{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,7]],"date-time":"2025-11-07T13:21:04Z","timestamp":1762521664734,"version":"3.41.2"},"reference-count":31,"publisher":"Emerald","issue":"2","license":[{"start":{"date-parts":[[2014,3,4]],"date-time":"2014-03-04T00:00:00Z","timestamp":1393891200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,3,4]]},"abstract":"<jats:sec>\n               <jats:title content-type=\"abstract-heading\">Purpose<\/jats:title>\n               <jats:p> \u2013 Making decisions on production and maintenance separately, as is often done in practice and research literature, may not result in overall optimization. This paper aims to propose a joint method that better integrates production planning and maintenance at the tactical level. The potential of improving the performance of the classic planning method is also explored. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title>\n               <jats:p> \u2013 An integrated production planning and maintenance model is proposed. The production capacity losses resulted from both preventive and corrective maintenance activities are considered. Meanwhile, the reliability deterioration of the machine is considered to be operation dependent. An iterative approach is presented to find a solution for the nonlinear model through iteratively solving a sequence of mixed integer linear programming instances, accompanied by modification of some parameters prior to each iteration. Computational experiments are conducted to evaluate the performance of the proposed method compared with three other methods, including two methods based on separate planning and one integrated model. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Findings<\/jats:title>\n               <jats:p> \u2013 The superiority of the proposed method compared with all the other three methods is demonstrated. Thus, the values of both integrated planning and considering operation-dependent failures are testified. The advantage of the proposed method is highlighted in the cases of high capacity utilization, long maintenance durations and low maintenance costs. The performance of the two methods based on separate planning is sensitive to the system utilization, and when utilization is high, the one with an availability-sensitive objective function defined for the maintenance problem performs better. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title>\n               <jats:p> \u2013 Few studies have been carried out to integrate decisions on production lot and maintenance. Their considerations are either incomplete or not realistic enough. A more comprehensive and realistic integrated model is proposed in this paper, along with an iterative solution algorithm for it. A potential way to improve the performance of the classic planning method with its simplicity preserved is also presented.<\/jats:p>\n            <\/jats:sec>","DOI":"10.1108\/imds-07-2013-0314","type":"journal-article","created":{"date-parts":[[2014,1,24]],"date-time":"2014-01-24T21:27:09Z","timestamp":1390598829000},"page":"162-182","source":"Crossref","is-referenced-by-count":45,"title":["Integrating production planning and maintenance: an iterative method"],"prefix":"10.1108","volume":"114","author":[{"given":"Shixiong","family":"Zhao","sequence":"first","affiliation":[]},{"given":"Liya","family":"Wang","sequence":"additional","affiliation":[]},{"given":"Yu","family":"Zheng","sequence":"additional","affiliation":[]}],"member":"140","reference":[{"key":"key2021010301394530500_b2","doi-asserted-by":"crossref","unstructured":"Aghezzaf, E.H.\n                and \n                  Najid, N.M.\n                (2008), \u201cIntegrated production planning and preventive maintenance in deteriorating production systems\u201d, Information Sciences, Vol. 178 No. 17, pp. 3382-3392.","DOI":"10.1016\/j.ins.2008.05.007"},{"key":"key2021010301394530500_b1","doi-asserted-by":"crossref","unstructured":"Aghezzaf, E.H.\n               , \n                  Jamali, M.A.\n                and \n                  Ait-Kadi, D.