{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,29]],"date-time":"2026-05-29T15:29:30Z","timestamp":1780068570119,"version":"3.54.0"},"reference-count":45,"publisher":"Emerald","issue":"6","license":[{"start":{"date-parts":[[2015,7,13]],"date-time":"2015-07-13T00:00:00Z","timestamp":1436745600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,7,13]]},"abstract":"<jats:sec>\n               <jats:title content-type=\"abstract-heading\">Purpose<\/jats:title>\n               <jats:p> \u2013 Excavator productivity calculations embrace myriad variables, which in turn, can be modelled in several ways. A key productivity variable is operator competence (<jats:italic>O<\/jats:italic>\n                  <jats:sub>\n                     <jats:italic>c<\/jats:italic>\n                  <\/jats:sub>) because this can impact on so many of the other variables. Earlier research has studied excavator productivity, but little has attempted to simultaneously model productivity variables in relation to <jats:italic>O<\/jats:italic>\n                  <jats:sub>\n                     <jats:italic>c<\/jats:italic>\n                  <\/jats:sub>. The purpose of this paper is to address the void in extant literature. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title>\n               <jats:p> \u2013 A numeric, theoretical analysis is undertaken using the Caterpillar\u00ae hydraulic excavator productivity model to estimate excavator production, given: first, variance in modifying factors based on derived maximum and minimum values; and second, variance resulting from linear calculations based on excavator operator competence. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Findings<\/jats:title>\n               <jats:p> \u2013 Excavator productivity resulting from incremental variance of modifying factors in isolation is shown to be linear except, in the case of bucket payload. Simultaneous application of modifying variables results in a greater, curvilinear productivity trend; while it is demonstrated that quantification of key modifying factors can to a significant extent be related to operator competence. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Research limitations\/implications<\/jats:title>\n               <jats:p> \u2013 Findings add to productivity literature generally and to that of plant and equipment more specifically. Results will help productivity estimation of excavation in a practical sense while informing subsequent design of an empirical academic research of this problem. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title>\n               <jats:p> \u2013 Originality relates principally to determining modifying factor ranges and their analysis of simultaneous effect on each other, especially, as influenced on assumptions of operator competence.<\/jats:p>\n            <\/jats:sec>","DOI":"10.1108\/ijppm-02-2014-0026","type":"journal-article","created":{"date-parts":[[2015,7,3]],"date-time":"2015-07-03T08:48:49Z","timestamp":1435913329000},"page":"853-869","source":"Crossref","is-referenced-by-count":24,"title":["Analysis of interrelationships among excavator productivity modifying factors"],"prefix":"10.1108","volume":"64","author":[{"given":"Gary D.","family":"Holt","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"David","family":"Edwards","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"140","reference":[{"key":"key2020122301424974900_b1","doi-asserted-by":"crossref","unstructured":"An, S.H.\n               , \n                  Kim, G.H.\n                and \n                  Kang, K.\n                (2007), \u201cA case-based reasoning cost estimating model using experience by analytic hierarchy process\u201d, \n                  Building and Environment\n               , Vol. 42 No. 7, pp. 257-2579.","DOI":"10.1016\/j.buildenv.2006.06.007"},{"key":"key2020122301424974900_b2","doi-asserted-by":"crossref","unstructured":"Bernold, L.E.\n                (2007), \u201cQuantitative assessment of Backhoe operator skill\u201d,\n                  Journal of Construction Engineering and Management\n               , Vol. 133 No. 11, pp. 880-899.","DOI":"10.1061\/(ASCE)0733-9364(2007)133:11(889)"},{"key":"key2020122301424974900_b3","unstructured":"BS EN 474-1\n                (2006), \n                  British Standard BS EN 474-1:2006+A1:2009. Earth-Moving Machinery \u2013 Safety \u2013 Part 1 General Requirements\n               , British Standards Institution, London."