P.\n                and \n                  Nahar, N.\n                (2009), \u201cInteractions between contingency, organizational IT factors, and ERP success\u201d, Industrial Management & Data Systems, Vol. 109 No. 1, pp. 118-137.","DOI":"10.1108\/02635570910926627"},{"key":"key2020122904174973400_b29","doi-asserted-by":"crossref","unstructured":"Jan Vom, B.\n                and \n                  Theresa, S.\n                (2011), \u201cCulture in business process management: a literature review\u201d, Business Process Management Journal, Vol. 17 No. 2, pp. 357-378.","DOI":"10.1108\/14637151111122383"},{"key":"key2020122904174973400_b30","doi-asserted-by":"crossref","unstructured":"Jarvenpaa, S.L.\n                and \n                  Stoddard, D.B.\n                (1998), \u201cBusiness process redesign: radical and evolutionary change\u201d, Journal of Business Research, Vol. 41 No. 1, pp. 15-27.","DOI":"10.1016\/S0148-2963(97)00008-8"},{"key":"key2020122904174973400_b31","doi-asserted-by":"crossref","unstructured":"Jarvis, C.B.\n               , \n                  Mackenzie, S.B.\n               , \n                  Podsakoff, P.M.\n               , \n                  Mick, D.G.\n                and \n                  Bearden, W.O.\n                (2003), \u201cA critical review of construct indicators and measurement model misspecification in marketing and consumer research\u201d, Journal of Consumer Research, Vol. 30 No. 2, pp. 199-218.","DOI":"10.1086\/376806"},{"key":"key2020122904174973400_b32","unstructured":"Lashway, L.\n                (2006), \u201cLeadership styles and strategies\u201d, in \n                  Smith, S.C.\n               , \n                  Piele, P.K.\n                and \n                  Murphy, J.\n                (Eds), School Leadership: Handbook for Excellence in Student Learning, Corwin Press, Thousand Oaks, California, pp. 77-103."},{"key":"key2020122904174973400_b33","doi-asserted-by":"crossref","unstructured":"Law, C.C.H.\n                and \n                  Ngai, E.W.T.\n                (2007), \u201cIT Infrastructure capabilities and business process improvements: association with IT governance characteristics\u201d, Information Resources Management Journal, Vol. 20 No. 4, pp. 25-47.","DOI":"10.4018\/irmj.2007100103"},{"key":"key2020122904174973400_b34","doi-asserted-by":"crossref","unstructured":"Little, R.J.A.\n                and \n                  Rubin, D.B.\n                (2002), Statistical Analysis With Missing Data, Wiley, Hoboken, NJ.","DOI":"10.1002\/9781119013563"},{"key":"key2020122904174973400_b35","doi-asserted-by":"crossref","unstructured":"Mansar, S.L.\n                and \n                  Reijers, H.A.\n                (2005), \u201cBest practices in business process redesign: validation of a redesign framework\u201d, Computers in Industry, Vol. 56 No. 5, pp. 457-471.","DOI":"10.1016\/j.compind.2005.01.001"},{"key":"key2020122904174973400_b36","doi-asserted-by":"crossref","unstructured":"Mansar, S.L.\n                and \n                  Reijers, H.A.\n                (2007), \u201cBest practices in business process redesign: use and impact\u201d, Business Process Management Journal, Vol. 13, pp. 193-213.","DOI":"10.1108\/14637150710740455"},{"key":"key2020122904174973400_b37","doi-asserted-by":"crossref","unstructured":"Markus, M.L.\n                (1983), \u201cPower, Politics, and MIS Implementation\u201d, Communications of the ACM, Vol. 26 No. 6, pp. 430-444.","DOI":"10.1145\/358141.358148"},{"key":"key2020122904174973400_b38","doi-asserted-by":"crossref","unstructured":"Martinsons, M.G.\n               , \n                  Davison, R.\n                and \n                  Martinsons, V.\n                (2009), \u201cHow culture influences IT-enabled organizational change and information systems\u201d, Communications of the ACM, Vol. 52 No. 4, pp. 118-123.","DOI":"10.1145\/1498765.1498798"},{"key":"key2020122904174973400_b39","doi-asserted-by":"crossref","unstructured":"Newell, S.\n               , \n                  Swan, J.A.\n                and \n                  Galliers, R.D.\n                (2000), \u201cA knowledge-focused perspective on the diffusion and adoption of complex information technologies: the BPR example\u201d, Information Systems Journal, Vol. 10 No. 3, pp. 239-259.","DOI":"10.1046\/j.1365-2575.2000.00079.x"},{"key":"key2020122904174973400_b40","doi-asserted-by":"crossref","unstructured":"Oakland, J.S.\n                and \n                  Tanner, S.J.\n                (2007), \u201cSuccessful change management\u201d, Total Quality Management and Business Excellence, Vol. 18 Nos 1\/2, pp. 1-19.","DOI":"10.1080\/14783360601042890"},{"key":"key2020122904174973400_b41","doi-asserted-by":"crossref","unstructured":"Ozcelik, Y.\n                (2010), \u201cDo business process reengineering projects payoff? Evidence from the United States\u201d, International Journal of Project Management, Vol. 28 No. 1, pp. 7-13.","DOI":"10.1016\/j.ijproman.2009.03.004"},{"key":"key2020122904174973400_b42","doi-asserted-by":"crossref","unstructured":"Paper, D.\n                and \n                  Chang, R.-D.\n                (2005), \u201cThe state of business process reengineering: a search for success factors\u201d, Total Quality Management, Vol. 16 No. 1, pp. 121-133.","DOI":"10.1080\/1478336042000309907"},{"key":"key2020122904174973400_b43","doi-asserted-by":"crossref","unstructured":"Pavlou, P.A.