{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,7]],"date-time":"2026-02-07T18:01:52Z","timestamp":1770487312226,"version":"3.49.0"},"reference-count":84,"publisher":"Emerald","issue":"3","license":[{"start":{"date-parts":[[2016,4,11]],"date-time":"2016-04-11T00:00:00Z","timestamp":1460332800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,4,11]]},"abstract":"<jats:sec>\n               <jats:title content-type=\"abstract-heading\">Purpose<\/jats:title>\n               <jats:p> \u2013 The drug logistics play a crucial role in the hospital service performance. It has been proved that modern logistics concept is a valid access to competitiveness. In order to enhance the comprehensive capability and core competence of hospitals, including the internal support system, there is a great need to have an in-depth and systematic study on the drug logistics system in hospitals. The purpose of this paper is to explore the current situation of the drug logistics and the drug centres operations in public hospitals in China; specifically how the organizational partnerships with the supply chain partners can affect the operational performance. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title>\n               <jats:p> \u2013 In this study, the possibility of correlations between schedule instability, partnerships with supply chain partners, and internal drug logistics operation is investigated by modelling, with reference to the previous work of Law <jats:italic>et al.<\/jats:italic> (2009), in which collective efficacy of the performance is incorporated into the model. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Findings<\/jats:title>\n               <jats:p> \u2013 The findings of this study show that the drug logistics working teams in public hospitals in China have a high level of efficacy and self-confidence, while they perceive they provide good operations even at a low level of schedule nervousness. The study also reinforces the significant correlation between internal operation and partnership with customers. This is definitely useful for the development of an appropriate framework for drug logistics operation improvement in the long run. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title>\n               <jats:p> \u2013 The study thus offers a good reference for the administrators and practitioners who are keen on improving the service operations in the healthcare sector in the region.<\/jats:p>\n            <\/jats:sec>","DOI":"10.1108\/imds-03-2015-0091","type":"journal-article","created":{"date-parts":[[2016,3,31]],"date-time":"2016-03-31T05:00:05Z","timestamp":1459400405000},"page":"369-387","source":"Crossref","is-referenced-by-count":6,"title":["How schedule issues affect drug logistics operations: an empirical study in hospitals in China"],"prefix":"10.1108","volume":"116","author":[{"given":"Kris M. Y.","family":"Law","sequence":"first","affiliation":[]}],"member":"140","reference":[{"key":"key2020121702262136000_b1","doi-asserted-by":"crossref","unstructured":"Aptel, O.\n                and \n                  Pourjalali, H.\n                (2001), \u201cImproving activities and decreasing costs of logistics in hospitals: a comparison of US and French hospitals\u201d, \n                  The International Journal of Accounting\n               , Vol. 36 No. 1, pp. 65-90.","DOI":"10.1016\/S0020-7063(01)00086-3"},{"key":"key2020121702262136000_b2","doi-asserted-by":"crossref","unstructured":"Armistead, C.G.\n                and \n                  Mapes, J.\n                (1993), \u201cThe impact of supply chain integration on operating performance\u201d, \n                  Logistics Information Management\n               , Vol. 6 No. 4, pp. 9-14.","DOI":"10.1108\/09576059310045907"},{"key":"key2020121702262136000_b3","doi-asserted-by":"crossref","unstructured":"Bayraktar, E.\n               , \n                  Koh, S.C.L.\n               , \n                  Gunnsekaran, A.\n               , \n                  Sari, K.\n                and \n                  Tatoglu, E.\n                (2008), \u201cThe role of forecasting on bullwhip effect for E-SCM applications\u201d, \n                  International Journal of Production Economics\n               , Vol. 113 No. 1, pp. 193-204.","DOI":"10.1016\/j.ijpe.2007.03.024"},{"key":"key2020121702262136000_b4","unstructured":"Benjamin, G.C.\n               , \n                  Rothschild, J.M.\n               , \n                  Genest, R.\n                and \n                  Bates, D.W.\n                (2003), \u201cWhat do we know about medication errors in inpatient psychiatry?