},{"key":"key2020122301424974900_b4","unstructured":"BS EN 474-5\n                (2006), \n                  British Standard BS EN 474-5:2006+A1:2009. Earth-Moving Machinery \u2013 Safety \u2013 Part 5: Requirements for Hydraulic Excavators\n               , British Standards Institution, London."},{"key":"key2020122301424974900_b5","unstructured":"BSI ISO 7135\n                (2009), \n                  Earth-Moving Machinery \u2013 Hydraulic Excavators \u2013 Terminology and Commercial Specifications\n               , British Standards Institution, London."},{"key":"key2020122301424974900_b6","unstructured":"Buchan, R.D.\n               , \n                  Fleming, F.W.E.\n                and \n                  Grant, F.E.K.\n                (2006), \n                  Estimating for Builders and Surveyors\n               , 2nd ed., Butterworth Heinemann, Oxford."},{"key":"key2020122301424974900_b7","doi-asserted-by":"crossref","unstructured":"Cabahug, R.J.\n                and \n                  Edwards, D.J.\n                (2002), \u201cMaintenance skills training of UK construction volant operatices: a pilot survey\u201d, \n                  Structural Survey\n               , Vol. 20 No. 1, pp. 22-30.","DOI":"10.1108\/02630800210426231"},{"key":"key2020122301424974900_b8","unstructured":"Cabahug, R.R.\n               , \n                  Golding, P.\n               , \n                  Edwards, D.J.\n                and \n                  Nicholas, J.\n                (2002), \u201cCognitive \u2018visual\u2019 processing and manual dexterity: the influence of eye-to-hand coordination on a plant operator\u2019s aptitude\u201d, in \n                  Greenwood, D.\n                (Ed.), \n                  Proceedings of The 18th Annual ARCOM Conference, 2-4 September 2002, University of Northumbria, Vol. 2, The Association of Researchers in Construction Management, Newcastle-upon-Tyne\n               , pp. 451-459."},{"key":"key2020122301424974900_b10","unstructured":"CAT\n                (2011), \n                  Caterpillar Performance Handbook 41\n               , The Caterpillar Inc., Peoria, IL."},{"key":"key2020122301424974900_b11","unstructured":"CAT\n                (2012), \u201cCat\u00ae buckets 311-390 hydraulic excavators\u201d, available at: www.catallday.com\/downloads\/GEHQ0201-08%20-%20HEX%20Buckets%20Specalog.pdf (accessed January 2014)."},{"key":"key2020122301424974900_b12","unstructured":"CWS Industries\n                (2013), \u201cExcavator mat grapple\u201d, available at: www.cwsindustries.com\/downloads\/CWS-Broch-Mat-Grapple.pdf (accessed January 2014)."},{"key":"key2020122301424974900_b13","unstructured":"Edwards, D.J.\n                and \n                  Griffiths, I.J.\n                (2000), \u201cAn artificial intelligent approach to calculating hydraulic excavator cycle time and productivity output\u201d, \n                  Transactions of the Institute of Mining and Metallurgy\n               , Vol. 109 No. 1, pp. A23-A29."},{"key":"key2020122301424974900_b15","doi-asserted-by":"crossref","unstructured":"Edwards, D.J.\n                and \n                  Holt, G.D.\n                (2000a), \u201cESTIVATE: a methodology for calculating hydraulic excavator productivity and output costs\u201d, \n                  Engineering, Construction and Architectural Management\n               , Vol. 7 No. 1, pp. 52-62.","DOI":"10.1108\/eb021132"},{"key":"key2020122301424974900_b14","unstructured":"Edwards, D.J.\n                and \n                  Holt, G.D.\n                (2000b), \u201cQuantifying the cost of plant operators\u2019 productivity\u201d, \n                  The Journal of Financial Management of Property and Construction\n               , Vol. 5 Nos 1\/2, pp. 85-92."},{"key":"key2020122301424974900_b16","doi-asserted-by":"crossref","unstructured":"Edwards, D.J.\n                and \n                  Holt, G.D.\n                (2009), \u201cConstruction plant and equipment management research: thematic review\u201d, \n                  Journal of Engineering and Design Technology\n               , Vol. 7 No. 2, pp. 186-206.","DOI":"10.1108\/17260530910974989"},{"key":"key2020122301424974900_b17","doi-asserted-by":"crossref","unstructured":"Edwards, D.J.\n                and \n                  Holt, G.D.