{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,7,13]],"date-time":"2026-07-13T13:23:21Z","timestamp":1783949001083,"version":"3.55.0"},"reference-count":59,"publisher":"Emerald","issue":"3","license":[{"start":{"date-parts":[[2016,11,7]],"date-time":"2016-11-07T00:00:00Z","timestamp":1478476800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["GS"],"published-print":{"date-parts":[[2016,11,7]]},"abstract":"<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Purpose<\/jats:title>\n<jats:p>The time series forecasting is an essential methodology which can be used for analysing time series data in order to extract meaningful statistics based on the information obtained from past and present. These modelling approaches are particularly complicated when the available resources are limited as well as anomalous. The purpose of this paper is to propose a new hybrid forecasting approach based on unbiased GM(1,1) and artificial neural network (UBGM_BPNN) to forecast time series patterns to predict future behaviours. The empirical investigation was conducted by using daily share prices in Colombo Stock Exchange, Sri Lanka.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Design\/methodology\/approach<\/jats:title>\n<jats:p>The methodology of this study is running under three main phases as follows. In the first phase, traditional grey operational mechanisms, namely, GM(1,1), unbiased GM(1,1) and nonlinear grey Bernoulli model, are used. In the second phase, the new proposed hybrid approach, namely, UBGM_BPNN was implemented successfully for forecasting short-term predictions under high volatility. In the last stage, to pick out the most suitable model for forecasting with a limited number of observations, three model-accuracy standards were employed. They are mean absolute deviation, mean absolute percentage error and root-mean-square error.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Findings<\/jats:title>\n<jats:p>The empirical results disclosed that the UNBG_BPNN model gives the minimum error accuracies in both training and testing stages. Furthermore, results indicated that UNBG_BPNN affords the best simulation result than other selected models.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Practical implications<\/jats:title>\n<jats:p>The authors strongly believe that this study will provide significant contributions to domestic and international policy makers as well as government to open up a new direction to develop investments in the future.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Originality\/value<\/jats:title>\n<jats:p>The new proposed UBGM_BPNN hybrid forecasting methodology is better to handle incomplete, noisy, and uncertain data in both model building and <jats:italic>ex post<\/jats:italic> testing stages.<\/jats:p>\n<\/jats:sec>","DOI":"10.1108\/gs-04-2016-0009","type":"journal-article","created":{"date-parts":[[2016,12,6]],"date-time":"2016-12-06T02:58:38Z","timestamp":1480993118000},"page":"322-340","source":"Crossref","is-referenced-by-count":12,"title":["An unbiased GM(1,1)-based new hybrid approach for time series forecasting"],"prefix":"10.1108","volume":"6","author":[{"given":"R.M. Kapila Tharanga","family":"Rathnayaka","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"D.M.K.N.","family":"Seneviratna","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Wei","family":"Jianguo","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Hasitha Indika","family":"Arumawadu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"140","reference":[{"key":"key2020121121124712700_ref001","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1016\/j.jbi.2015.06.022","article-title":"A comparison of multivariate and univariate time series approaches to modelling and forecasting emergency department demand in Western Australia","volume":"57","year":"2015","journal-title":"Journal of Biomedical Informatics"},{"issue":"1","key":"key2020121121124712700_ref002","first-page":"231","article-title":"A neural network based linear ensemble framework for time series forecasting","volume":"157","year":"2015","journal-title":"Neurocomputing"},{"issue":"2","key":"key2020121121124712700_ref003","first-page":"76","article-title":"A literature review and perspectives in reverse