\u201d, \n                  Journal on Quality and Patient Safety\n               , Vol. 29 No. 8, pp. 391-400."},{"key":"key2020121702262136000_b5","doi-asserted-by":"crossref","unstructured":"Bentler, P.M.\n                (1990), \u201cComparative fit indexes in structural models\u201d, \n                  Psychological Bulletin\n               , Vol. 107 No. 2, pp. 238-246.","DOI":"10.1037\/0033-2909.107.2.238"},{"key":"key2020121702262136000_b6","doi-asserted-by":"crossref","unstructured":"Blackburn, J.D.\n               , \n                  Kropp, D.H.\n                and \n                  Millen, R.A.\n                (1985), \u201cMRP system nervousness: causes and cures\u201d, \n                  Engineering Costs and Production Economics\n               , Vol. 9 Nos 1-3, pp. 141-146.","DOI":"10.1016\/0167-188X(85)90021-7"},{"key":"key2020121702262136000_b7","doi-asserted-by":"crossref","unstructured":"Blackburn, J.D.\n               , \n                  Kropp, D.H.\n                and \n                  Millen, R.A.\n                (1986), \u201cA comparison of strategies to dampen nervousness in MRP systems\u201d, \n                  Management Science\n               , Vol. 32 No. 4, pp. 413-429.","DOI":"10.1287\/mnsc.32.4.413"},{"key":"key2020121702262136000_b8","unstructured":"Blackburn, J.D.\n               , \n                  Kropp, D.H.\n                and \n                  Millen, R.A.\n                (1987), \u201cA comparison of strategies to dampen nervousness in MRP systems\u201d, \n                  International Journal of Production Research\n               , Vol. 25 No. 12, pp. 1739-1749."},{"key":"key2020121702262136000_b9","doi-asserted-by":"crossref","unstructured":"Bollen, K.A.\n                (1989), \n                  Structural Equations with Latent Variables\n               , John Wiley, New York, NY.","DOI":"10.1002\/9781118619179"},{"key":"key2020121702262136000_b501","doi-asserted-by":"crossref","unstructured":"Brown, S.L.\n                and \n                  Eisenhardt, K.M.\n                (1995), \u201cProduct development: past research, present findings, and future directions\u201d, \n                  Academy of Management Review\n               , Vol. 20 No. 2, pp. 343-378.","DOI":"10.5465\/amr.1995.9507312922"},{"key":"key2020121702262136000_b10","doi-asserted-by":"crossref","unstructured":"Carr, A.S.\n                and \n                  Pearson, J.N.\n                (1999), \u201cStrategically managed buyer-supplier relationships and performance outcomes\u201d, \n                  Journals of Operations Management\n               , Vol. 17 No. 5, pp. 497-519.","DOI":"10.1016\/S0272-6963(99)00007-8"},{"key":"key2020121702262136000_b11","doi-asserted-by":"crossref","unstructured":"Chan, J.W.K.\n                (2005), \u201cCompetitive strategies and manufacturing logistics. An empirical study of Hong Kong manufacturers\u201d, \n                  International Journal of Physical Distribution & Logistics Management\n               , Vol. 35 No. 1, pp. 20-43.","DOI":"10.1108\/09600030510577412"},{"key":"key2020121702262136000_b12","doi-asserted-by":"crossref","unstructured":"Choi, T.Y.\n               , \n                  Dooley, K.J.\n                and \n                  Rungtusanatham, M.\n                (2001), \u201cSupply networks and complex adaptive systems: control versus emergence\u201d, \n                  Journal of Operations Management\n               , Vol. 19 No. 3, pp. 351-366.","DOI":"10.1016\/S0272-6963(00)00068-1"},{"key":"key2020121702262136000_b13","doi-asserted-by":"crossref","unstructured":"Churchill, G.A.\n                (1979), \u201cA paradigm for developing better measures of marketing constructs\u201d, \n                  Journal of Marketing Research\n               , Vol. 16 No. 1, pp. 64-72.","DOI":"10.1177\/002224377901600110"},{"key":"key2020121702262136000_b14","doi-asserted-by":"crossref","unstructured":"De Kok, T.\n                and \n                  Inderfurth, K.\n                (1997), \u201cNervousness in inventory management: comparison of basic control rules\u201d, \n                  European Journal of Operational Research\n               , Vol. 103 No. 1, pp. 55-82.","DOI":"10.1016\/S0377-2217(96)00255-X"},{"key":"key2020121702262136000_b15","doi-asserted-by":"crossref","unstructured":"Dillman, D.A.\n                (1983), \u201cMail and other self-administered questionnaires\u201d, in \n                  Rossi, P.H.\n               , \n                  Wright, J.D.