{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,6]],"date-time":"2025-11-06T12:13:36Z","timestamp":1762431216418,"version":"3.41.2"},"reference-count":45,"publisher":"Emerald","issue":"1","license":[{"start":{"date-parts":[[2017,2,6]],"date-time":"2017-02-06T00:00:00Z","timestamp":1486339200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["GS"],"published-print":{"date-parts":[[2017,2,6]]},"abstract":"<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Purpose<\/jats:title>\n<jats:p>The purpose of this paper is to illustrate an uncertain programming model for scheduling of preventive maintenance (PM) actions. The PM scheduling, in which PM actions are performed under fixed intervals, is solved by grey systems theory.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Design\/methodology\/approach<\/jats:title>\n<jats:p>The paper applied the grey evaluation method based on triangular whitenization weight functions which includes two classes: endpoint evaluation method and center-point evaluation method.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Findings<\/jats:title>\n<jats:p>Two methods give the same results based on endpoint and center-point triangular whitenization weight functions. For validation, the results were compared by Cassady\u2019s method.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Originality\/value<\/jats:title>\n<jats:p>The scheduling of PM is crucial in reliability and maintenance engineering. Hundreds of parts compose complex machines that require replacement and\/or repairing. It is helpful to reduce the outage loss on frequent repair\/replacement parts and avoid lack of maintenance of the equipment by controlling the equipment maintenance frequency.<\/jats:p>\n<\/jats:sec>","DOI":"10.1108\/gs-07-2016-0015","type":"journal-article","created":{"date-parts":[[2017,1,12]],"date-time":"2017-01-12T03:18:09Z","timestamp":1484191089000},"page":"111-122","source":"Crossref","is-referenced-by-count":7,"title":["An uncertain programming model for preventive maintenance scheduling"],"prefix":"10.1108","volume":"7","author":[{"given":"Hamed","family":"Maleki","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yingjie","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","reference":[{"issue":"1","key":"key2020120919441093100_ref001","doi-asserted-by":"crossref","first-page":"135","DOI":"10.1016\/j.cie.2012.02.002","article-title":"An overview of time-based and condition-based maintenance in industrial application","volume":"63","year":"2012","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"key2020120919441093100_ref002","doi-asserted-by":"crossref","first-page":"276","DOI":"10.1108\/13552510710780294","article-title":"Preventive maintenance scheduling for multi-cogeneration plants with production constraints","volume":"13","year":"2007","journal-title":"Journal of Quality in Maintenance Engineering"},{"issue":"2","key":"key2020120919441093100_ref003","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1007\/s10589-006-6449-x","article-title":"Optimizing preventive maintenance models","volume":"35","year":"2006","journal-title":"Computational Optimization and Application"},{"issue":"2","key":"key2020120919441093100_ref004","doi-asserted-by":"crossref","first-page":"304","DOI":"10.1109\/TR.2005.845967","article-title":"Integrating preventive maintenance planning and production scheduling for a single machine","volume":"54","year":"2005","journal-title":"IEEE Transactions on Reliability"},{"issue":"5","key":"key2020120919441093100_ref005","first-page":"385","article-title":"A stochastic programming model for scheduling maintenance personnel","volume":"25","year":"1999","journal-title":"Applied Mathematical Modelling"},{"issue":"1","key":"key2020120919441093100_ref006","first-page":"1","article-title":"Multi-objective modeling for preventive maintenance scheduling in a multiple production line","volume":"26","year":"2013","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"4","key":"key2020120919441093100_ref007","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1080\/07408170500232545","article-title":"Age-based hybrid model for imperfect preventive maintenance","volume":"38","year":"2006","journal-title":"IIE Transactions"},{"issue":"2","key":"key2020120919441093100_ref008","doi-asserted-by":"crossref","first-page":"344","DOI":"10.1016\/j.ijpe.2011.12.021","article-title":"Integrating noncyclical preventive maintenance scheduling and production planning for a single machine","volume":"136","year":"2012","journal-title":"International Journal of Production Economics"},{"key":"key2020120919441093100_ref009","doi-asserted-by":"crossref","first-page":"175","DOI":"10.1016\/j.ress.2013.07.009","article-title":"Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems","volume":"121","year":"2014","journal-title":"Reliability Engineering & System Safety"},{"key":"key2020120919441093100_ref010","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1016\/j.ress.2015.03.032","article-title":"An optimal dynamic interval preventive maintenance scheduling for series systems","volume":"142","year":"2015","journal-title":"Reliability Engineering and System Safety"},{"issue":"1","key":"key2020120919441093100_ref011","first-page":"59","article-title":"Efficient optimization algorithm for preventive-maintenance in transmission systems","volume":"1","year":"2010","journal-title":"Journal of