\n                (2007), \u201cAn integrated production and preventive maintenance planning model\u201d, European Journal of Operational Research, Vol. 181 No. 2, pp. 679-685.","DOI":"10.1016\/j.ejor.2006.06.032"},{"key":"key2021010301394530500_b3","doi-asserted-by":"crossref","unstructured":"Argoneto, P.\n               , \n                  Perrone, G.\n               , \n                  Paolo Renna, P.\n               , \n                  Lo Nigro, G.\n                and \n                  Bruccoleri, M.\n                (2008), Production Planning in Production Networks: Models for Medium and Short-Term Planning, Springer, London.","DOI":"10.1007\/978-1-84800-058-2"},{"key":"key2021010301394530500_b4","doi-asserted-by":"crossref","unstructured":"Ben Ali, M.\n               , \n                  Sassi, M.\n               , \n                  Gossa, M.\n                and \n                  Harrath, Y.\n                (2011), \u201cSimultaneous scheduling of production and maintenance tasks in the job shop\u201d, International Journal of Production Research, Vol. 49 No. 13, pp. 3891-3918.","DOI":"10.1080\/00207543.2010.492405"},{"key":"key2021010301394530500_b5","doi-asserted-by":"crossref","unstructured":"Ben-Daya, M.\n                (2002), \u201cThe economic production lot-sizing problem with imperfect production processes and imperfect maintenance\u201d, International Journal of Production Economics, Vol. 76 No. 3, pp. 257-264.","DOI":"10.1016\/S0925-5273(01)00168-2"},{"key":"key2021010301394530500_b6","doi-asserted-by":"crossref","unstructured":"Berrichi, A.\n               , \n                  Yalaoui, F.\n               , \n                  Amodeo, L.\n                and \n                  Mezghiche, M.\n                (2010), \u201cBi-objective ant colony optimization approach to optimize production and maintenance scheduling\u201d, Computers & Operations Research, Vol. 37 No. 9, pp. 1584-1596.","DOI":"10.1016\/j.cor.2009.11.017"},{"key":"key2021010301394530500_b7","doi-asserted-by":"crossref","unstructured":"Buzacott, J.A.\n                and \n                  Hanifin, L.E.\n                (1978), \u201cModels of automatic transfer lines with inventory banks: a review and comparison\u201d, AIIE Transactions, Vol. 10 No. 2, pp. 197-207.","DOI":"10.1080\/05695557808975204"},{"key":"key2021010301394530500_b8","doi-asserted-by":"crossref","unstructured":"Cassady, R.C.\n                and \n                  Kutanoglu, E.\n                (2003), \u201cMinimising job tardiness using integrated preventive maintenance planning and production scheduling\u201d, IIE Transactions, Vol. 35 No. 6, pp. 503-513.","DOI":"10.1080\/07408170304416"},{"key":"key2021010301394530500_b9","doi-asserted-by":"crossref","unstructured":"Chakraborty, T.\n               , \n                  Giri, B.C.\n                and \n                  Chaudhuri, K.S.\n                (2008), \u201cProduction lot sizing with process deterioration and machine breakdown\u201d, European Journal of Operational Research, Vol. 185 No. 2, pp. 606-618.","DOI":"10.1016\/j.ejor.2007.01.011"},{"key":"key2021010301394530500_b10","doi-asserted-by":"crossref","unstructured":"Fitouhi, M.C.\n                and \n                  Nourelfath, M.\n                (2012), \u201cIntegrating non-cyclical preventive maintenance scheduling and production planning for a single machine\u201d, International Journal of Production Economics, Vol. 136 No. 2, pp. 344-351.","DOI":"10.1016\/j.ijpe.2011.12.021"},{"key":"key2021010301394530500_b11","doi-asserted-by":"crossref","unstructured":"Garg, A.\n                and \n                  Deshmukh, S.G.\n                (2006), \u201cMaintenance management: literature review and directions\u201d, Journal of Quality in Maintenance Engineering, Vol. 12 No. 3, pp. 205-238.","DOI":"10.1108\/13552510610685075"},{"key":"key2021010301394530500_b12","doi-asserted-by":"crossref","unstructured":"Hadidi, L.A.\n               , \n                  Al-Turki, U.M.\n                and \n                  Rahim, A.\n                (2012), \u201cIntegrated models in production planning and scheduling, maintenance and quality: a review\u201d, International Journal of Industrial and Systems Engineering, Vol. 10 No. 1, pp. 21-50.","DOI":"10.1504\/IJISE.2012.044042"},{"key":"key2021010301394530500_b13","doi-asserted-by":"crossref","unstructured":"Iravani, S.