{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,2]],"date-time":"2025-08-02T17:27:37Z","timestamp":1754155657939,"version":"3.41.2"},"reference-count":38,"publisher":"Emerald","issue":"8","license":[{"start":{"date-parts":[[2014,9,2]],"date-time":"2014-09-02T00:00:00Z","timestamp":1409616000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,9,2]]},"abstract":"<jats:sec>\n               <jats:title content-type=\"abstract-heading\">Purpose<\/jats:title>\n               <jats:p> \u2013 The purpose of this paper is to investigate the total cost function of an inventory system with a reorder point\/order quantity policy where the lead time is controllable based on the cost paid by the buyer for the service. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title>\n               <jats:p> \u2013 Cost functions are presented to investigate how the changes in lead time affect different components of inventory cost in the present of random demand. Two methods including an iteration technique and Simulated Annealing (SA) algorithm are presented to deal with the cost optimization issue. The application of proposed model is illustrated using numerical case scenarios. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Findings<\/jats:title>\n               <jats:p> \u2013 The cost functions show that besides ordering cost, change in stochastic demand during lead time is the major factor that affects the other cost components such as holding and penalty costs. This finding is validated by numerical study. Results also show that performance of SA algorithm is highly similar to iteration methodology, while the former one is easier in application. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Practical implications<\/jats:title>\n               <jats:p> \u2013 This paper develops less complex, more pragmatic methods, easily adoptable by logistics managers for cost minimization. This paper also analyzes and highlights the unique characteristics and features of these two approaches that can help practitioners in making the right choice when faced with the identified logistics issue. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title>\n               <jats:p> \u2013 This research explicitly investigate impacts of changing lead time on inventory cost components which enables informed decision making and inventory system planning for cost optimization by logistics practitioners. Two methodologies that can be easily used by practitioners without deep mathematical analysis and is cost effective are introduced to solve the optimization problem. Detailed roadmaps of how to implement proposed approaches have been illustrated by different case scenarios.<\/jats:p>\n            <\/jats:sec>","DOI":"10.1108\/imds-06-2014-0192","type":"journal-article","created":{"date-parts":[[2014,9,17]],"date-time":"2014-09-17T08:15:07Z","timestamp":1410941707000},"page":"1229-1245","source":"Crossref","is-referenced-by-count":7,"title":["Optimization model for transportation planning with demand uncertainties"],"prefix":"10.1108","volume":"114","author":[{"given":"Dilupa","family":"Nakandala","sequence":"first","affiliation":[]},{"given":"Henry","family":"Lau","sequence":"additional","affiliation":[]},{"given":"Jingjing","family":"Zhang","sequence":"additional","affiliation":[]}],"member":"140","reference":[{"key":"key2020122903231065300_b2","doi-asserted-by":"crossref","unstructured":"Axs\u00e4ter, S.\n                (2006a), \u201cA simple procedure for determining order quantities under a fill rate constraint and normally distributed lead-time demand\u201d, European Journal of Operational Research, Vol. 174 No. 1, pp. 480-491.","DOI":"10.1016\/j.ejor.2005.01.037"},{"key":"key2020122903231065300_b1","unstructured":"Axs\u00e4ter, S.\n                (2006b), Inventory Control, Springer, New York, NY."},{"key":"key2020122903231065300_b3","doi-asserted-by":"crossref","unstructured":"Ben-Daya, M.\n                and \n                  Raouf, A.\n                (1994), \u201cInventory models involving lead time as a decision variable\u201d, Journal of the Operational Research Society, Vol. 45 No. 5, pp. 579-582.","DOI":"10.1057\/jors.1994.85"},{"key":"key2020122903231065300_b4","doi-asserted-by":"crossref","unstructured":"Chandra, C.\n                and \n                  Grabis, J.\n                (2008), \u201cInventory management with variable lead-time dependent procurement cost\u201d, Omega, Vol. 36 No. 5, pp. 877-887.","DOI":"10.1016\/j.omega.2006.04.009"},{"key":"key2020122903231065300_b5","doi-asserted-by":"crossref","unstructured":"Chatfield, D.C.