logistics","volume":"97","year":"2015","journal-title":"Resources, Conservation and Recycling"},{"key":"key2020121121124712700_ref004","doi-asserted-by":"crossref","first-page":"980","DOI":"10.1016\/j.neucom.2015.06.092","article-title":"Multilayer neural network with multi-valued neurons in time series forecasting of oil production","volume":"175","year":"2016","journal-title":"Neurocomputing"},{"issue":"1","key":"key2020121121124712700_ref005","first-page":"331","article-title":"A hybrid method based on a new clustering technique and multilayer perceptron neural networks for hourly solar radiation forecasting","volume":"118","year":"2016","journal-title":"Energy Conversion and Management"},{"issue":"1","key":"key2020121121124712700_ref006","first-page":"274","article-title":"Neural networks as a tool of forecasting of socioeconomic systems strategic development","volume":"207","year":"2015","journal-title":"Procedia \u2013 Social and Behavioral Sciences"},{"issue":"1","key":"key2020121121124712700_ref007","first-page":"434","article-title":"Short term electric load forecasting by wavelet transform and grey model improved by PSO (particle swarm optimization) algorithm","volume":"72","year":"2014","journal-title":"Energy"},{"issue":"1","key":"key2020121121124712700_ref008","first-page":"25","article-title":"A decision support system for predictive police patrolling","volume":"75","year":"2015","journal-title":"Decision Support Systems"},{"issue":"1","key":"key2020121121124712700_ref009","first-page":"118","article-title":"Forecasting business cycle with chaotic time series based on neural network with weighted fuzzy membership functions","volume":"90","year":"2016","journal-title":"Chaos, Solitons & Fractals"},{"key":"key2020121121124712700_ref010","doi-asserted-by":"crossref","first-page":"400","DOI":"10.1016\/j.amc.2015.05.006","article-title":"A novel gray forecasting model based on the box plot for small manufacturing data sets","volume":"265","year":"2015","journal-title":"Applied Mathematics and Computation"},{"issue":"12","key":"key2020121121124712700_ref011","doi-asserted-by":"crossref","first-page":"7557","DOI":"10.1016\/j.eswa.2010.04.088","article-title":"Forecasting Taiwan\u2019s major stock indices by the Nash nonlinear grey Bernoulli model","volume":"37","year":"2010","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"key2020121121124712700_ref012","first-page":"220","article-title":"Forecasting tourism demand to Catalonia: neural networks vs time series models","volume":"36","year":"2014","journal-title":"Economic Modelling"},{"issue":"1","key":"key2020121121124712700_ref013","first-page":"284","article-title":"Forecasting diurnal cooling energy load for institutional buildings using artificial neural networks","volume":"121","year":"2015","journal-title":"Energy and Buildings"},{"issue":"18","key":"key2020121121124712700_ref014","doi-asserted-by":"crossref","first-page":"8049","DOI":"10.1016\/j.eswa.2014.06.041","article-title":"Time series forecasting by neural networks: a knee point-based multiobjective evolutionary algorithm approach","volume":"41","year":"2014","journal-title":"Expert Systems with Applications"},{"issue":"8","key":"key2020121121124712700_ref201","doi-asserted-by":"crossref","first-page":"1145","DOI":"10.1007\/s00477-010-0366-3","article-title":"Application of linear stochastic models for drought forecasting in the B\u00fcy\u00fck Menderes river basin, Western Turkey","volume":"24","year":"2010","journal-title":"Stochastic Environmental Research and Risk Assessment"},{"key":"key2020121121124712700_ref015","doi-asserted-by":"crossref","first-page":"1094","DOI":"10.1016\/j.sbspro.2013.12.593","article-title":"Recurrent multiplicative neuron model artificial neural network for non-linear time series forecasting","volume":"109","year":"2014","journal-title":"Procedia \u2013 Social and Behavioral Sciences"},{"key":"key2020121121124712700_ref016","doi-asserted-by":"crossref","first-page":"118","DOI":"10.1016\/j.atmosenv.2015.02.030","article-title":"Artificial neural networks forecasting of PM2.5 pollution using air mass trajectory based geographic model and wavelet transformation","volume":"107","year":"2015","journal-title":"Atmospheric