\n                and \n                  Anderson, A.B.\n                (Eds), \n                  Handbook of Survey Research\n               , Academic Press, San Diego, CA, pp. 161-174.","DOI":"10.1016\/B978-0-12-598226-9.50016-1"},{"key":"key2020121702262136000_b16","doi-asserted-by":"crossref","unstructured":"Durham, C.C.\n               , \n                  Knight, D.\n                and \n                  Locke, E.A.\n                (1997), \u201cEffects of leader role, team-set goal difficulty, efficacy, and tactics on team effectiveness\u201d, \n                  Organizational Behaviour and Human Decision Processes\n               , Vol. 72 No. 2, pp. 203-231.","DOI":"10.1006\/obhd.1997.2739"},{"key":"key2020121702262136000_b17","doi-asserted-by":"crossref","unstructured":"Ellram, L.M.\n                (1991), \u201cA managerial guideline for the development and implementation of purchasing partnerships\u201d, \n                  International Journal of Purchasing and Materials Management\n               , Vol. 27 No. 2, pp. 2-8.","DOI":"10.1111\/j.1745-493X.1991.tb00534.x"},{"key":"key2020121702262136000_b18","doi-asserted-by":"crossref","unstructured":"Flynn, B.B.\n               , \n                  Sakakibara, S.\n               , \n                  Schroeder, R.G.\n               , \n                  Bates, K.A.\n                and \n                  Flynn, E.J.\n                (1990), \u201cEmpirical research methods in operations management\u201d, \n                  Journal of Operations Management\n               , Vol. 9 No. 2, pp. 250-285.","DOI":"10.1016\/0272-6963(90)90098-X"},{"key":"key2020121702262136000_b502","doi-asserted-by":"crossref","unstructured":"Frishammar, J.\n                and \n                  Horte, S.A.\n                (2005), \u201cManaging external information in manufacturing firms: the impact on innovation performance\u201d, \n                  The Journal of Product Innovation Management\n               , Vol. 22, pp. 251-266.","DOI":"10.1111\/j.0737-6782.2005.00121.x"},{"key":"key2020121702262136000_b19","doi-asserted-by":"crossref","unstructured":"Groves, G.\n                and \n                  Valsamakis, V.\n                (1998), \u201cSupplier-customer relationships and company performance\u201d, \n                  International Journal of Logistics Management\n               , Vol. 9 No. 2, pp. 51-64.","DOI":"10.1108\/09574099810805834"},{"key":"key2020121702262136000_b20","doi-asserted-by":"crossref","unstructured":"Gunasekaran, A.\n                and \n                  Ngai, E.W.T.\n                (2005), \u201cBuild-to-order supply chain management: a literature review and framework for development\u201d, \n                  Journal of Operations Management\n               , Vol. 23 No. 5, pp. 423-451.","DOI":"10.1016\/j.jom.2004.10.005"},{"key":"key2020121702262136000_b21","unstructured":"Hackman, J.R.\n                and \n                  Oldham, G.R.\n                (1980), \n                  Work Redesign\n               , Addison-Wesley, Reading, MA."},{"key":"key2020121702262136000_b22","doi-asserted-by":"crossref","unstructured":"Heinbuch, S.E.\n                (1995), \u201cA case of successful technology transfer to health care: total quality materials management and just-in-time\u201d, \n                  Journal of Management in Medicine\n               , Vol. 9 No. 2, pp. 48-56.","DOI":"10.1108\/02689239510086524"},{"key":"key2020121702262136000_b23","doi-asserted-by":"crossref","unstructured":"Heisig, G.\n                (2001), \u201cComparison of (s, S) and (s, nQ) inventory control rules with respect to planning stability\u201d, \n                  International Journal of Production Economics\n               , Vol. 73 No. 1, pp. 59-82.","DOI":"10.1016\/S0925-5273(00)00151-1"},{"key":"key2020121702262136000_b24","unstructured":"Inman, R.R.\n                and \n                  Gonsalvez, D.J.\n                (1997), \u201cThe causes of schedule instability in an automotive supply chain\u201d, \n                  Production and Inventory Management Journal\n               , Vol. 38 No. 2, pp. 26-32."},{"key":"key2020121702262136000_b25","unstructured":"Johnson, R.A.\n                and \n                  Wichern, D.W.\n                (1998), \n                  Applied Multivariate Statistical Analysis\n               , Prentice-Hall International, Englewood Cliffs, NJ."},{"key":"key2020121702262136000_b26","doi-asserted-by":"crossref","unstructured":"Kadipasaoglu, S.\n                and \n                  Sridharan, V.