\n               , \n                  Hayya, J.C.\n                and \n                  Cook, D.P.\n                (2013), \u201cStockout propagation and amplification in supply chain inventory systems\u201d, International Journal of Production Research, Vol. 51 No. 5, pp. 1491-1507.","DOI":"10.1080\/00207543.2012.697205"},{"key":"key2020122903231065300_b6","unstructured":"Coyle, J.\n               , \n                  Langley, C.\n               , \n                  Gibson, B.\n               , \n                  Novack, R.\n                and \n                  Bardi, E.\n                (2008), Supply Chain Management: a Logistics Perspective, Cengage Learning, Boston, MA."},{"key":"key2020122903231065300_b7","doi-asserted-by":"crossref","unstructured":"Danese, P.\n               , \n                  Romano, P.\n                and \n                  Bortolotti, T.\n                (2012), \u201cJIT production, JIT supply and performance: investigating the moderating effects\u201d, Industrial Management & Data Systems, Vol. 112 No. 3, pp. 441-465.","DOI":"10.1108\/02635571211210068"},{"key":"key2020122903231065300_b8","doi-asserted-by":"crossref","unstructured":"Datta, P.P.\n                and \n                  Christopher, M.G.\n                (2011), \u201cInformation sharing and coordination mechanisms for managing uncertainty in supply chains: a simulation study\u201d, International Journal of Production Research, Vol. 49 No. 3, pp. 765-803.","DOI":"10.1080\/00207540903460216"},{"key":"key2020122903231065300_b9","doi-asserted-by":"crossref","unstructured":"Feng, Q.\n                and \n                  Lu, L.X.\n                (2012), \u201cThe strategic perils of low cost outsourcing\u201d, Management Science, Vol. 58 No. 6, pp. 1196-1210.","DOI":"10.1287\/mnsc.1110.1481"},{"key":"key2020122903231065300_b10","doi-asserted-by":"crossref","unstructured":"Glock, C.H.\n                (2012), \u201cLead time reduction strategies in a single-vendor \u2013 single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand\u201d, International Journal of Production Economics, Vol. 136 No. 1, pp. 37-44.","DOI":"10.1016\/j.ijpe.2011.09.007"},{"key":"key2020122903231065300_b11","doi-asserted-by":"crossref","unstructured":"Green, K.W.\n                and \n                  Inman, R.A.\n                (2005), \u201cUsing a just-in-time selling strategy to strengthen supply chain linkages\u201d, International Journal of Production Research, Vol. 43 No. 16, pp. 3437-3453.","DOI":"10.1080\/00207540500118035"},{"key":"key2020122903231065300_b12","doi-asserted-by":"crossref","unstructured":"Hayya, J.C.\n               , \n                  Kim, J.G.\n               , \n                  Disney, S.M.\n               , \n                  Harrison, T.P.\n                and \n                  Chatfield, D.\n                (2006), \u201cEstimation in supply chain inventory management\u201d, International Journal of Production Research, Vol. 44 No. 7, pp. 1313-1330.","DOI":"10.1080\/00207540500338039"},{"key":"key2020122903231065300_b13","doi-asserted-by":"crossref","unstructured":"Heydari, J.\n               , \n                  Kazemzadeh, R.B.\n                and \n                  Chaharsooghi, S.K.\n                (2009), \u201cA study of lead time variation impact on supply chain performance\u201d, The International Journal of Advanced Manufacturing Technology, Vol. 40 Nos 11\/12, pp. 1206-1215.","DOI":"10.1007\/s00170-008-1428-2"},{"key":"key2020122903231065300_b14","unstructured":"Hillier, F.S.\n                and \n                  Lieberman, G.J.\n                (2005), Introduction to Operations Research, McGraw-Hill Higher Education, Boston, MA."},{"key":"key2020122903231065300_b15","doi-asserted-by":"crossref","unstructured":"Lan, S.-P.\n               , \n                  Chu, P.\n               , \n                  Chung, K.-J.\n               , \n                  Wan, W.-J.\n                and \n                  Lo, R.\n                (1999), \u201cA simple method to locate the optimal solution of the inventory model with variable lead time\u201d, Computers & Operations Research, Vol. 26 No. 6, pp. 599-605.","DOI":"10.1016\/S0305-0548(98)00049-5"},{"key":"key2020122903231065300_b16","doi-asserted-by":"crossref","unstructured":"Leng, M.\n                and \n                  Parlar, M.