{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,13]],"date-time":"2026-06-13T07:00:01Z","timestamp":1781334001482,"version":"3.54.1"},"reference-count":45,"publisher":"Emerald","issue":"4","license":[{"start":{"date-parts":[[2015,5,11]],"date-time":"2015-05-11T00:00:00Z","timestamp":1431302400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2015,5,11]]},"abstract":"<jats:sec>\n               <jats:title content-type=\"abstract-heading\">Purpose<\/jats:title>\n               <jats:p> \u2013 The purpose of this paper is to use lean principles and simulation optimization on solving a combined hospital emergency department (ED) layout design and staff assignment problem. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Design\/methodology\/approach<\/jats:title>\n               <jats:p> \u2013 This study is based on value stream mapping for the design and analysis of the ED. Subsequently, the authors investigate cellular manufacturing design, which addresses the decisions of continuous steps in a cell simultaneously and considers the optimal staff assignment. A simulation based on the case study is used for these methodologies. Simulation optimization is then used to optimize the staff assignments, minimize the waiting time and maximize the service level. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Findings<\/jats:title>\n               <jats:p> \u2013 The linear layout outperformed in both waiting time and service level. The patients\u2019 average waiting time is reduced from 78 to 38 minutes. The service level increased from 54.86 to 88.55 percent. Moreover, the number of nurses was reduced from nine to six. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Research limitations\/implications<\/jats:title>\n               <jats:p> \u2013 First, the tests for model accuracy were performed using the actual arrival rate; however, seasonal variation should be reflected. Second, the staffing levels varied were not tracked. Third, the accuracy of individual patient treatment paths can be dynamic. Fourth, the 25 percent of delays in transferring a patient to an inpatient bed will be discussed in future studies. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Practical implications<\/jats:title>\n               <jats:p> \u2013 A practical case is adopted for empirical illustrations. <\/jats:p>\n            <\/jats:sec>\n            <jats:sec>\n               <jats:title content-type=\"abstract-heading\">Originality\/value<\/jats:title>\n               <jats:p> \u2013 The proposed methodology innovatively solved a practical application and the results are promising.<\/jats:p>\n            <\/jats:sec>","DOI":"10.1108\/imds-10-2014-0296","type":"journal-article","created":{"date-parts":[[2015,5,13]],"date-time":"2015-05-13T04:01:26Z","timestamp":1431489686000},"page":"678-699","source":"Crossref","is-referenced-by-count":55,"title":["Lean principles and simulation optimization for emergency department layout design"],"prefix":"10.1108","volume":"115","author":[{"given":"Teng-Kuan","family":"Wang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Taho","family":"Yang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Chih-Yao","family":"Yang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Felix T.S.","family":"Chan","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"140","reference":[{"key":"key2020122421264619000_b1","doi-asserted-by":"crossref","unstructured":"Abdulmalek, F.A.\n                and \n                  Rajgopal, J.\n                (2007), \u201cAnalyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study\u201d, \n                  International Journal of Production Economics\n               , Vol. 107 No. 1, pp. 223-236.","DOI":"10.1016\/j.ijpe.2006.09.009"},{"key":"key2020122421264619000_b2","doi-asserted-by":"crossref","unstructured":"Affleck, A.\n               , \n                  Parks, P.\n               , \n                  Drummond, A.\n               , \n                  Rowe, B.H.\n                and \n                  Ovens, H.J.\n                (2013), \u201cEmergency department overcrowding and access block\u201d, \n                  Canadian Journal of Emergency Medicine\n               , Vol. 15 No. 6, pp. 359-370.","DOI":"10.1017\/S1481803500002451"},{"key":"key2020122421264619000_b3","doi-asserted-by":"crossref","unstructured":"Agarwal, A.\n                and \n                  Sarkis, J.