\n                (1995), \u201cAlternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty\u201d, \n                  Journal of Operations Management\n               , Vol. 13 No. 3, pp. 193-211.","DOI":"10.1016\/0272-6963(95)00023-L"},{"key":"key2020121702262136000_b27","doi-asserted-by":"crossref","unstructured":"Kadipasaoglu, S.N.\n                and \n                  Sridharan, S.V.\n                (1997), \u201cMeasurement of instability in multi-level MRP systems\u201d, \n                  International Journal of Production Research\n               , Vol. 35 No. 3, pp. 713-737.","DOI":"10.1080\/002075497195678"},{"key":"key2020121702262136000_b28","doi-asserted-by":"crossref","unstructured":"Kafetzidakis, I.\n                and \n                  Mihiotis, A.\n                (2012), \u201cLogistics in the health care system: the case of Greek Hospitals\u201d, \n                  International Journal of Business Administration\n               , Vol. 3 No. 5, pp. 23-32.","DOI":"10.5430\/ijba.v3n5p23"},{"key":"key2020121702262136000_b29","doi-asserted-by":"crossref","unstructured":"Kelle, P.\n                and \n                  Miller, P.A.\n                (1998), \u201cTransition to just-in-time purchasing\u201d, \n                  International Journal of Operations and Production Management\n               , Vol. 18 No. 1, pp. 53-65.","DOI":"10.1108\/01443579810192907"},{"key":"key2020121702262136000_b30","unstructured":"Kim, G.C.\n                and \n                  Schniederjans, M.J.\n                (1993), \u201cEmpirical comparison of just-in-time and stockless materiel management systems in the health care industry\u201d, \n                  Hospital Materiel Management Quarterly\n               , Vol. 14 No. 4, pp. 65-74."},{"key":"key2020121702262136000_b31","unstructured":"Kline, R.B.\n                (1998), \n                  Principles and Practices of Structural Equation Modeling\n               , Guilford Press, New York, NY."},{"key":"key2020121702262136000_b32","doi-asserted-by":"crossref","unstructured":"Krajewski, L.\n               , \n                  Wei, J.C.\n                and \n                  Tang, L.\n                (2005), \u201cResponding to schedule changes in build-to-order supply chains\u201d, \n                  Journal of Operations Management\n               , Vol. 23 No. 5, pp. 452-469.","DOI":"10.1016\/j.jom.2004.10.006"},{"key":"key2020121702262136000_b33","doi-asserted-by":"crossref","unstructured":"Lapierre, S.D.\n                and \n                  Ruiz, A.B.\n                (2007), \u201cScheduling logistic activities to improve hospital supply systems\u201d, \n                  Computers and Operations Research\n               , Vol. 34 No. 3, pp. 624-641.","DOI":"10.1016\/j.cor.2005.03.017"},{"key":"key2020121702262136000_b34","doi-asserted-by":"crossref","unstructured":"Law, K.M.Y.\n                (2009), \u201cRelationship with supply chain partners affecting internal operation of high-tech manufacturers in Taiwan\u201d, \n                  Journal of High Technology Management Research\n               , Vol. 20 No. 1, pp. 31-39.","DOI":"10.1016\/j.hitech.2009.02.001"},{"key":"key2020121702262136000_b37","doi-asserted-by":"crossref","unstructured":"Law, K.M.Y.\n                (2011), \u201cAirline catering service operation, schedule nervousness and collective efficacy on performance: Hong Kong evidence\u201d, \n                  The Service Industries Journal.\n               , Vol. 31 No. 6, pp. 959-974.","DOI":"10.1080\/02642060903079121"},{"key":"key2020121702262136000_b35","doi-asserted-by":"crossref","unstructured":"Law, K.M.Y.\n                and \n                  Pujawan, I.N.\n                (2009), \u201cCollective efficacy and manufacturing schedule instability \u2013 a study in Hong Kong and the Pearl River Delta Region\u201d, \n                  International Journal of Industrial & Systems Engineering\n               , Vol. 4 No. 1, pp. 1-18.","DOI":"10.1504\/IJISE.2009.021676"},{"key":"key2020121702262136000_b36","doi-asserted-by":"crossref","unstructured":"Law, K.M.Y.\n               , \n                  Helo, P.\n               , \n                  Kanchana, R.\n                and \n                  Phusavat, P.\n                (2009), \u201cManaging supply chains: lessons learned and future challenges\u201d, \n                  Industrial Management and Data Systems\n               , Vol. 109 No. 8, pp. 1137-1152.","DOI":"10.1108\/02635570910991346"},{"key":"key2020121702262136000_b38","unstructured":"Locke, E.A.