Environment"},{"issue":"1","key":"key2020121121124712700_ref017","first-page":"18","article-title":"A stochastic programming approach for floods emergency logistics","volume":"75","year":"2015","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"issue":"1","key":"key2020121121124712700_ref018","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.eswa.2013.09.006","article-title":"Expert systems and artificial intelligence in the 21st century logistics and supply chain management","volume":"41","year":"2014","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"key2020121121124712700_ref019","first-page":"92","article-title":"Forecasting annual gross electricity demand by artificial neural networks using predicted values of socio-economic indicators and climatic conditions: case of Turkey","volume":"90","year":"2016","journal-title":"Energy Policy"},{"issue":"1","key":"key2020121121124712700_ref020","first-page":"165","article-title":"Forecasting the annual electricity consumption of Turkey using an optimized grey model","volume":"70","year":"2014","journal-title":"Energy"},{"issue":"2","key":"key2020121121124712700_ref021","doi-asserted-by":"crossref","first-page":"3839","DOI":"10.1016\/j.eswa.2008.02.042","article-title":"Comparison of direct and iterative artificial neural network forecast approaches in multi-periodic time series forecasting","volume":"36","year":"2009","journal-title":"Expert Systems with Applications"},{"issue":"6","key":"key2020121121124712700_ref022","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1016\/j.pecs.2013.06.002","article-title":"Solar forecasting methods for renewable energy integration","volume":"39","year":"2013","journal-title":"Progress in Energy and Combustion Science"},{"key":"key2020121121124712700_ref023","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1016\/j.wasman.2015.01.026","article-title":"Forecasting of municipal solid waste quantity in a developing country using multivariate grey models","volume":"39","year":"2015","journal-title":"Waste Management"},{"issue":"3","key":"key2020121121124712700_ref024","first-page":"87","article-title":"Testing the link between inflation and economic growth: evidence from Asia","volume":"4","year":"2013","journal-title":"Modern Economy"},{"issue":"3","key":"key2020121121124712700_ref501","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1108\/20439371111181206","article-title":"Modified unbiased GM(1,1) model","volume":"1","year":"2011","journal-title":"Grey Systems: Theory and Application"},{"key":"key2020121121124712700_ref025","first-page":"149","article-title":"A modified GM(1,1) model and its application in electric load forecasting","year":"2010"},{"key":"key2020121121124712700_ref502","first-page":"399","article-title":"A study on properties of GM(1,1) model and direct GM(1,1) model","year":"2007","journal-title":"Proceeding of 2007 IEEE International Conference on Grey System and Intelligent Services, Nanjing"},{"issue":"2","key":"key2020121121124712700_ref026","first-page":"110","article-title":"Short-term forecasting of high-speed rail demand: a hybrid approach combining ensemble empirical mode decomposition and gray support vector machine with real-world applications in China","volume":"44","year":"2014","journal-title":"Transportation Research Part C"},{"issue":"1","key":"key2020121121124712700_ref027","doi-asserted-by":"crossref","first-page":"773","DOI":"10.1016\/j.eswa.2011.07.072","article-title":"Expert systems with applications short-term power load forecasting using grey correlation contest modeling","volume":"39","year":"2012","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"key2020121121124712700_ref028","first-page":"1","article-title":"Introduction to grey system theory","volume":"1","year":"1989","journal-title":"The Journal of Grey System"},{"issue":"2","key":"key2020121121124712700_ref029","doi-asserted-by":"crossref","first-page":"1784","DOI":"10.1016\/j.eswa.2009.07.064","article-title":"Grey system theory-based models in time series prediction","volume":"37","year":"2010","journal-title":"Expert Systems with Applications"},{"issue":"2","key":"key2020121121124712700_ref030","doi-asserted-by":"crossref","first-page":"2664","DOI":"10.1016\/j.asoc.2010.10.015","article-title":"A novel hybridization of