\n                and \n                  Duenyas, I.\n                (2002), \u201cIntegrated maintenance and production control of a deteriorating production system\u201d, IIE Transactions, Vol. 34 No. 5, pp. 423-435.","DOI":"10.1080\/07408170208928880"},{"key":"key2021010301394530500_b14","doi-asserted-by":"crossref","unstructured":"Jans, R.\n                and \n                  Degraeve, Z.\n                (2007), \u201cMeta-heuristics for dynamic lot sizing: a review and comparison of solution approaches\u201d, European Journal of Operational Research, Vol. 177 No. 3, pp. 1855-1875.","DOI":"10.1016\/j.ejor.2005.12.008"},{"key":"key2021010301394530500_b15","doi-asserted-by":"crossref","unstructured":"Karimi, B.\n               , \n                  FatemiGhomi, S.M.T.\n                and \n                  Wilson, J.M.\n                (2003), \u201cThe capacitated lot sizing problem: a review of models and algorithms\u201d, Omega, Vol. 31 No. 5, pp. 365-378.","DOI":"10.1016\/S0305-0483(03)00059-8"},{"key":"key2021010301394530500_b16","doi-asserted-by":"crossref","unstructured":"Kenn\u00e9, J.P.\n                and \n                  Boukas, E.\n                (2003), \u201cHierarchical control of production and maintenance rates in manufacturing systems\u201d, Journal of Quality in Maintenance Engineering, Vol. 9 No. 1, pp. 66-82.","DOI":"10.1108\/13552510310466927"},{"key":"key2021010301394530500_b17","doi-asserted-by":"crossref","unstructured":"Kenn\u00e9, J.P.\n                and \n                  Gharbi, A.\n                (2001), \u201cA simulation optimization approach in production planning of failure prone manufacturing systems\u201d, Journal of Intelligent Manufacturing, Vol. 12 No. 5, pp. 421-431.","DOI":"10.1023\/A:1012244218961"},{"key":"key2021010301394530500_b18","doi-asserted-by":"crossref","unstructured":"Liao, G.L.\n                and \n                  Sheu, S.H.\n                (2011), \u201cEconomic production quantity model for randomly failing production process with minimal repair and imperfect maintenance\u201d, International Journal of Production Economics, Vol. 130 No. 1, pp. 118-124.","DOI":"10.1016\/j.ijpe.2010.12.004"},{"key":"key2021010301394530500_b19","doi-asserted-by":"crossref","unstructured":"Lin, G.C.\n                and \n                  Kroll, D.E.\n                (2006), \u201cEconomic lot sizing for an imperfect production system subject to random breakdowns\u201d, Engineering Optimization, Vol. 38 No. 1, pp. 73-92.","DOI":"10.1080\/03052150500270578"},{"key":"key2021010301394530500_b20","doi-asserted-by":"crossref","unstructured":"Lu, Z.Q.\n               , \n                  Zhang, Y.J.\n                and \n                  Han, X.L.\n                (2013), \u201cIntegrating run-based preventive maintenance into the capacitated lot sizing problem with reliability constraint\u201d, International Journal of Production Research, Vol. 51 No. 5, pp. 1379-1391.","DOI":"10.1080\/00207543.2012.693637"},{"key":"key2021010301394530500_b21","doi-asserted-by":"crossref","unstructured":"Najid, N.M.\n               , \n                  Alaoui, M.\n                and \n                  Mohafid, A.\n                (2011), \u201cAn integrated production and maintenance planning model with time windows and shortage cost\u201d, International Journal of Production Research, Vol. 49 No. 8, pp. 2265-2283.","DOI":"10.1080\/00207541003620386"},{"key":"key2021010301394530500_b22","doi-asserted-by":"crossref","unstructured":"Nikolopoulos, K.\n               , \n                  Metaxiotis, K.\n               , \n                  Lekatis, N.\n                and \n                  Assimakopoulos, V.\n                (2003), \u201cIntegrating industrial maintenance strategy into ERP\u201d, Industrial Management & Data Systems, Vol. 103 No. 3, pp. 184-191.","DOI":"10.1108\/02635570310465661"},{"key":"key2021010301394530500_b23","doi-asserted-by":"crossref","unstructured":"Nourelfath, M.\n               , \n                  Fitouhi, M.