\n                and \n                  Sawy, O.A.E.\n                (2006), \u201cFrom IT Leveraging competence to competitive advantage in turbulent environments: the case of new product development\u201d, Information Systems Research, Vol. 17 No. 3, pp. 198-227.","DOI":"10.1287\/isre.1060.0094"},{"key":"key2020122904174973400_b44","doi-asserted-by":"crossref","unstructured":"Petter, S.\n               , \n                  Straub, D.\n                and \n                  Rai, A.\n                (2007), \u201cSpecifying formative constructs in information systems research\u201d, MIS Quarterly, Vol. 31 No. 4, pp. 623-656.","DOI":"10.2307\/25148814"},{"key":"key2020122904174973400_b45","doi-asserted-by":"crossref","unstructured":"Ramirez, R.\n               , \n                  Melville, N.\n                and \n                  Lawler, E.\n                (2010), \u201cInformation technology infrastructure, organizational process redesign, and business value: an empirical analysis\u201d, Decision Support Systems, Vol. 49 No. 4, pp. 417-429.","DOI":"10.1016\/j.dss.2010.05.003"},{"key":"key2020122904174973400_b46","unstructured":"Raymond, L.\n               , \n                  Bergeron, F.\n                and \n                  Rivard, S.\n                (1998), \u201cDeterminants of business process reengineering success in small and large enterprises: An\u201d, Journal of Small Business Management, Vol. 36 No. 1, pp. 72-85."},{"key":"key2020122904174973400_b47","unstructured":"Ringle, C.M.\n               , \n                  Wende, S.\n                and \n                  Will, S.\n                (2005), \u201cSmartPLS 2.0 (M3) beta\u201d, Hamburg, available at: www.smartpls.de"},{"key":"key2020122904174973400_b48","unstructured":"Roberts, N.\n                (1984), \u201cTransforming leadership: sources, process, consequences\u201d, Academy of Management Conference, Boston, MA."},{"key":"key2020122904174973400_b49","doi-asserted-by":"crossref","unstructured":"Sarker, S.\n                and \n                  Lee, A.S.\n                (2002), \u201cUsing a positivist case research methodology to test three competing theories-in-use of business process redesign\u201d, Journal of the Association for Information Systems, Vol. 2 No. 1, Article 7.","DOI":"10.17705\/1jais.00019"},{"key":"key2020122904174973400_b50","doi-asserted-by":"crossref","unstructured":"Sarker, S.\n               , \n                  Sarker, S.\n                and \n                  Sidorova, A.\n                (2006), \u201cUnderstanding business process change failure: an actor-network perspective\u201d, Journal of Management Information Systems, Vol. 23 No. 1, pp. 51-86.","DOI":"10.2753\/MIS0742-1222230102"},{"key":"key2020122904174973400_b51","doi-asserted-by":"crossref","unstructured":"Sobol, M.G.\n                and \n                  Klein, G.\n                (2009), \u201cRelation of CIO background, IT infrastructure, and economic performance\u201d, Information & Management, Vol. 46 No. 5, pp. 271-278.","DOI":"10.1016\/j.im.2009.05.001"},{"key":"key2020122904174973400_b52","doi-asserted-by":"crossref","unstructured":"Terziovski, M.\n               , \n                  Fitzpatrick, P.\n                and \n                  O'Neill, P.\n                (2003), \u201cSuccessful predictors of business process reengineering (BPR) in financial services\u201d, International Journal of Production Economics, Vol. 84 No. 1, pp. 35-50.","DOI":"10.1016\/S0925-5273(02)00378-X"},{"key":"key2020122904174973400_b53","doi-asserted-by":"crossref","unstructured":"Young, R.\n                and \n                  Jordan, E.\n                (2008), \u201cTop management support: Mantra or necessity?\u201d, International Journal of Project Management, Vol. 26 No. 7, pp. 713-725.","DOI":"10.1016\/j.ijproman.2008.06.001"},{"key":"key2020122904174973400_b54","doi-asserted-by":"crossref","unstructured":"\u017dabjek, D.\n                and \n                  \u0160temberger, M.I.\n                (2009), \u201cThe influence of business process management and some other CSFs on successful ERP implementation\u201d, Business Process Management Journal, Vol. 15 No. 4, pp. 588-608.","DOI":"10.1108\/14637150910975552"},{"key":"key2020122904174973400_b55","doi-asserted-by":"crossref","unstructured":"Zellner, G.\n                (2011), \u201cA structured evaluation of business process improvement approaches\u201d, Business Process Management Journal, Vol. 17 No. 2, pp. 203-237.","DOI":"10.1108\/14637151111122329"}],"container-title":["Business Process Management Journal"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/BPMJ-10-2012-0112","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/BPMJ-10-2012-0112\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/BPMJ-10-2012-0112\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T23:16:08Z","timestamp":1753398968000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/bpmj\/article\/20\/5\/773-792\/258477"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,8,26]]},"references-count":55,"journal-issue":{"issue":"5","published-print":{"date-parts":[[2014,8,26]]}},"alternative-id":["10.1108\/BPMJ-10-2012-0112"],"URL":"https:\/\/doi.org\/10.1108\/bpmj-10-2012-0112","relation":{},"ISSN":["1463-7154"],"issn-type":[{"value":"1463-7154","type":"print"}],"subject":[],"published":{"date-parts":[[2014,8,26]]}}}