Modeling, Simulation, and Scientific"},{"issue":"1","key":"key2020120919441093100_ref012","doi-asserted-by":"crossref","first-page":"103","DOI":"10.1016\/S0951-8320(03)00085-1","article-title":"Surveillance test policy optimization through genetic algorithms using non-periodic intervention frequencies and considering seasonal constraints","volume":"81","year":"2003","journal-title":"Reliability Engineering and System Safety"},{"issue":"2","key":"key2020120919441093100_ref013","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.ress.2005.01.004","article-title":"A model for preventive maintenance planning by genetic algorithms based in cost and reliability","volume":"91","year":"2006","journal-title":"Reliability Engineering and System Safety"},{"issue":"2","key":"key2020120919441093100_ref014","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1002\/(SICI)1099-1638(200003\/04)16:2<157::AID-QRE311>3.0.CO;2-J","article-title":"Short communication optimal replacement scheduling in multi-state series-parallel systems","volume":"16","year":"2000","journal-title":"Quality and Reliability Engineering International"},{"key":"key2020120919441093100_ref015","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1016\/j.procs.2015.07.275","article-title":"Managing vagueness with fuzzy in hierarchical Big Data","volume":"53","year":"2015","journal-title":"Procedia Computer Science"},{"issue":"6","key":"key2020120919441093100_ref016","doi-asserted-by":"crossref","first-page":"875","DOI":"10.1007\/s10845-009-0264-z","article-title":"Preventive maintenance scheduling for repairable system with deterioration","volume":"21","year":"2010","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"key2020120919441093100_ref017","doi-asserted-by":"crossref","first-page":"111","DOI":"10.1142\/S0217595907001139","article-title":"Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances","volume":"24","year":"2007","journal-title":"Asia Pacific Journal of Operational Research"},{"issue":"9","key":"key2020120919441093100_ref018","first-page":"667","article-title":"A new approach to minimize non-periodic preventive maintenance cost using importance measures of components","volume":"69","year":"2010","journal-title":"Journal of Scientific and Industrial Research"},{"issue":"4","key":"key2020120919441093100_ref019","doi-asserted-by":"crossref","first-page":"1225","DOI":"10.1007\/s10845-010-0406-3","article-title":"A hybrid genetic algorithm to minimize the periodic preventive maintenance cost in a series-parallel system","volume":"23","year":"2012","journal-title":"Journal of Intelligent Manufacturing"},{"volume-title":"Grey Systems: Theory and Applications","year":"2010","key":"key2020120919441093100_ref020"},{"key":"key2020120919441093100_ref021","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1016\/j.cie.2014.12.017","article-title":"Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty","volume":"80","year":"2015","journal-title":"Computers & Industrial Engineering"},{"issue":"1","key":"key2020120919441093100_ref022","doi-asserted-by":"crossref","first-page":"33","DOI":"10.1016\/j.ipl.2014.08.011","article-title":"Scheduling a variable maintenance and linear deteriorating jobs on a single machine","volume":"115","year":"2015","journal-title":"Information Processing Letters"},{"issue":"2","key":"key2020120919441093100_ref023","doi-asserted-by":"crossref","first-page":"297","DOI":"10.1108\/JMTM-09-2013-0124","article-title":"Evaluation of scheduling using triangular whitenization functions","volume":"26","year":"2015","journal-title":"Journal of Manufacturing Technology Management"},{"key":"key2020120919441093100_ref024","doi-asserted-by":"crossref","first-page":"561","DOI":"10.1016\/j.cie.2015.06.006","article-title":"The scheduling of maintenance. A resource-constraints mixed integer linear programming model","volume":"87","year":"2015","journal-title":"Computers & Industrial Engineering"},{"issue":"3","key":"key2020120919441093100_ref025","doi-asserted-by":"crossref","first-page":"281","DOI":"10.1016\/S0951-8320(02)00061-3","article-title":"Comparing effectiveness and efficiency in technical specifications and maintenance optimization","volume":"77","year":"2002","journal-title":"Reliability Engineering and System Safety"},{"year":"2016","article-title":"On the joint optimization of the periodic preventive maintenance and the spare parts inventory problem","key":"key2020120919441093100_ref026"},{"issue":"4","key":"key2020120919441093100_ref027","doi-asserted-by":"crossref","first-page":"654","DOI":"10.1016\/j.cie.2010.12.021","article-title":"Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming","volume":"60","year":"2011","journal-title":"Computers & Industrial Engineering"},{"issue":"4","key":"key2020120919441093100_ref028","first-page":"536","article-title":"Periodic and sequential preventive maintenance policies","volume":"26","year":"1986","journal-title":"Journal of Applied Probability"},{"issue":"7","key":"key2020120919441093100_ref029","doi-asserted-by":"crossref","first-page":"847","DOI":"10.1108\/02656710610679842","article-title":"An approach for evaluating preventive maintenance scheduling cost","volume":"23","year":"2006","journal-title":"International Journal of Quality & Reliability Management"},{"issue":"1","key":"key2020120919441093100_ref030","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1016\/S0925-5273(00)00013-X","article-title":"Determining