{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,8]],"date-time":"2026-02-08T05:36:45Z","timestamp":1770529005852,"version":"3.49.0"},"reference-count":24,"publisher":"Emerald","issue":"8","license":[{"start":{"date-parts":[[2001,11,1]],"date-time":"2001-11-01T00:00:00Z","timestamp":1004572800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2001,11,1]]},"abstract":"<jats:p>Describes research to identify and pilot an improved planning and fulfilment process at Noramco, a manufacturing division of General Pump. The focus was to develop a synchronized system from source to consumption with continuous flow of information and materials for one of Noramco\u2019s main product lines. System\u2010wide changes were accomplished using a cross\u2010functional team with the goal of reducing waste and investment in inventory. Traditional measures of manufacturing efficiency and utilization were compared with proposed measurements of through\u2010put (T), investment in inventory (I), and operating expense (OE). Although traditional measures showed actual decline, proposed measures showed improvement and increased profitability of 200 per cent for this product line. These new performance measures reflected a change from local to global thinking. Improved capacity management in the system was achieved by sharing information between suppliers and customers.<\/jats:p>","DOI":"10.1108\/eum0000000006172","type":"journal-article","created":{"date-parts":[[2003,1,6]],"date-time":"2003-01-06T22:18:30Z","timestamp":1041891510000},"page":"414-425","source":"Crossref","is-referenced-by-count":7,"title":["Serve your supply chain, not operations \u2013 a case study"],"prefix":"10.1108","volume":"101","author":[{"given":"Sameer","family":"Kumar","sequence":"first","affiliation":[]},{"given":"Charu","family":"Chandra","sequence":"additional","affiliation":[]},{"given":"Mike","family":"Stoerzinger","sequence":"additional","affiliation":[]}],"member":"140","reference":[{"key":"key2022012720013513600_B1","doi-asserted-by":"crossref","unstructured":"Beckett, A, Wainwright, C.E.R. and Bance, D. (2000), \u201cImplementing an industrial continuous improvement system: a knowledge management case study\u201d, Industrial Management & Data Systems,  Vol. 100 No. 7, pp. 330\u20108.","DOI":"10.1108\/02635570010349113"},{"key":"key2022012720013513600_B2","doi-asserted-by":"crossref","unstructured":"Boddy, D. and Macbeth, D. (2000), \u201cPrescriptions for managing change: a survey of their effects in projects to implement collaborative working between organisations\u201d, International Journal of Project Management, Vol. 18 No. 5, October, pp. 297\u2010306.","DOI":"10.1016\/S0263-7863(99)00031-9"},{"key":"key2022012720013513600_B3","unstructured":"Buddress, L. and Raedels, A. (2000), \u201cEssential tools of supply chain management\u201d, Hospital Material Management Quarterly, Vol. 22 No.1, August, pp. 36\u201041."},{"key":"key2022012720013513600_B4","doi-asserted-by":"crossref","unstructured":"Cachon, G.P. and Fisher, M. (2000), \u201cSupply chain inventory management and the value of shared information\u201d, Management Science, Vol. 46 No. 8, August, pp. 1032\u201048.","DOI":"10.1287\/mnsc.46.8.1032.12029"},{"key":"key2022012720013513600_B5","doi-asserted-by":"crossref","unstructured":"Chandra, C. and Kumar, S. (2000), \u201cSupply chain management in theory and practice: a passing fad or a fundamental change?\u201d, Industrial Management & Data Systems, Vol. 100 No. 3, pp. 100\u201014.","DOI":"10.1108\/02635570010286168"},{"key":"key2022012720013513600_B6","unstructured":"Dibono, P. (1997), \u201cFlow manufacturing improves efficiency and customer responsiveness\u201d, IIE Solutions, March, pp. 25\u20107."},{"key":"key2022012720013513600_B7","unstructured":"Fisher, M.L., Hammond, J.H., Obermeyer, W.R. and Raman, A. (1994), \u201cMaking supply meet demand in an uncertain world\u201d, Harvard Business Review, May\u2010June, pp. 83\u201093."},{"key":"key2022012720013513600_B8","unstructured":"Gardiner, S.C., Blackstone, J.H. Jr, Gardiner and Lorrance, R. (1994), \u201cThe evolution of the theory of constraints\u201d, Industrial Management, Vol. 6 No. 3, May\u2010June, pp. 13\u201016."},{"key":"key2022012720013513600_B9","unstructured":"Goldratt, E.M. and Cox, J. (1984), The Goal, North River Press, Great Barrington, MA."