artificial neural networks and ARIMA models for time series forecasting","volume":"11","year":"2011","journal-title":"Applied Soft Computing Journal"},{"issue":"3","key":"key2020121121124712700_ref031","first-page":"66","article-title":"Maximum and minimum stock price forecasting of Brazilian power distribution companies based on artificial neural networks","volume":"35","year":"2015","journal-title":"Applied Soft Computing"},{"issue":"1","key":"key2020121121124712700_ref032","first-page":"268","article-title":"A variational mode decomposition approach for analysis and forecasting of economic and financial time series","volume":"55","year":"2016","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"key2020121121124712700_ref033","doi-asserted-by":"crossref","first-page":"531","DOI":"10.1016\/j.ijepes.2012.06.001","article-title":"Electrical power and energy systems a proposed grey model for short-term electricity price forecasting in competitive power markets","volume":"43","year":"2012","journal-title":"International Journal of Electrical Power and Energy Systems"},{"issue":"6","key":"key2020121121124712700_ref034","doi-asserted-by":"crossref","first-page":"767","DOI":"10.1016\/j.omega.2011.07.007","article-title":"Forecasting short-term electricity consumption using the adaptive grey-based approach \u2013 an Asian case","volume":"40","year":"2012","journal-title":"Omega"},{"key":"key2020121121124712700_ref035","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/j.apenergy.2013.02.002","article-title":"Forecasting models for wind speed using wavelet, wavelet packet, time series and artificial neural networks","volume":"107","year":"2013","journal-title":"Applied Energy"},{"issue":"1","key":"key2020121121124712700_ref036","first-page":"34","article-title":"A novel random fuzzy neural networks for tackling uncertainties of electric load forecasting","volume":"73","year":"2015","journal-title":"International Journal of Electrical Power & Energy Systems"},{"issue":"5","key":"key2020121121124712700_ref037","doi-asserted-by":"crossref","first-page":"547","DOI":"10.1016\/j.autcon.2008.11.007","article-title":"Automated Box-Jenkins forecasting modelling","volume":"18","year":"2009","journal-title":"Automation in Construction"},{"key":"key2020121121124712700_ref038","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/j.renene.2015.10.014","article-title":"Short-term wind speed and power forecasting using an ensemble of mixture density neural networks","volume":"87","year":"2016","journal-title":"Renewable Energy"},{"issue":"1","key":"key2020121121124712700_ref039","first-page":"106","article-title":"Exponent back propagation neural network forecasting for financial cross-correlation relationship","volume":"53","year":"2016","journal-title":"Expert Systems with Applications"},{"issue":"1","key":"key2020121121124712700_ref040","first-page":"132","article-title":"Day-ahead electricity price forecasting via the application of artificial neural network based models","volume":"172","year":"2016","journal-title":"Applied Energy"},{"key":"key2020121121124712700_ref503","doi-asserted-by":"publisher","first-page":"23","DOI":"10.1109\/ICCIS.2008.4670877","article-title":"Theory of grey systems and its application in electric load forecasting","year":"2008","journal-title":"IEEE Conference on Cybernetics and Intelligent Systems"},{"issue":"2","key":"key2020121121124712700_ref041","first-page":"12","article-title":"A comparative analysis of stock price behaviors on the Colombo and Nigeria stock exchanges","volume":"1","year":"2014","journal-title":"Journal of Financial and Quantitative Analysis"},{"issue":"2","key":"key2020121121124712700_ref042","doi-asserted-by":"crossref","first-page":"178","DOI":"10.1108\/GS-04-2015-0014","article-title":"Grey system based novel approach for stock market forecasting","volume":"5","year":"2015","journal-title":"Grey Systems: Theory and Application"},{"key":"key2020121121124712700_ref043","first-page":"126","article-title":"Geometric Brownian motion with Ito\u2019s lemma approach to evaluate market fluctuations: a case study on Colombo Stock Exchange","year":"2014"},{"key":"key2020121121124712700_ref044","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.resourpol.2015.03.004","article-title":"Forecasting