\n                (2009), \u201cLead-time reduction in a two-level supply chain: non-cooperative equilibria vs coordination with a profit-sharing contract\u201d, International Journal of Production Economics, Vol. 118 No. 2, pp. 521-544.","DOI":"10.1016\/j.ijpe.2009.01.002"},{"key":"key2020122903231065300_b17","doi-asserted-by":"crossref","unstructured":"Li, Y.\n               , \n                  Xu, X.\n               , \n                  Zhao, X.\n               , \n                  Yeung, J.H.Y.\n                and \n                  Ye, F.\n                (2012), \u201cSupply chain coordination with controllable lead time and asymmetric information\u201d, European Journal of Operational Research, Vol. 217 No. 1, pp. 108-119.","DOI":"10.1016\/j.ejor.2011.09.003"},{"key":"key2020122903231065300_b18","doi-asserted-by":"crossref","unstructured":"Liao, C.-J.\n                and \n                  Shyu, C.-H.\n                (1991), \u201cAn analytical determination of lead time with normal demand\u201d, International Journal of Operations & Production Management, Vol. 11 No. 9, pp. 72-78.","DOI":"10.1108\/EUM0000000001287"},{"key":"key2020122903231065300_b19","doi-asserted-by":"crossref","unstructured":"Liu, L.\n               , \n                  Parlar, M.\n                and \n                  Zhu, S.X.\n                (2007), \u201cPricing and lead time decisions in decentralized supply chains\u201d, Management Science, Vol. 53 No. 5, pp. 713-725.","DOI":"10.1287\/mnsc.1060.0653"},{"key":"key2020122903231065300_b20","doi-asserted-by":"crossref","unstructured":"Mackelprang, A.W.\n                and \n                  Nair, A.\n                (2010), \u201cRelationship between just-in-time manufacturing practices and performance: a meta-analytic investigation\u201d, Journal of Operations Management, Vol. 28 No. 4, pp. 283-302.","DOI":"10.1016\/j.jom.2009.10.002"},{"key":"key2020122903231065300_b21","unstructured":"Nahmias, S.\n                (2005), Production and Operations Analysis, McGraw\/Irwin, New York, NY."},{"key":"key2020122903231065300_b22","doi-asserted-by":"crossref","unstructured":"Ouyang, L.-Y.\n               , \n                  Chen, C.-K.\n                and \n                  Chang, H.-C.\n                (2002), \u201cQuality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process\u201d, Computers & Operations Research, Vol. 29 No. 12, pp. 1701-1717.","DOI":"10.1016\/S0305-0548(01)00051-X"},{"key":"key2020122903231065300_b23","doi-asserted-by":"crossref","unstructured":"Ouyang, L.-Y.\n                and \n                  Wu, K.-S.\n                (1997), \u201cMixture inventory model involving variable lead time with a service level constraint\u201d, Computers & Operations Research, Vol. 24 No. 9, pp. 875-882.","DOI":"10.1016\/S0305-0548(96)00084-6"},{"key":"key2020122903231065300_b24","doi-asserted-by":"crossref","unstructured":"Ouyang, L.-Y.\n               , \n                  Wu, K.-S.\n                and \n                  Ho, C.-H.\n                (2004), \u201cIntegrated vendor-buyer cooperative models with stochastic demand in controllable lead time\u201d, International Journal of Production Economics, Vol. 92 No. 3, pp. 255-266.","DOI":"10.1016\/j.ijpe.2003.10.016"},{"key":"key2020122903231065300_b25","doi-asserted-by":"crossref","unstructured":"Sakakibara, S.\n               , \n                  Flynn, B.B.\n               , \n                  Schroeder, R.G.\n                and \n                  Morris, W.T.\n                (1997), \u201cThe impact of just-in-time manufacturing and its infrastructure on manufacturing performance\u201d, Management Science, Vol. 43 No. 9, pp. 1246-1257.","DOI":"10.1287\/mnsc.43.9.1246"},{"key":"key2020122903231065300_b26","doi-asserted-by":"crossref","unstructured":"Sarmah, S.P.\n               , \n                  Acharya, D.\n                and \n                  Goyal, S.K.\n                (2006), \u201cBuyer vendor coordination models in supply chain management\u201d, European Journal of Operational Research, Vol. 175 No. 1, pp. 1-15.","DOI":"10.1016\/j.ejor.2005.08.006"},{"key":"key2020122903231065300_b27","doi-asserted-by":"crossref","unstructured":"Song, J.-S.\n               , \n                  Zhang, H.\n               , \n                  Hou, Y.\n                and \n                  Wang, M.\n                (2010), \u201cThe effect of lead time and demand uncertainties in (r, q) inventory systems\u201d, Operations Research, Vol. 58 No. 1, pp. 68-80.","DOI":"10.1287\/opre.1090.0711"},{"key":"key2020122903231065300_b28","doi-asserted-by":"crossref","unstructured":"Suman, B.\n                and \n                  Kumar, P.