\n                and \n                  Latham, G.P.\n                (1990), \n                  A Theory of Goal Setting and Task Performance\n               , Prentice Hall, Englewood Cliffs, NJ."},{"key":"key2020121702262136000_b39","doi-asserted-by":"crossref","unstructured":"Meixell, M.\n                (2005), \u201cThe impact of setup cost, commonality, and capacity on schedule instability: an exploratory study\u201d, \n                  International Journal of Production Economics\n               , Vol. 95 No. 1, pp. 95-107.","DOI":"10.1016\/j.ijpe.2003.11.010"},{"key":"key2020121702262136000_b40","unstructured":"Metters, R.D.\n                (1993), \u201cA method for achieving better customer service, lower costs, and less instability in master production schedules\u201d, \n                  Production and Inventory Management Journal\n               , Vol. 34 No. 4, pp. 61-66."},{"key":"key2020121702262136000_b41","doi-asserted-by":"crossref","unstructured":"Moschuris, S.J.\n                and \n                  Kondylis, M.N.\n                (2006), \u201cOutsourcing in public hospitals: a Greek perspective\u201d, \n                  Journal of Health Organization and Management\n               , Vol. 20 No. 1, pp. 4-14.","DOI":"10.1108\/14777260610656534"},{"key":"key2020121702262136000_b42","doi-asserted-by":"crossref","unstructured":"Narasimhan, R.\n                and \n                  Jayaram, J.\n                (1998), \u201cCausal linkages in supply chain management: an exploratory study of North American manufacturing firms\u201d, \n                  Decision Sciences\n               , Vol. 29 No. 3, pp. 579-605.","DOI":"10.1111\/j.1540-5915.1998.tb01355.x"},{"key":"key2020121702262136000_b43","doi-asserted-by":"crossref","unstructured":"Pan, Z.X.\n                and \n                  Pokharel, S.\n                (2007), \u201cLogistics in hospitals: a case study of some Singapore hospitals\u201d, \n                  Leadership in Health Services\n               , Vol. 20 No. 3, pp. 195-207.","DOI":"10.1108\/17511870710764041"},{"key":"key2020121702262136000_b44","doi-asserted-by":"crossref","unstructured":"Pfeiffer, A.\n               , \n                  Kadar, B.\n                and \n                  Monostori, L.\n                (2007), \u201cStability-oriented evaluation of rescheduling strategies, by using simulation\u201d, \n                  Computers in Industry\n               , Vol. 58 No. 7, pp. 630-643.","DOI":"10.1016\/j.compind.2007.05.009"},{"key":"key2020121702262136000_b45","doi-asserted-by":"crossref","unstructured":"Phusavat, K.\n               , \n                  Kess, P.\n               , \n                  Law, K.M.Y.\n                and \n                  Kanchana, R.\n                (2010), \u201cSustaining effective business value chain: future challenges\u201d, \n                  Industrial Management and Data Systems\n               , Vol. 110 No. 8, pp. 1176-1191.","DOI":"10.1108\/02635571011077825"},{"key":"key2020121702262136000_b46","doi-asserted-by":"crossref","unstructured":"Prussia, G.E.\n                and \n                  Kinicki, A.J.\n                (1996), \u201cA motivational investigation of group effectiveness using social-cognitive theory\u201d, \n                  Journal of Applied Psychology\n               , Vol. 81 No. 2, pp. 187-198.","DOI":"10.1037\/0021-9010.81.2.187"},{"key":"key2020121702262136000_b47","doi-asserted-by":"crossref","unstructured":"Pujawan, I.N.\n                (2004), \u201cSchedule nervousness in a manufacturing system: a case study\u201d, \n                  Production Planning and Control\n               , Vol. 15 No. 5, pp. 515-524.","DOI":"10.1080\/09537280410001726320"},{"key":"key2020121702262136000_b48","unstructured":"Pujawan, I.N.\n                and \n                  Kingsman, B.G.\n                (2000), \u201cSystem nervousness and inventory locations\u201d, Proceedings of the 31st Decision Science Institute National Meeting, Orlando, FL, pp. 1174-1176."},{"key":"key2020121702262136000_b503","doi-asserted-by":"crossref","unstructured":"Rosenzweig, E.D.\n               , \n                  Roth, A.V.\n                and \n                  Dean, J.W. Jr\n                (2003), \u201cThe influence of an integration strategy on competitive capabilities and business performance: an exploratory study of consumer products manufacturers\u201d, \n                  Journal of Operations Management\n               , Vol. 21 No. 4, pp. 437-456.","DOI":"10.1016\/S0272-6963(03)00037-8"},{"key":"key2020121702262136000_b49","doi-asserted-by":"crossref","unstructured":"Rungtusanatham, M.