\n                (2011), \u201cMini-excavator safety: toward innovative stability testing, procurement, and manufacture\u201d, \n                  Journal of Construction Engineering and Management\n               , Vol. 137 No. 12, pp. 1125-1133.","DOI":"10.1061\/(ASCE)CO.1943-7862.0000383"},{"key":"key2020122301424974900_b18","doi-asserted-by":"crossref","unstructured":"Edwards, D.J.\n               , \n                  Holt, G.D.\n                and \n                  Robinson, B.\n                (2002), \u201cAn artificial intelligence approach for improving plant operator maintenance proficiency\u201d, \n                  The Journal of Quality in Maintenance Engineering\n               , Vol. 8 No. 3, pp. 239-252.","DOI":"10.1108\/13552510210439810"},{"key":"key2020122301424974900_b19","doi-asserted-by":"crossref","unstructured":"Edwards, D.J.\n               , \n                  Yang, J.\n                and \n                  Cabahug, R.\n                (2005), \u201cIntelligence and maintenance proficiency: an examination of plant operators\u201d, \n                  Construction Innovation\n               , Vol. 5 No. 4, pp. 243-254.","DOI":"10.1108\/14714170510815285"},{"key":"key2020122301424974900_b20","doi-asserted-by":"crossref","unstructured":"Edwards, D.J.\n               , \n                  Yang, J.\n               , \n                  Wright, B.C.\n                and \n                  Love, P.E.D.\n                (2007), \u201cEstablishing the link between plant operator performance and personal motivation\u201d, \n                  Journal of Engineering, Design and Technology\n               , Vol. 5 No. 2, pp. 173-187.","DOI":"10.1108\/17260530710833211"},{"key":"key2020122301424974900_b21","doi-asserted-by":"crossref","unstructured":"Filipsson, S.\n                and \n                  Eriksson, L.O.\n                (1989), \u201cA model for predicting productivity in subgrade preparation of forest roads by excavator\u201d, \n                  International Journal of Forest Engineering\n               , Vol. 1 No. 1, pp. 3-8, available at: http:\/\/journals.hil.unb.ca\/index.php\/IJFE\/article\/viewArticle\/10086 (accessed January 2014).","DOI":"10.1080\/08435243.1989.10702609"},{"key":"key2020122301424974900_b22","doi-asserted-by":"crossref","unstructured":"Goulielmos, A.\n                and \n                  Tzannatos, E.\n                (1997), \u201cThe man-machine interface and its impact on shipping safety\u201d, \n                  Disaster Prevention and Management\n               , Vol. 6 No. 2, pp. 107-117.","DOI":"10.1108\/09653569710164062"},{"key":"key2020122301424974900_b23","unstructured":"Graham, L.D.\n                and \n                  Smith, S.D.\n                (2004), \u201cA method for effectively implementing construction process productivity estimation models\u201d, available at: www.arcom.ac.uk\/-docs\/proceedings\/ar2004-1043-1052_Graham_and_Smith.pdf (accessed August 2014)."},{"key":"key2020122301424974900_b24","doi-asserted-by":"crossref","unstructured":"Ha, Q.P.\n               , \n                  Nguyen, Q.H.\n               , \n                  Rye, D.C.\n                and \n                  Durrant-Whyte, H.F.\n                (2000), \u201cImpedance control of a hydraulically actuated robotic excavator\u201d, \n                  Automation in Construction\n               , Vol. 9 Nos 5\/6, pp. 421-435.","DOI":"10.1016\/S0926-5805(00)00056-X"},{"key":"key2020122301424974900_b25","unstructured":"Harris, F.C.\n                and \n                  McCaffer, R.\n                (2013), \n                  Modern Construction Management\n               , 7th ed., Wiley-Blackwell, Oxford."},{"key":"key2020122301424974900_b26","doi-asserted-by":"crossref","unstructured":"Hogg, G.\n               , \n                  Pulkkia, R.\n                and \n                  Ackerman, P.\n                (2011), \u201cExcavator-based processor operator productivity and cost analysis in Zululand, South Africa\u201d, \n                  Southern Forests: A Journal of Forest Science\n               , Vol. 73 No. 2, pp. 109-115.","DOI":"10.2989\/20702620.2011.610874"},{"key":"key2020122301424974900_b27","doi-asserted-by":"crossref","unstructured":"Hola, B.\n                and \n                  Schabowciz, K.