\n                (1998), \u201cA review and analysis of comparative performance studies on functional and cellular manufacturing layouts\u201d, \n                  Computers & Industrial Engineering\n               , Vol. 34 No. 1, pp. 77-89.","DOI":"10.1016\/S0360-8352(97)00152-6"},{"key":"key2020122421264619000_b4","doi-asserted-by":"crossref","unstructured":"Albino, V.\n                and \n                  Garavelli, A.C.\n                (1998), \u201cSome effects of flexibility and dependability on cellular manufacturing system performance\u201d, \n                  Computers & Industrial Engineering\n               , Vol. 35 No. 3, pp. 491-494.","DOI":"10.1016\/S0360-8352(98)00141-7"},{"key":"key2020122421264619000_b5","doi-asserted-by":"crossref","unstructured":"Arkat, J.\n               , \n                  Farahani, M.H.\n               , and \n                  Hosseini, L.\n                (2012), \u201cIntegrating cell formation with cellular layout and operations scheduling\u201d, \n                  The International Journal of Advanced Manufacturing Technology\n               , Vol. 61 Nos 5-8, pp. 637-647.","DOI":"10.1007\/s00170-011-3733-4"},{"key":"key2020122421264619000_b6","doi-asserted-by":"crossref","unstructured":"Asplin, B.R.\n               , \n                  Magid, D.J.\n               , \n                  Rhodes, K.V.\n               , \n                  Solberg, L.I.\n               , \n                  Lurie, N.\n                and \n                  Camargo, C.A. Jr\n                (2003), \u201cA conceptual model of emergency department crowding\u201d, \n                  Annals of Emergency Medicine\n               , Vol. 42 No. 2, pp. 173-180.","DOI":"10.1067\/mem.2003.302"},{"key":"key2020122421264619000_b7","unstructured":"Baker, M.\n               , \n                  Taylor, I.\n                and \n                  Mitchell, A.\n                (2009), \n                  Making Hospitals Work: How to Improve Patient Care while Saving Everyone\u2019s Time and Hospitals\u2019 Resources\n               , Lean Enterprise Academy Limited, Goodrich."},{"key":"key2020122421264619000_b8","doi-asserted-by":"crossref","unstructured":"Beveridge, R.\n               , \n                  Ducharme, J.\n               , \n                  Janes, L.\n               , \n                  Beaulieu, S.\n                and \n                  Walter, S.\n                (1999), \u201cReliability of the Canadian emergency department triage and acuity scale: interrater agreement\u201d, \n                  Annals of Emergency Medicine\n               , Vol. 34 No. 2, pp. 155-159.","DOI":"10.1016\/S0196-0644(99)70223-4"},{"key":"key2020122421264619000_b9","doi-asserted-by":"crossref","unstructured":"Blackstone, J.H.\n               , \n                  Phillips, D.T.\n                and \n                  Hogg, G.L.\n                (1982), \u201cA state-of-the-art survey of dispatching rules for manufacturing job shop operations\u201d, \n                  The International Journal of Production Research\n               , Vol. 20 No. 1, pp. 27-45.","DOI":"10.1080\/00207548208947745"},{"key":"key2020122421264619000_b45","doi-asserted-by":"crossref","unstructured":"Boyle, A.\n               , \n                  Beniuk, K.\n               , \n                  Higginson, I.\n                and \n                  Atkinson, P.\n                (2012), \u201cEmergency department crowding: time for interventions and policy evaluations\u201d, \n                  Emergency Medicine International\n               , Article No. 838610, 8pp.","DOI":"10.1155\/2012\/838610"},{"key":"key2020122421264619000_b11","doi-asserted-by":"crossref","unstructured":"Derlet, R.W.\n                and \n                  Richards, J.R.\n                (2000), \u201cOvercrowding in the nation\u2019s emergency departments: complex causes and disturbing effects\u201d, \n                  Annals of Emergency Medicine\n               , Vol. 35 No. 1, pp. 63-68.","DOI":"10.1016\/S0196-0644(00)70105-3"},{"key":"key2020122421264619000_b12","doi-asserted-by":"crossref","unstructured":"Dickson, E.W.\n               , \n                  Anguelov, Z.\n               , \n                  Vetterick, D.\n               , \n                  Eller, A.\n                and \n                  Singh, S.\n                (2009), \u201cUse of lean in the emergency department: a case series of 4 hospitals\u201d, \n                  Annals of Emergency Medicine\n               , Vol. 54 No. 4, pp. 504-510.","DOI":"10.1016\/j.annemergmed.2009.03.024"},{"key":"key2020122421264619000_b14","doi-asserted-by":"crossref","unstructured":"Feld, W.M.