},{"key":"key2022012720013513600_B10","doi-asserted-by":"crossref","unstructured":"Lee, H.L and Tang, C.S. (1997), \u201cModelling the costs and benefits of delayed product differentiation\u201d, Management Science, Vol. 43 No. 1, January, pp. 40\u201053.","DOI":"10.1287\/mnsc.43.1.40"},{"key":"key2022012720013513600_B11","doi-asserted-by":"crossref","unstructured":"Lockamy, A., Beal, R.M. and Smith, W.I. (2000), \u201cSupply\u2010chain excellence for accelerated improvement\u201d, Interfaces, Vol. 30 No. 4, July\/August, pp. 22\u201031.","DOI":"10.1287\/inte.30.4.22.11646"},{"key":"key2022012720013513600_B12","doi-asserted-by":"crossref","unstructured":"Luo, W. and Tung, Y.A. (2000), \u201cA framework for selecting business process modeling methods\u201d, Industrial Management & Data Systems, Vol. 99 No. 7, pp. 312\u20109.","DOI":"10.1108\/02635579910262535"},{"key":"key2022012720013513600_B13","unstructured":"Maynard, J. (1996), \u201cAdvanced planning engines break down manufacturing barriers\u201d, Datamation, Vol. 42 No. 11, June 1, pp. 74\u20107."},{"key":"key2022012720013513600_B14","doi-asserted-by":"crossref","unstructured":"McCarthy, S.W. and Barber, K.D. (1990), \u201cMedium to short\u2010term finite capacity scheduling: a planning methodology for capacity constrained workshops\u201d, Engineering Costs and Production Economics, Vol. 19 No. 1\u20103, May, pp. 189\u201099.","DOI":"10.1016\/0167-188X(90)90042-G"},{"key":"key2022012720013513600_B15","unstructured":"Michel, R. (1997), \u201cBest practices make perfect\u201d, Manufacturing Systems, Vol. 15 No. 4, April, pp. 10\u201014."},{"key":"key2022012720013513600_B16","unstructured":"Millard, B. (1998), \u201cJIT vs. MRP: unmasking the great push\u2010pull myth\u201d, APICS \u2013 The Performance Advantage, March, pp. 48\u201051."},{"key":"key2022012720013513600_B17","unstructured":"Narayanan, V.G. and Raman, A. (2000), Aligning Incentives for Supply Chain Efficiency, Harvard Business School, Boston, MA, 9\u2010600\u2010110, April 10."},{"key":"key2022012720013513600_B18","doi-asserted-by":"crossref","unstructured":"Parker, H. (2000), \u201cInterfirm collaboration and the new product development process\u201d, Industrial Management & Data Systems,  Vol. 100 No. 6, pp. 255\u201060.","DOI":"10.1108\/02635570010301179"},{"key":"key2022012720013513600_B19","doi-asserted-by":"crossref","unstructured":"Siriginidi, S.R. (2000), \u201cEnterprise resource planning: business needs and technologies\u201d, Industrial Management & Data Systems, Vol.100 No. 2, pp. 81\u20108.","DOI":"10.1108\/02635570010286078"},{"key":"key2022012720013513600_B20","unstructured":"Slater, M.J. and Hughes\u2010Gordon, P. (1998), \u201cDemand flow assembly\u201d, Assembly Magazine OnLine, http:\/\/www.manufacturingsystems.com  (7\/27\/98)."},{"key":"key2022012720013513600_B21","doi-asserted-by":"crossref","unstructured":"Sterman, J.D. (1989),\u201cModeling managerial behavior: misperceptions of feedback in a dynamic decision\u2010making experiment\u201d, Management Science, Vol. 35 No. 3, pp. 321\u201039.","DOI":"10.1287\/mnsc.35.3.321"},{"key":"key2022012720013513600_B22","unstructured":"Wingate, F. (1996), \u201cThe maturing MES market\u201d, IIE Solutions, Vol. 28 No. 10, October,  pp. 38\u201040."},{"key":"key2022012720013513600_B23","unstructured":"Womack, J.P and Jones, D.T. (1996). Lean Thinking, Simon & Schuster, New York, NY."},{"key":"key2022012720013513600_B24","doi-asserted-by":"crossref","unstructured":"Yeh, C.\u2010H. (2000), \u201cA customer\u2010focused planning approach to make\u2010to\u2010order production\u201d, Industrial Management & Data Systems, Vol.100 No. 4, pp. 180.","DOI":"10.1108\/02635570010328693"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/EUM0000000006172","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/EUM0000000006172\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/EUM0000000006172\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:50:02Z","timestamp":1753404602000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/101\/8\/414-425\/184075"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2001,11,1]]},"references-count":24,"journal-issue":{"issue":"8","published-print":{"date-parts":[[2001,11,1]]}},"alternative-id":["10.1108\/EUM0000000006172"],"URL":"https:\/\/doi.org\/10.1108\/eum0000000006172","relation":{},"ISSN":["0263-5577"],"issn-type":[{"value":"0263-5577","type":"print"}],"subject":[],"published":{"date-parts":[[2001,11,1]]}}}