the COMEX copper spot price by means of neural networks and ARIMA models","volume":"45","year":"2015","journal-title":"Resources Policy"},{"issue":"2","key":"key2020121121124712700_ref045","doi-asserted-by":"crossref","first-page":"855","DOI":"10.1016\/j.eswa.2014.08.018","article-title":"Back propagation neural network with adaptive differential evolution algorithm for time series forecasting","volume":"42","year":"2015","journal-title":"Expert Systems with Applications"},{"key":"key2020121121124712700_ref046","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1016\/j.renene.2016.03.103","article-title":"Wind speed forecasting based on the hybrid ensemble empirical mode decomposition and GA-BP neural network method","volume":"94","year":"2016","journal-title":"Renewable Energy"},{"key":"key2020121121124712700_ref047","doi-asserted-by":"crossref","first-page":"334","DOI":"10.1016\/j.energy.2013.10.054","article-title":"A grey-forecasting interval-parameter mixed-integer programming approach for integrated electric-environmental management e a case study of Beijing","volume":"63","year":"2013","journal-title":"Energy"},{"key":"key2020121121124712700_ref048","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/j.engappai.2013.12.005","article-title":"Grey system theory based prediction for topic trend on internet","volume":"29","year":"2014","journal-title":"Engineering Applications of Artificial Intelligence"},{"issue":"3","key":"key2020121121124712700_ref049","doi-asserted-by":"crossref","first-page":"780","DOI":"10.1016\/j.cie.2012.12.010","article-title":"Computers & industrial engineering an optimized Nash nonlinear grey Bernoulli model for forecasting the main economic indices of high technology enterprises in China","volume":"64","year":"2013","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"key2020121121124712700_ref202","article-title":"A logical calculus of the ideas immanent in nervous activity","volume":"5","year":"1943","journal-title":"Bulletin of Mathematical Biophysics"},{"issue":"2","key":"key2020121121124712700_ref050","doi-asserted-by":"crossref","first-page":"149","DOI":"10.1016\/0925-2312(95)00021-6","article-title":"Time series forecasting by combining RBF networks, certainty factors, and the Box-Jenkins model","volume":"10","year":"1996","journal-title":"Neurocomputing"},{"issue":"11","key":"key2020121121124712700_ref051","first-page":"13961","article-title":"Improvement of grey models by least squares","volume":"38","year":"2011","journal-title":"Expert Systems with Applications"},{"key":"key2020121121124712700_ref052","doi-asserted-by":"crossref","first-page":"159","DOI":"10.1016\/S0925-2312(01)00702-0","article-title":"Time series forecasting using a hybrid ARIMA and neural network model","volume":"50","year":"2003","journal-title":"Neurocomputing"},{"issue":"S","key":"key2020121121124712700_ref053","first-page":"1441","article-title":"A novel nonlinear grey Bernoulli forecast model NGBM(1,1) of underground pressure for working surface","volume":"16","year":"2011","journal-title":"Electronic Journal of Geotechnical Engineering"},{"issue":"9","key":"key2020121121124712700_ref054","doi-asserted-by":"crossref","first-page":"6234","DOI":"10.1016\/j.apm.2013.01.002","article-title":"Generalized GM (1,1) model and its application in forecasting of fuel production","volume":"37","year":"2013","journal-title":"Applied Mathematical Modelling"}],"container-title":["Grey Systems: Theory and Application"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/GS-04-2016-0009","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/GS-04-2016-0009\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/GS-04-2016-0009\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:45:42Z","timestamp":1753404342000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/gs\/article\/6\/3\/322-340\/88531"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,11,7]]},"references-count":59,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,11,7]]}},"alternative-id":["10.1108\/GS-04-2016-0009"],"URL":"https:\/\/doi.org\/10.1108\/gs-04-2016-0009","relation":{},"ISSN":["2043-9377"],"issn-type":[{"value":"2043-9377","type":"print"}],"subject":[],"published":{"date-parts":[[2016,11,7]]}}}