\n                (2000), \n                  Lean Manufacturing: Tools, Techniques, and How to Use Them\n               , The St. Lucie Press, London.","DOI":"10.1201\/9781420025538"},{"key":"key2020122421264619000_b17","unstructured":"Gilboy, N.\n               , \n                  Tanabe, T.\n               , \n                  Travers, D.\n                and \n                  Rosenau, A.\n                (2011), \n                  Emergency Severity Index (ESI): A Triage Tool for Emergency Department Care, Version 4, Implementation Handbook 2012 Edition\n               , AHRQ Publication No. 12-0014, AHRQ, Rockville, MD."},{"key":"key2020122421264619000_b15","doi-asserted-by":"crossref","unstructured":"Glover, F.\n               , \n                  Kelly, J.P.\n                and \n                  Laguna, M.\n                (1996) \u201cNew advances and applications of combining simulation and optimization\u201d, Proceedings of the 28th Conference on Winter Simulation, Coronado, CA, December 8-11, pp. 144-152.","DOI":"10.1145\/256562.256595"},{"key":"key2020122421264619000_b16","unstructured":"Graban, M.\n                (2009), \n                  Lean Hospitals: Improving Quality, Patient Safety, and Employee Satisfaction\n               , CRC Press, Boca Raton, FL."},{"key":"key2020122421264619000_b18","doi-asserted-by":"crossref","unstructured":"Harhalakis, G.\n               , \n                  Ioannou, G.\n               , \n                  Minis, I.\n               , and \n                  Nagi, R.\n                (1994), \u201cManufacturing cell formation under random product demand\u201d, \n                  The International Journal of Production Research\n               , Vol. 32 No. 1, pp. 47-64.","DOI":"10.1080\/00207549408956915"},{"key":"key2020122421264619000_b21","doi-asserted-by":"crossref","unstructured":"Holden, R.J.\n                (2011), \u201cLean thinking in emergency departments: a critical review\u201d, \n                  Annals of Emergency Medicine\n               , Vol. 57 No. 3, pp. 265-278.","DOI":"10.1016\/j.annemergmed.2010.08.001"},{"key":"key2020122421264619000_b20","unstructured":"Hopp, W.J.\n                and \n                  Spearman, M.L.\n                (2008), \n                  Factory Physics\n               , 3rd ed., McGraw-Hill, New York, NY."},{"key":"key2020122421264619000_b22","unstructured":"Kelton, W.D.\n               , \n                  Sadowski, R.P.\n                and \n                  Swets, N.B.\n                (2010), \n                  Simulation with Arena\n               , 5th ed., McGraw-Hill, New York, NY."},{"key":"key2020122421264619000_b23","doi-asserted-by":"crossref","unstructured":"Logendran, R.\n                (1991), \u201cImpact of sequence of operations and layout of cells in cellular manufacturing\u201d, \n                  The International Journal of Production Research\n               , Vol. 29 No. 2, pp. 375-390.","DOI":"10.1080\/00207549108930077"},{"key":"key2020122421264619000_b24","doi-asserted-by":"crossref","unstructured":"Lu, J.-C.\n               , \n                  Yang, T.\n                and \n                  Su, C.T.\n                (2012), \u201cAnalysing optimum push\/pull junction point location using multiple criteria decision-making for multistage stochastic production system\u201d, \n                  International Journal of Production Research\n               , Vol. 50 No. 19, pp. 5523-5537.","DOI":"10.1080\/00207543.2011.648778"},{"key":"key2020122421264619000_b25","doi-asserted-by":"crossref","unstructured":"Lu, J.-C.\n               , \n                  Yang, T.\n                and \n                  Wang, C.-Y.\n                (2011), \u201cA lean pull system design analysed by value stream mapping and multiple criteria decision-making method under demand uncertainty\u201d, \n                  International Journal of Computer Integrated Manufacturing\n               , Vol. 24 No. 3, pp. 211-228.","DOI":"10.1080\/0951192X.2010.551283"},{"key":"key2020122421264619000_b26","doi-asserted-by":"crossref","unstructured":"Malakooti, B.\n               , \n                  Malakooti, N.R.\n                and \n                  Yang, Z.\n                (2004), \u201cIntegrated group technology, cell formation, process planning, and production planning with application to the emergency room\u201d, \n                  International Journal of Production Research\n               , Vol. 42 No. 9, pp. 1769-1786.","DOI":"10.1080\/00207540310001652851"},{"key":"key2020122421264619000_b27","unstructured":"Monden, Y.