\n                (2010), \u201cEstimation of earthworks execution time and cost by means of artificial neural networks\u201d, \n                  Automation in Construction\n               , Vol. 19 No. 5, pp. 570-579.","DOI":"10.1016\/j.autcon.2010.02.004"},{"key":"key2020122301424974900_b28","unstructured":"Hollender, M.\n                (2009), \n                  Collaborative Process Automation Systems\n               , The International Society for Automation, Durham, NC."},{"key":"key2020122301424974900_b29","unstructured":"HSE\n                (2014), \u201cTraining and competence. The health and safety executive\u201d, available at: www.hse.gov.uk\/work-equipment-machinery\/training-competence.htmn (accessed January 2014)."},{"key":"key2020122301424974900_b30","unstructured":"Komatsu\n                (2009), \n                  Specifications & Application Handbook Edition 30\n               , Komatsu, Tokyo, available at: www.directminingservices.com\/wp-content\/uploads\/2011\/05\/Edition30.pdf (accessed January 2014)."},{"key":"key2020122301424974900_b31","doi-asserted-by":"crossref","unstructured":"LeBlond, D.\n               , \n                  Owen, F.\n               , \n                  Gibson, G.E.\n               , \n                  Haas, C.T.\n                and \n                  Traver, A.E.\n                (1998), \u201cControl improvement for advanced construction equipment\u201d, \n                  Journal of Construction Engineering and Management\n               , Vol. 124 No. 4, pp. 289-296.","DOI":"10.1061\/(ASCE)0733-9364(1998)124:4(289)"},{"key":"key2020122301424974900_b32","doi-asserted-by":"crossref","unstructured":"Lee, J.\n               , \n                  Loernc, S.J.\n                and \n                  Bernold, L.E.\n                (2003), \u201cComparative performance evaluation of tele-operated pipe laying\u201d, \n                  Journal of Construction Engineering and Management\n               , Vol. 129 No. 1, pp. 32-40.","DOI":"10.1061\/(ASCE)0733-9364(2003)129:1(32)"},{"key":"key2020122301424974900_b33","doi-asserted-by":"crossref","unstructured":"Moselhi, O.\n                and \n                  Alshibani, A.\n                (2009), \u201cOptimization of earthmoving operations in heavy civil engineering projects\u201d, \n                  Journal of Construction Engineering and Management\n               , Vol. 135 No. 10, pp. 948-955.","DOI":"10.1061\/(ASCE)0733-9364(2009)135:10(948)"},{"key":"key2020122301424974900_b40","doi-asserted-by":"crossref","unstructured":"Ok, S.C.\n                and \n                  Sinha, S.K.\n                (2006), \u201cConstruction equipment productivity estimation using artificial neural networks model\u201d, \n                  Construction Management and Economics\n               , Vol. 24 No. 10, pp. 1029-1044.","DOI":"10.1080\/01446190600851033"},{"key":"key2020122301424974900_b34","unstructured":"Osanloo, M.\n                and \n                  Hekmat, A.\n                (2004), \u201cPrediction of loading system (shovel) productivity based up on (sic) large fragmented rock caused by blasting operation in Gol-e-Gohar mine of Iran\u201d, in \n                  Hardyg\u00f3ra, M.\n                \n               et al. (Eds), \n                  Mine Planning and Equipment Selection, Proceedings of the thirteenth International Symposium on Mine Planning and Equipment Selection, Taylor and Francis, London\n               , pp. 593-604."},{"key":"key2020122301424974900_b35","doi-asserted-by":"crossref","unstructured":"Panas, A.\n                and \n                  Pantouvakis, J.P.\n                (2010), \u201cComparative analysis of operational coefficients\u2019 impact on excavation operations\u201d, \n                  Engineering, Construction and Architectural Management\n               , Vol. 17 No. 5, pp. 461-475.","DOI":"10.1108\/09699981011074565"},{"key":"key2020122301424974900_b36","doi-asserted-by":"crossref","unstructured":"Parsakho, A.\n               , \n                  Hosseini, S.\n               , \n                  Jalilvand, H.\n                and \n                  Lotfalian, M.\n                (2008), \u201cPhysical soil properties and slope treatments on hydraulic excavator productivity for forest road construction\u201d, \n                  Pakistan Journal of Biological Sciences\n               , Vol. 11 No. 11, pp. 1422-1428.","DOI":"10.3923\/pjbs.2008.1422.1428"},{"key":"key2020122301424974900_b37","unstructured":"Pratt, D.