\n                (2006), \u201cA survey of simulated annealing as a tool for single and multiobjective optimization\u201d, Journal of the Operational Research Society, Vol. 57 No. 10, pp. 1143-1160.","DOI":"10.1057\/palgrave.jors.2602068"},{"key":"key2020122903231065300_b29","doi-asserted-by":"crossref","unstructured":"Thomas, D.J.\n                and \n                  Tyworth, J.E.\n                (2006), \u201cPooling lead-time risk by order splitting: a critical review\u201d, Transportation Research Part E: Logistics and Transportation Review, Vol. 42 No. 4, pp. 245-257.","DOI":"10.1016\/j.tre.2004.11.002"},{"key":"key2020122903231065300_b30","unstructured":"Tersine, R.J.\n                (1994), Principles of Inventory and Materials Management, PTR Prentice Hall, Amsterdom, p. -."},{"key":"key2020122903231065300_b31","doi-asserted-by":"crossref","unstructured":"Wang, C.-N.\n                and \n                  Wang, C.-H.\n                (2007), \u201cA simulated model for cycle time reduction by acquiring optimal lot size in semiconductor manufacturing\u201d, The International Journal of Advanced Manufacturing Technology, Vol. 34 Nos 9\/10, pp. 1008-1015.","DOI":"10.1007\/s00170-006-0884-9"},{"key":"key2020122903231065300_b32","doi-asserted-by":"crossref","unstructured":"Ward, P.\n                and \n                  Zhou, H.\n                (2006), \u201cImpact of information technology integration and lean\/just-in-time practices on lead-time performance\u201d, Decision Sciences, Vol. 37 No. 2, pp. 177-203.","DOI":"10.1111\/j.1540-5915.2006.00121.x"},{"key":"key2020122903231065300_b33","doi-asserted-by":"crossref","unstructured":"Wu, Z.\n               , \n                  Kazaz, B.\n               , \n                  Webster, S.\n                and \n                  Yang, K.K.\n                (2012), \u201cOrdering, pricing, and lead-time quotation under lead-time and demand uncertainty\u201d, Production and Operations Management, Vol. 21 No. 3, pp. 576-589.","DOI":"10.1111\/j.1937-5956.2011.01289.x"},{"key":"key2020122903231065300_b34","doi-asserted-by":"crossref","unstructured":"Yang, J.-S.\n                and \n                  Pan, J.C.-H.\n                (2004), \u201cJust-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment\u201d, International Journal of Production Research, Vol. 42 No. 5, pp. 853-863.","DOI":"10.1080\/00207540310001632448"},{"key":"key2020122903231065300_b35","doi-asserted-by":"crossref","unstructured":"Yang, M.-F.\n                (2010), \u201cSupply chain integrated inventory model with present value and dependent crashing cost is polynomial\u201d, Mathematical and Computer Modelling, Vol. 51 No. 5, pp. 802-809.","DOI":"10.1016\/j.mcm.2009.10.014"},{"key":"key2020122903231065300_b36","doi-asserted-by":"crossref","unstructured":"Ye, F.\n                and \n                  Xu, X.\n                (2010), \u201cCost allocation model for optimizing supply chain inventory with controllable lead time\u201d, Computers & Industrial Engineering, Vol. 59 No. 1, pp. 93-99.","DOI":"10.1016\/j.cie.2010.03.003"},{"key":"key2020122903231065300_b37","doi-asserted-by":"crossref","unstructured":"Yugang, Y.\n               , \n                  Liang, L.\n                and \n                  Huang, G.Q.\n                (2006), \u201cLeader-follower game in vendor-managed inventory system with limited production capacity considering wholesale and retail prices\u201d, International Journal of Logistics: Research and Applications, Vol. 9 No. 4, pp. 335-350.","DOI":"10.1080\/13675560600836910"},{"key":"key2020122903231065300_b38","doi-asserted-by":"crossref","unstructured":"Zhang, J.\n                (2012), \u201cInflow of labour, producer services and wage inequality\u201d, Economics Letters, Vol. 117 No. 3, pp. 600-603.","DOI":"10.1016\/j.econlet.2012.07.032"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/IMDS-06-2014-0192","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-06-2014-0192\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-06-2014-0192\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T21:52:20Z","timestamp":1753393940000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/114\/8\/1229-1245\/183293"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,9,2]]},"references-count":38,"journal-issue":{"issue":"8","published-print":{"date-parts":[[2014,9,2]]}},"alternative-id":["10.1108\/IMDS-06-2014-0192"],"URL":"https:\/\/doi.org\/10.1108\/imds-06-2014-0192","relation":{},"ISSN":["0263-5577"],"issn-type":[{"type":"print","value":"0263-5577"}],"subject":[],"published":{"date-parts":[[2014,9,2]]}}}