\n                (2011), \n                  Toyota Production System: An Integrated Approach to Just-in-Time\n               , 4th ed., CRC Press, Boca Raton, FL."},{"key":"key2020122421264619000_b28","unstructured":"Niska, R.\n               , \n                  Bhuiya, F.\n                and \n                  Xu, J.\n                (2010), \u201cNational hospital ambulatory medical care survey: 2007 emergency department summary\u201d, \n                  National Center for Health Statistics Report\n               , Vol. 26 No. 26, pp. 1-31."},{"key":"key2020122421264619000_b29","doi-asserted-by":"crossref","unstructured":"Olshaker, J.S.\n                (2009), \u201cManaging emergency department overcrowding\u201d, \n                  Emergency Medicine Clinics of North America\n               , Vol. 27 No. 4, pp. 593-603.","DOI":"10.1016\/j.emc.2009.07.004"},{"key":"key2020122421264619000_b30","doi-asserted-by":"crossref","unstructured":"Pattanaik, L.\n                and \n                  Sharma, B.\n                (2009), \u201cImplementing lean manufacturing with cellular layout: a case study\u201d, \n                  The International Journal of Advanced Manufacturing Technology\n               , Vol. 42 Nos 7-8, pp. 772-779.","DOI":"10.1007\/s00170-008-1629-8"},{"key":"key2020122421264619000_b32","unstructured":"Rother, M.\n                and \n                  Harris, R.\n                (2003), \n                  Creating Continuous Flow: An Action Guide for Managers, Engineers & Production Associates\n               , Lean Enterprise Institute, Cambridge, MA."},{"key":"key2020122421264619000_b33","unstructured":"Rother, M.\n                and \n                  Shook, J.\n                (1998), \n                  Learning to See: Value Stream Mapping to Add Value and Eliminate Muda\n               , Lean Enterprise Institute, Cambridge, MA."},{"key":"key2020122421264619000_b34","doi-asserted-by":"crossref","unstructured":"Ruiz-de-Arbulo-Lopez, P.\n               , \n                  Fortuny-Santos, J.\n                and \n                  Cuatrecasas-Arb\u00f3s, L.\n                (2013), \u201cLean manufacturing: costing the value stream\u201d, \n                  Industrial Management & Data Systems\n               , Vol. 113 No. 5, pp. 647-668.","DOI":"10.1108\/02635571311324124"},{"key":"key2020122421264619000_b35","unstructured":"Schull, M.J.\n               , \n                  Morrison, L.J.\n               , \n                  Vermeulen, M.\n                and \n                  Redelmeier, D.A.\n                (2003), \u201cEmergency department overcrowding and ambulance transport delays for patients with chest pain\u201d, \n                  Canadian Medical Association Journal\n               , Vol. 168 No. 3, pp. 277-283."},{"key":"key2020122421264619000_b36","doi-asserted-by":"crossref","unstructured":"Sinreich, D.\n                and \n                  Marmor, Y.\n                (2005), \u201cEmergency department operations: the basis for developing a simulation tool\u201d, \n                  IIE Transactions\n               , Vol. 37 No. 3, pp. 233-245.","DOI":"10.1080\/07408170590899625"},{"key":"key2020122421264619000_b37","unstructured":"Tapping, D.\n               , \n                  Kozowski, S.\n               , \n                  Archbold, L.\n                and \n                  Sperl, T.\n                (2009), \n                  Value Stream Management for Lean Healthcare\n               , MCS Media, Chelsea, MI."},{"key":"key2020122421264619000_b38","doi-asserted-by":"crossref","unstructured":"Treleven, M.\n                (1989), \u201cA review of the dual resource constrained system research\u201d, \n                  IIE Transactions\n               , Vol. 21 No. 3, pp. 279-287.","DOI":"10.1080\/07408178908966233"},{"key":"key2020122421264619000_b39","doi-asserted-by":"crossref","unstructured":"Ujvari, S.\n                and \n                  Hilmola, O.-P.\n                (2006), \u201cAdvanced manufacturing simulation: minor system details can be major issues in the real world\u201d, \n                  Industrial Management & Data Systems\n               , Vol. 106 No. 8, pp. 1166-1186.","DOI":"10.1108\/02635570610710818"},{"key":"key2020122421264619000_b40","doi-asserted-by":"crossref","unstructured":"Welch, S.J.\n                and \n                  Davidson, S.J.