\n                (2010), \n                  Fundamentals of Construction Estimating\n               , Delmar, New York, NY."},{"key":"key2020122301424974900_b38","doi-asserted-by":"crossref","unstructured":"S\u00e1enz-Royo, C.\n                and \n                  Salas-Fum\u00e1s, V.\n                (2013), \u201cLearning to learn and productivity growth: evidence from a new car productivity plant\u201d,\n                  Omega\n               , Vol. 41 No. 2, pp. 336-344.","DOI":"10.1016\/j.omega.2012.03.010"},{"key":"key2020122301424974900_b39","doi-asserted-by":"crossref","unstructured":"Schabowicz, K.\n                and \n                  Hola, B.\n                (2007), \u201cMathematical-neural model for assessing productivity of earthmoving machinery\u201d, \n                  Journal of Civil Engineering and Management\n               , Vol. 13 No. 1, pp. 47-54.","DOI":"10.3846\/13923730.2007.9636418"},{"key":"key2020122301424974900_b42","doi-asserted-by":"crossref","unstructured":"Smith, S.D.\n                (1999), \u201cEarthmoving productivity estimation using linear regression techniques\u201d, \n                  Journal of Construction Engineering and Management\n               , Vol. 125 No. 3, pp. 133-141.","DOI":"10.1061\/(ASCE)0733-9364(1999)125:3(133)"},{"key":"key2020122301424974900_b41","doi-asserted-by":"crossref","unstructured":"Smith, S.D.\n               , \n                  Osborne, J.R.\n                and \n                  Forde, M.C.\n                (1999), \u201cAnalysis of earth moving systems using discrete event simulation\u201d, \n                  Journal of Construction Engineering and Management\n               , Vol. 121 No. 4, pp. 388-396.","DOI":"10.1061\/(ASCE)0733-9364(1995)121:4(388)"},{"key":"key2020122301424974900_b43","doi-asserted-by":"crossref","unstructured":"Son, J.\n               , \n                  Kris, G.\n               , \n                  Mattila, K.G.\n                and \n                  Donald, S.\n                and \n                  Myers, D.S.W.\n                (2005), \u201cDetermination of haul distance and direction in mass excavation\u201d, \n                  Journal of Construction Engineering and Management\n               , Vol. 131 No. 3, pp. 302-309.","DOI":"10.1061\/(ASCE)0733-9364(2005)131:3(302)"},{"key":"key2020122301424974900_b44","doi-asserted-by":"crossref","unstructured":"Tam, C.M.\n               , \n                  Tong, T.K.L.\n                and \n                  Tse, S.L.\n                (2002), \u201cArtificial neural networks model for predicting excavator productivity\u201d, \n                  Engineering, Construction and Architectural Management\n               , Vol. 9 Nos 5\/6, pp. 446-452.","DOI":"10.1108\/eb021238"},{"key":"key2020122301424974900_b45","unstructured":"Volvo\n                (2007), \u201cVolvo excavator hydraulic hammers\u201d, available at: www.volvoce.com\/SiteCollectionDocuments\/VCE\/Documents%20Global\/others\/brochureHammer_22D1001945_2007-03.pdf (accessed January 2014)."},{"key":"key2020122301424974900_frd1","doi-asserted-by":"crossref","unstructured":"Carlos S\u00e1enz-Royoa, C.\n                and \n                  Salas-Fum\u00e1s, V.\n                (2012), \u201cLearning to learn and productivity growth: evidence from a new car-assembly plant\u201d, \n                  Omega\n               , Vol. 41 No. 2, pp. 336-344.","DOI":"10.1016\/j.omega.2012.03.010"}],"container-title":["International Journal of Productivity and Performance Management"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/IJPPM-02-2014-0026","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IJPPM-02-2014-0026\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IJPPM-02-2014-0026\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T22:08:22Z","timestamp":1753394902000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/ijppm\/article\/64\/6\/853-869\/164201"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,7,13]]},"references-count":45,"journal-issue":{"issue":"6","published-print":{"date-parts":[[2015,7,13]]}},"alternative-id":["10.1108\/IJPPM-02-2014-0026"],"URL":"https:\/\/doi.org\/10.1108\/ijppm-02-2014-0026","relation":{},"ISSN":["1741-0401"],"issn-type":[{"value":"1741-0401","type":"print"}],"subject":[],"published":{"date-parts":[[2015,7,13]]}}}