\n               , \n                  Salvador, F.\n               , \n                  Forza, C.\n                and \n                  Choi, T.Y.\n                (2003), \u201cSupply-chain linkages and operational performance, a resource-based-view perspective\u201d, \n                  International Journal of Operations and Production Management\n               , Vol. 23 No. 9, pp. 1084-1099.","DOI":"10.1108\/01443570310491783"},{"key":"key2020121702262136000_b50","doi-asserted-by":"crossref","unstructured":"Salvador, F.\n               , \n                  Forza, C.\n               , \n                  Rungtusanatham, M.\n                and \n                  Choi, T.Y.\n                (2001), \u201cSupply chain interactions and time-related performances: an operations management perspective\u201d, \n                  International Journal of Operations and Production Management\n               , Vol. 21 No. 4, pp. 461-475.","DOI":"10.1108\/01443570110381372"},{"key":"key2020121702262136000_b51","doi-asserted-by":"crossref","unstructured":"Sarkis, J.\n               , \n                  Talluri, S.\n                and \n                  Gunasekaran, A.\n                (2007), \u201cA strategic model for agile virtual enterprises partner selection\u201d, \n                  International Journal of Operations and Production Management\n               , Vol. 27 No. 11, pp. 1213-1234.","DOI":"10.1108\/01443570710830601"},{"key":"key2020121702262136000_b52","doi-asserted-by":"crossref","unstructured":"Sridharan, V.\n                and \n                  Laforge, R.L.\n                (1990), \u201cOn using buffer stock to combat schedule instability\u201d, \n                  International Journal of Operations and Production Management\n               , Vol. 10 No. 7, pp. 37-46.","DOI":"10.1108\/01443579010140281"},{"key":"key2020121702262136000_b53","doi-asserted-by":"crossref","unstructured":"Towill, D.R.\n               , \n                  Childerhouse, P.\n                and \n                  Disney, S.M.\n                (2002), \u201cIntegrating the automotive supply chain: where are we now\u201d, \n                  International Journal of Physical Distribution & Logistics Management\n               , Vol. 32 No. 2, pp. 79-95.","DOI":"10.1108\/09600030210421705"},{"key":"key2020121702262136000_b54","doi-asserted-by":"crossref","unstructured":"Verona, G.\n                (1999), \u201cA resource-based view of product development\u201d, \n                  Academy of Management Review\n               , Vol. 24 No. 1, pp. 132-142.","DOI":"10.5465\/amr.1999.1580445"},{"key":"key2020121702262136000_b505","doi-asserted-by":"crossref","unstructured":"Vickery, S.K.\n               , \n                  Jayaram, J.\n               , \n                  Droge, C.\n                and \n                  Calantone, R.\n                (2003), \u201cThe effects of an integrative supply chain strategy on customer service and financial performance: an analysis of direct versus indirect relationships\u201d, \n                  Journal of Operations Managementt\n               , Vol. 21, pp. 523-539.","DOI":"10.1016\/j.jom.2003.02.002"},{"key":"key2020121702262136000_b55","doi-asserted-by":"crossref","unstructured":"Watts, C.A.\n                and \n                  Hahn, C.K.\n                (1993), \u201cSupplier development programs: an empirical analysis\u201d, \n                  International Journal of Purchasing and Materials Management\n               , Vol. 29 No. 2, pp. 11-17.","DOI":"10.1111\/j.1745-493X.1993.tb00002.x"},{"key":"key2020121702262136000_b56","doi-asserted-by":"crossref","unstructured":"Wofford, J.C.\n               , \n                  Goodwin, V.L.\n                and \n                  Premack, S.\n                (1992), \u201cMeta-analysis of the antecedents of personal goal level\u201d, \n                  Journal of Management\n               , Vol. 18 No. 3, pp. 595-615.","DOI":"10.1177\/014920639201800309"},{"key":"key2020121702262136000_b57","doi-asserted-by":"crossref","unstructured":"Wong, T.C.\n               , \n                  Law, K.M.Y.\n               , \n                  Yau, H.K.\n                and \n                  Ngan, S.-C.\n                (2011), \u201cAnalyzing supply chain operation models with the PC-algorithm and the neural network\u201d, \n                  Expert Systems with Application: An International Journal\n               , Vol. 38 No. 6, pp. 7526-7534.","DOI":"10.1016\/j.eswa.2010.12.115"},{"key":"key2020121702262136000_b58","doi-asserted-by":"crossref","unstructured":"Worren, N.