\n                (2011), \u201cThe performance limits of traditional triage\u201d, \n                  Annals of Emergency Medicine\n               , Vol. 58 No. 2, pp. 143-144.","DOI":"10.1016\/j.annemergmed.2011.04.017"},{"key":"key2020122421264619000_b41","unstructured":"Womack, J.P.\n               , \n                  Jones, D.T.\n                and \n                  Roos, D.\n                (1990), \n                  The Machine that Changed the World\n               , Free Press, New York, NY."},{"key":"key2020122421264619000_b43","doi-asserted-by":"crossref","unstructured":"Yang, T.\n               , \n                  Fu, H.-P.\n                and \n                  Yang, K.-Y.\n                (2007), \u201cAn evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy \u2013 a case study\u201d, \n                  International Journal of Production Economics\n               , Vol. 107 No. 1, pp. 104-114.","DOI":"10.1016\/j.ijpe.2006.02.014"},{"key":"key2020122421264619000_b44","doi-asserted-by":"crossref","unstructured":"Yang, T.\n                and \n                  Lu, J.-C.\n                (2011), \u201cThe use of a multiple attribute decision-making method and value stream mapping in solving the pacemaker location problem\u201d, \n                  International Journal of Production Research\n               , Vol. 49 No. 10, pp. 2793-2817.","DOI":"10.1080\/00207541003801267"},{"key":"key2020122421264619000_frd1","doi-asserted-by":"crossref","unstructured":"Chen, M.\n                (1998), \u201cA mathematical programming model for system reconfiguration in a dynamic cellular manufacturing environment\u201d, \n                  Annals of Operations Research\n               , Vol. 77, pp. 109-128.","DOI":"10.1023\/A:1018917109580"},{"key":"key2020122421264619000_frd2","doi-asserted-by":"crossref","unstructured":"Fatovich, D.\n               , \n                  Nagree, Y.\n                and \n                  Sprivulis, P.\n                (2005), \u201cAccess block causes emergency department overcrowding and ambulance diversion in Perth, Western Australia\u201d, \n                  Emergency Medicine Journal\n               , Vol. 22 No. 5, pp. 351-354.","DOI":"10.1136\/emj.2004.018002"},{"key":"key2020122421264619000_frd3","doi-asserted-by":"crossref","unstructured":"Harhalakis, G.\n               , \n                  Nagi, R.\n                and \n                  Proth, J.\n                (1990), \u201cAn efficient heuristic in manufacturing cell formation for group technology applications\u201d, \n                  The International Journal of Production Research\n               , Vol. 28 No. 1, pp. 185-198.","DOI":"10.1080\/00207549008942692"},{"key":"key2020122421264619000_frd4","doi-asserted-by":"crossref","unstructured":"Pines, J.M.\n               , \n                  Iyer, S.\n               , \n                  Disbot, M.\n               , \n                  Hollander, J.E.\n               , \n                  Shofer, F.S.\n                and \n                  Datner, E.M.\n                (2008), \u201cThe effect of emergency department crowding on patient satisfaction for admitted patients\u201d, \n                  Academic Emergency Medicine\n               , Vol. 15 No. 9, pp. 825-831.","DOI":"10.1111\/j.1553-2712.2008.00200.x"},{"key":"key2020122421264619000_frd5","doi-asserted-by":"crossref","unstructured":"Wu, X.\n               , \n                  Chu, C.-H.\n               , \n                  Wang, Y.\n                and \n                  Yue, D.\n                (2007), \u201cGenetic algorithms for integrating cell formation with machine layout and scheduling\u201d, \n                  Computers & Industrial Engineering\n               , Vol. 53 No. 2, pp. 277-289.","DOI":"10.1016\/j.cie.2007.06.021"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-10-2014-0296\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-10-2014-0296\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T21:53:40Z","timestamp":1753394020000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/115\/4\/678-699\/178532"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,5,11]]},"references-count":45,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2015,5,11]]}},"alternative-id":["10.1108\/IMDS-10-2014-0296"],"URL":"https:\/\/doi.org\/10.1108\/imds-10-2014-0296","relation":{},"ISSN":["0263-5577"],"issn-type":[{"value":"0263-5577","type":"print"}],"subject":[],"published":{"date-parts":[[2015,5,11]]}}}