economical maintenance intervals","volume":"67","year":"2000","journal-title":"International Journal of Production Economics"},{"issue":"4","key":"key2020120919441093100_ref031","doi-asserted-by":"crossref","first-page":"523","DOI":"10.1007\/s10845-009-0313-7","article-title":"Periodic and sequential preventive maintenance policies over a finite planning horizon with a dynamic failure law","volume":"22","year":"2011","journal-title":"Journal of Intelligent Manufacturing"},{"volume-title":"Industrial Maintenance Planning and Control","year":"2010","key":"key2020120919441093100_ref032"},{"issue":"2","key":"key2020120919441093100_ref033","doi-asserted-by":"crossref","first-page":"332","DOI":"10.1109\/TR.2007.896747","article-title":"A computational model for determining the optimal preventive maintenance policy with random breakdowns and imperfect repairs","volume":"56","year":"2007","journal-title":"IEEE Transactions on Reliability"},{"issue":"8","key":"key2020120919441093100_ref034","doi-asserted-by":"crossref","first-page":"769","DOI":"10.1080\/09537280600834452","article-title":"Optimal maintenance intervals for a multi-component system","volume":"17","year":"2006","journal-title":"Production Planning and Control"},{"issue":"2","key":"key2020120919441093100_ref035","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1016\/j.ejor.2016.01.014","article-title":"Nested general variable neighborhood search for the periodic maintenance problem","volume":"252","year":"2016","journal-title":"European Journal of Operational Research"},{"issue":"3","key":"key2020120919441093100_ref036","doi-asserted-by":"crossref","first-page":"535","DOI":"10.1080\/02522667.2005.10699664","article-title":"Using grey theory to develop a model for forecasting the demand for telecommunications","volume":"26","year":"2005","journal-title":"Journal of Information and Optimization Sciences"},{"issue":"3","key":"key2020120919441093100_ref037","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1016\/j.ress.2003.11.011","article-title":"A study of availability-centered preventive maintenance for multi-component systems","volume":"84","year":"2004","journal-title":"Reliability Engineering and System Safety"},{"issue":"7","key":"key2020120919441093100_ref038","doi-asserted-by":"crossref","first-page":"8963","DOI":"10.1016\/j.eswa.2011.01.113","article-title":"Improved particle swarm optimization to minimize periodic preventive maintenance cost for series-parallel systems","volume":"38","year":"2011","journal-title":"Expert Systems with Applications"},{"issue":"3","key":"key2020120919441093100_ref039","first-page":"1","article-title":"Optimizing bi-objective imperfect preventive maintenance model for series-parallel system using established hybrid genetic algorithm","volume":"25","year":"2012","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"3","key":"key2020120919441093100_ref040","doi-asserted-by":"crossref","first-page":"469","DOI":"10.1016\/S0377-2217(01)00197-7","article-title":"A survey of maintenance policies of deteriorating systems","volume":"139","year":"2002","journal-title":"The European Journal of Operational Research"},{"issue":"8","key":"key2020120919441093100_ref041","doi-asserted-by":"crossref","first-page":"7247","DOI":"10.1016\/j.eswa.2012.01.052","article-title":"Applying hierarchical grey relation clustering analysis to geographical information systems \u2013 a case study of the hospitals in Taipei city","volume":"39","year":"2012","journal-title":"Expert Systems with Application"},{"key":"key2020120919441093100_ref042","doi-asserted-by":"crossref","first-page":"26","DOI":"10.1016\/j.cie.2016.03.024","article-title":"Minimizing tardiness and maintenance costs in flow shop scheduling by a lower-bound-based GA","volume":"97","year":"2016","journal-title":"Computers & Industrial Engineering"},{"key":"key2020120919441093100_ref043","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1016\/j.ssci.2015.11.013","article-title":"Fuzzy and grey theories in failure mode and effect analysis for tanker equipment failure prediction","volume":"83","year":"2016","journal-title":"Safety Science"},{"issue":"1","key":"key2020120919441093100_ref044","doi-asserted-by":"crossref","first-page":"66","DOI":"10.1080\/07408170701283198","article-title":"Robustness and stability measures forscheduling single-machine environment","volume":"40","year":"2008","journal-title":"IIE Transactions"},{"issue":"2","key":"key2020120919441093100_ref045","first-page":"5","article-title":"Introduction to case study","volume":"3","year":"1997","journal-title":"The Qualitative Report"}],"container-title":["Grey Systems: Theory and Application"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/GS-07-2016-0015\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/GS-07-2016-0015\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,25]],"date-time":"2025-07-25T00:45:57Z","timestamp":1753404357000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/gs\/article\/7\/1\/111-122\/204836"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017,2,6]]},"references-count":45,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2017,2,6]]}},"alternative-id":["10.1108\/GS-07-2016-0015"],"URL":"https:\/\/doi.org\/10.1108\/gs-07-2016-0015","relation":{},"ISSN":["2043-9377"],"issn-type":[{"type":"print","value":"2043-9377"}],"subject":[],"published":{"date-parts":[[2017,2,6]]}}}