\n               , \n                  Moore, K.\n                and \n                  Cardona, P.\n                (2002), \u201cModularity, strategic flexibility, and firm performance: a study of the home appliance industry\u201d, \n                  Strategic Management Journal\n               , Vol. 23 No. 12, pp. 1123-1140.","DOI":"10.1002\/smj.276"},{"key":"key2020121702262136000_b59","doi-asserted-by":"crossref","unstructured":"Xie, J.\n               , \n                  Lee, T.S.\n                and \n                  Zhao, X.\n                (2004), \u201cImpact of forecasting error on the performance of capacitated multi-item production systems\u201d, \n                  Computers and Industrial Engineering\n               , Vol. 46 No. 2, pp. 205-219.","DOI":"10.1016\/j.cie.2003.12.020"},{"key":"key2020121702262136000_b60","doi-asserted-by":"crossref","unstructured":"Xie, J.\n               , \n                  Zhao, X.\n                and \n                  Lee, T.S.\n                (2003), \u201cFreezing the master production schedule under single resource constraint and demand uncertainty\u201d, \n                  International Journal of Production Economics\n               , Vol. 83 No. 1, pp. 65-84.","DOI":"10.1016\/S0925-5273(02)00262-1"},{"key":"key2020121702262136000_b61","doi-asserted-by":"crossref","unstructured":"Zhao, X.\n                and \n                  Lee, T.S.\n                (1993), \u201cFreezing the master production schedule for material requirements planning systems under demand uncertainty\u201d, \n                  Journal of Operations Management\n               , Vol. 11 No. 2, pp. 185-205.","DOI":"10.1016\/0272-6963(93)90022-H"},{"key":"key2020121702262136000_b62","doi-asserted-by":"crossref","unstructured":"Zhao, X.\n               , \n                  Lai, F.\n                and \n                  Lee, T.S.\n                (2001), \u201cEvaluation of safety stock methods in multilevel materials requirements planning (MRP) system\u201d, \n                  Production Planning and Control\n               , Vol. 12 No. 8, pp. 798-803.","DOI":"10.1080\/095372800110052511"},{"key":"key2020121702262136000_b63","unstructured":"Chu, F.\n               , \n                  Chen, S.\n               , \n                  Yang, Q.\n               , \n                  Zhou, Y.\n                and \n                  Huang, Z.\n                (2013), \u891a\u798f\u660e, \u7a0b\u614e\u4ee4, \u6768\u743c, \u5468\u6c38\u52e4, \n\t\t\t\t\t&\n\t\t\t\t\u9ec4\u632f. (2013). \u533b\u836f\u5206\u5f00\u7ba1\u7406\u6a21\u5f0f\u7684\u63a2\u7d22\u4e0e\u5b9e\u8df5. \u4e2d\u56fd\u836f\u4e1a, Vol. 22 No. 10, pp. 1-2."},{"key":"key2020121702262136000_b64","unstructured":"Gu, S.\n               , \n                  Zhen, W.\n                and \n                  Chen, Y.\n                (2007), \u987e\u82cf\u4fca, \u5355\u6587\u6cbb, \n\t\t\t\t\t&\n\t\t\t\t \u9648\u5b9c\u9e3f. \u73b0\u4ee3\u7269\u6d41\u6280\u672f\u5728\u533b\u9662\u836f\u54c1\u7ba1\u7406\u4e2d\u7684\u5e94\u7528\u5206\u6790. \u9996\u90fd\u533b\u836f, Vol. 14 No. 8, pp. 55-56."},{"key":"key2020121702262136000_b65","unstructured":"He, S.\n                \u8d3a\u4e66\u6b66 (2011), \u533b\u9662\u836f\u54c1\u7269\u6d41\u4e00\u4f53\u5316\u7ba1\u7406\u7684\u63a2\u8ba8. \u4eca\u65e5\u836f\u5b66, Vol. 21 No. 12, pp. 766-767."},{"key":"key2020121702262136000_b66","unstructured":"He, X.\n               , \n                  Zheng, P.\n               , \n                  Guo, H.\n                and \n                  Li, L.\n                (2012), \u4f55\u96ea\u541b, \u90d1\u5e73, \u90ed\u6d2a\u4f1f, \n\t\t\t\t\t&\n\t\t\t\t \u674e\u5792. \u4e2d\u56fd\u533b\u836f\u7269\u6d41\u53d1\u5c55\u8d8b\u52bf\u5206\u6790. \u4ef7\u503c\u5de5\u7a0b, Vol. 31 No. 4, pp. 20-21."},{"key":"key2020121702262136000_b67","unstructured":"Ji, M.\n               , \n                  Xi, Y.\n                and \n                  Wu, T.\n                (2013), \u5b63\u654f, \u595a\u7389\u9e23, \n\t\t\t\t\t&\n\t\t\t\t\u5434\u6d9b. (2013). \u65b0\u533b\u6539\u80cc\u666f\u4e0b\u7684\u533b\u9662\u836f\u54c1\u7269\u6d41\u7ba1\u7406\u6a21\u5f0f\u521d\u63a2.\u4e0a\u6d77\u533b\u836f, Vol. 19, pp. 25-27."},{"key":"key2020121702262136000_b68","unstructured":"Jiang, C.\n                \u6c5f\u707f (2011), \u65b0\u533b\u6539\u4e0b\u836f\u54c1\u7269\u6d41\u4f01\u4e1a\u670d\u52a1\u6a21\u5f0f\u7814\u7a76.\u5317\u4eac\u4ea4\u901a\u5927\u5b66."