\n                and \n                  Machani, M.\n                (2010), \u201cAn integrated model for production and preventive maintenance planning in multi-state systems\u201d, IEEE Transactions on Reliability, Vol. 59 No. 3, pp. 496-506.","DOI":"10.1109\/TR.2010.2056412"},{"key":"key2021010301394530500_b24","doi-asserted-by":"crossref","unstructured":"Panagiotidou, S.\n                and \n                  Tagaras, G.\n                (2008), \u201cEvaluation of maintenance policies for equipment subject to quality shifts and failures\u201d, International Journal of Production Research, Vol. 46 No. 20, pp. 5761-5779.","DOI":"10.1080\/00207540601182260"},{"key":"key2021010301394530500_b25","doi-asserted-by":"crossref","unstructured":"Radhoui, M.\n               , \n                  Rezg, N.\n                and \n                  Chelby, A.\n                (2009), \u201cIntegrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems\u201d, International Journal of Production Research, Vol. 47 No. 2, pp. 389-402.","DOI":"10.1080\/00207540802426201"},{"key":"key2021010301394530500_b26","doi-asserted-by":"crossref","unstructured":"Rezg, N.\n               , \n                  Chelbi, A.\n                and \n                  Xie, X.\n                (2005), \u201cModeling and optimizing a joint inventory control and preventive maintenance strategy for a randomly failing production unit, analytical and simulation approaches\u201d, International Journal of Computer Integrated Manufacturing, Vol. 18 No. 2, pp. 225-235.","DOI":"10.1080\/0951192052000288152"},{"key":"key2021010301394530500_b27","doi-asserted-by":"crossref","unstructured":"Ruiz, R.\n               , \n                  Garc\u00eda-D\u00edaz, J.C.\n                and \n                  Maroto, C.\n                (2007), \u201cConsidering scheduling and preventive maintenance in the flow shop sequencing problem\u201d, Computers & Operations Research, Vol. 34 No. 11, pp. 3314-3330.","DOI":"10.1016\/j.cor.2005.12.007"},{"key":"key2021010301394530500_b28","doi-asserted-by":"crossref","unstructured":"Schmidt, G.\n                (2000), \u201cScheduling with limited machine availability\u201d, European Journal of Operational Research, Vol. 121 No. 1, pp. 1-15.","DOI":"10.1016\/S0377-2217(98)00367-1"},{"key":"key2021010301394530500_b29","doi-asserted-by":"crossref","unstructured":"Sitompul, C.\n                and \n                  Aghezzaf, E.H.\n                (2011), \u201cAn integrated hierarchical production and maintenance-planning model\u201d, Journal of Quality in Maintenance Engineering, Vol. 17 No. 3, pp. 299-314.","DOI":"10.1108\/13552511111157407"},{"key":"key2021010301394530500_b30","doi-asserted-by":"crossref","unstructured":"Wang, H.\n                (2002), \u201cA survey of maintenance policies of deteriorating systems\u201d, European Journal of Operational Research, Vol. 139 No. 3, pp. 469-489.","DOI":"10.1016\/S0377-2217(01)00197-7"},{"key":"key2021010301394530500_b31","doi-asserted-by":"crossref","unstructured":"Weinstein, L.\n                and \n                  Chung, C.H.\n                (1999), \u201cIntegrating maintenance and production decisions in a hierarchical production planning environment\u201d, Computers & Operations Research, Vol. 26 No. 10, pp. 1059-1074.","DOI":"10.1016\/S0305-0548(99)00022-2"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"http:\/\/www.emeraldinsight.com\/doi\/full-xml\/10.1108\/IMDS-07-2013-0314","content-type":"unspecified","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-07-2013-0314\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-07-2013-0314\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T21:52:37Z","timestamp":1753393957000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/114\/2\/162-182\/176192"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,3,4]]},"references-count":31,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2014,3,4]]}},"alternative-id":["10.1108\/IMDS-07-2013-0314"],"URL":"https:\/\/doi.org\/10.1108\/imds-07-2013-0314","relation":{},"ISSN":["0263-5577"],"issn-type":[{"type":"print","value":"0263-5577"}],"subject":[],"published":{"date-parts":[[2014,3,4]]}}}