},{"key":"key2020121702262136000_b69","doi-asserted-by":"crossref","unstructured":"Li, X.\n                \u674e\u96ea\u7ea2 (2013), \u533b\u836f\u5206\u5bb6\u73b0\u72b6\u53ca\u5b58\u5728\u7684\u95ee\u9898\u7814\u7a76. \u6c42\u533b\u95ee\u836f : \u5b66\u672f\u7248, Vol. 11, No. 2.","DOI":"10.1016\/S1674-2001(13)00061-8"},{"key":"key2020121702262136000_b70","unstructured":"Liang, Z.\n                and \n                  Jiang, L.\n                (2010),  \u6881\u5fe0\u660e, \n\t\t\t\t\t&\n\t\t\t\t\u59dc\u4e3d\u840d. \u533b\u9662\u7269\u6d41\u73b0\u72b6\u4e0e\u53d1\u5c55\u8d8b\u52bf. \u4e2d\u56fd\u5f53\u4ee3\u533b\u836f, Vol. 17 No. 19, pp. 202-203."},{"key":"key2020121702262136000_b71","unstructured":"Ministry of Commerce of the People\u2019s Republic of China\n                (2011), \u5546\u52a1\u90e8. \u5168\u56fd\u836f\u54c1\u6d41\u901a\u884c\u4e1a\u53d1\u5c55\u89c4\u5212\u7eb2\u8981 (2011-2015), available at: www.mofcom.gov.cn\/aarticle\/ae\/ai\/201105\/20110507534948.html"},{"key":"key2020121702262136000_b72","unstructured":"Sun, L.\n                \u5b59\u740d (2014), \u4e00\u79cd\u57fa\u4e8e\u7b2c\u4e09\u65b9\u7269\u6d41\u548c\u7535\u5b50\u5546\u52a1\u7684\u533b\u836f\u4f9b\u5e94\u94fe\u65b0\u6a21\u5f0f. \u7269\u6d41\u79d1\u6280, Vol. 37 No. 7, pp. 95-97."},{"key":"key2020121702262136000_b73","unstructured":"The Central People\u2019s Government of the People\u2019s Republic of China\n               , \u56fd\u52a1\u9662 (2015), \u4e2d\u56fd\u653f\u5e9c\u5de5\u4f5c\u62a5\u544a, available at: www.gov.cn\/guowuyuan\/2015-03\/16\/content_2835101.htm"},{"key":"key2020121702262136000_b74","unstructured":"The Central People\u2019s Government of the People\u2019s Republic of China\n                (2009), \u56fd\u52a1\u9662. \u7269\u6d41\u4e1a\u8c03\u6574\u548c\u632f\u5174\u89c4\u5212, available at: www.gov.cn\/zwgk\/2009-03\/13\/content_1259194.htm"},{"key":"key2020121702262136000_b75","unstructured":"Wang, Y.\n                \u738b\u5b8f. (2013), \u4ece\u65b0\u7248GSP\u770b\u6211\u56fd\u533b\u836f\u7269\u6d41\u4f01\u4e1a\u7684\u53d1\u5c55\u8d8b\u52bf. 2013\u5e74\u4e2d\u56fd\u836f\u5b66\u4f1a\u836f\u4e8b\u7ba1\u7406\u4e13\u4e1a\u59d4\u5458\u4f1a\u5e74\u4f1a\u66a8\u201c\u533b\u836f\u5b89\u5168\u4e0e\u79d1\u5b66\u53d1\u5c55\u201d\u5b66\u672f\u8bba\u575b\u8bba\u6587\u96c6(\u4e0b\u518c)."},{"key":"key2020121702262136000_b76","unstructured":"Wang, Y.\n                \n               \n                  Zhou, Y.\n                and \n                  Zhang, D.\n                (2006), \u738b\u4e91, \u5468\u5b87, \n\t\t\t\t\t&\n\t\t\t\t\u5f20\u4e1c. \u533b\u9662\u7269\u6d41\u7ba1\u7406\u7684\u73b0\u72b6\u4e0e\u6539\u9769\u601d\u8def. \u6c5f\u82cf\u7701\u836f\u5b66\u4f1a\u7b2c\u4e03\u5c4a\u836f\u5e08\u5468\u5927\u4f1a\u3001\u7b2c\u5341\u4e00\u5c4a\u534e\u4e1c\u5730\u533a\u836f\u5242\u5b66\u672f\u4f1a\u8bae."},{"key":"key2020121702262136000_b77","unstructured":"Wu, Z.\n                (2006), \u5434\u5fd7\u5229. \u8bd5\u8ff0\u6211\u56fd\u533b\u836f\u7269\u6d41\u7684\u73b0\u72b6\u53ca\u53d1\u5c55\u8d8b\u52bf. \u533b\u9662\u9662\u957f\u8bba\u575b-\u9996\u90fd\u533b\u79d1\u5927\u5b66\u5b66\u62a5\uff1a\u793e\u4f1a\u79d1\u5b66\u7248, Vol. 3 No. 4, 46-48."},{"key":"key2020121702262136000_b78","unstructured":"Yang, X.\n                \u6768\u5c0f\u4e3d. (2013), \u5173\u4e8e\u6784\u5efa\u548c\u5b8c\u5584\u533b\u9662\u7269\u6d41\u7ba1\u7406\u7cfb\u7edf\u7684\u63a2\u8ba8. \u7ecf\u6d4e\u5e08, Vol. 5, pp. 127-128."},{"key":"key2020121702262136000_b79","unstructured":"Zhang, S.L.\n                (2015), \u5f20\u5c11\u5170. \u6211\u56fd\u836f\u54c1\u7b2c\u4e09\u65b9\u7269\u6d41\u7684\u73b0\u72b6\u53ca\u53d1\u5c55\u7b56\u7565\u63a2\u8ba8. \u4e2d\u56fd\u836f\u4e1a, Vol. 6."},{"key":"key2020121702262136000_b80","unstructured":"Zhi, J.\n                (2008), \u90c5\u519b. \u5173\u4e8e\u533b\u9662\u7269\u6d41\u7ba1\u7406\u7684\u7efc\u8ff0. \u62a4\u7406\u7814\u7a76, Vol. 22 No. 9, pp. 2452-2454."}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-03-2015-0091\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-03-2015-0091\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T21:51:28Z","timestamp":1753393888000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/116\/3\/369-387\/184723"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,4,11]]},"references-count":84,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,4,11]]}},"alternative-id":["10.1108\/IMDS-03-2015-0091"],"URL":"https:\/\/doi.org\/10.1108\/imds-03-2015-0091","relation":{},"ISSN":["0263-5577"],"issn-type":[{"value":"0263-5577","type":"print"}],"subject":[],"published":{"date-parts":[[2016,4,11]]}}}