{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,8,11]],"date-time":"2026-08-11T03:57:34Z","timestamp":1786420654914,"version":"3.56.0"},"reference-count":38,"publisher":"Emerald","issue":"12","license":[{"start":{"date-parts":[[2021,9,3]],"date-time":"2021-09-03T00:00:00Z","timestamp":1630627200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IMDS"],"published-print":{"date-parts":[[2021,11,10]]},"abstract":"<jats:sec><jats:title content-type=\"abstract-subheading\">Purpose<\/jats:title><jats:p>This paper proposes an evaluation model for prefabricated construction to guide a supply chain with controllable costs. Prefabricated construction is prevalent due to area limitations. Nevertheless, the development is limited by budget control and identifying the factors affecting cost. The degree of close collaboration in the supply chain is closely interconnected with cost performance that includes direct and indirect factors. This paper not only quantizes these factors but also distinguishes the degree of influence of various factors.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Design\/methodology\/approach<\/jats:title><jats:p>System dynamics is applied to simulate and analyze the construction cost factors through Vensim software. It can also clarify the relationship between cost and other influencing factors. The input data are collected from an Internet of Things (IoT)-enabled system under a Building Information Modeling (BIM) system and Hong Kong government reports.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Findings<\/jats:title><jats:p>Simulation results indicate that prefabricated construction cost is mainly influenced by government promotion degree (GPD), working pressure from on-site construction (WPOSC), prefab quality (PQ), load-bearing capacity per vehicle (LBPV) and mold quality (MQ). However, it is more sensitive toward GPD, which indicates that the government should take measures to promote this construction technology. On-site worker management is also essential for the assembly process and indirectly influences the construction cost.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Research limitations\/implications<\/jats:title><jats:p>This paper quantifies indirect influential factors to clarify the specific features for prefabricated construction. The investigated factors are limited.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Practical implications<\/jats:title><jats:p>The contractor can identify all factors and classify the levels of influence to make decisions under the supply chain system boundary.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Social implications<\/jats:title><jats:p>The input data are collected from an IoT-enabled system under a BIM system and Hong Kong government reports. Thus, the relationship between construction cost influential factors can be investigated.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Originality\/value<\/jats:title><jats:p>This paper quantifies indirect influencing factors and clarifies the specific features in prefabricated construction. The contractor could identify these factors to make decisions and classify the levels of influence under the supply chain system boundary.<\/jats:p><\/jats:sec>","DOI":"10.1108\/imds-12-2020-0735","type":"journal-article","created":{"date-parts":[[2021,9,1]],"date-time":"2021-09-01T13:48:05Z","timestamp":1630504085000},"page":"2738-2759","source":"Crossref","is-referenced-by-count":41,"title":["A cost evaluation model for IoT-enabled prefabricated construction supply chain management"],"prefix":"10.1108","volume":"121","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-6473-5223","authenticated-orcid":false,"given":"Wennan","family":"Zhang","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3142-5883","authenticated-orcid":false,"given":"Kai","family":"Kang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3011-2009","authenticated-orcid":false,"given":"Ray Y.","family":"Zhong","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"140","published-online":{"date-parts":[[2021,9,3]]},"reference":[{"issue":"3","key":"key2021111212440711200_ref001","doi-asserted-by":"crossref","first-page":"241","DOI":"10.1061\/(ASCE)LM.1943-5630.0000127","article-title":"Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry","volume":"11","year":"2011","journal-title":"Leadership and Management in Engineering"},{"issue":"3","key":"key2021111212440711200_ref002","doi-asserted-by":"crossref","first-page":"340","DOI":"10.1108\/02635571211210022","article-title":"Improving RFID traceability systems with verifiable quality","volume":"112","year":"2012","journal-title":"Industrial Management and Data Systems"},{"issue":"1","key":"key2021111212440711200_ref003","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1061\/(ASCE)AE.1943-5568.0000091","article-title":"Off-site construction of apartment buildings","volume":"19","year":"2013","journal-title":"Journal of Architectural Engineering"},{"issue":"2","key":"key2021111212440711200_ref004","doi-asserted-by":"crossref","first-page":"331","DOI":"10.1016\/j.dss.2009.09.001","article-title":"Comparative study of adaptability and flexibility in distributed manufacturing supply chains","volume":"48","year":"2010","journal-title":"Decision Support Systems"},{"issue":"4","key":"key2021111212440711200_ref005","doi-asserted-by":"crossref","first-page":"557","DOI":"10.1016\/j.indmarman.2012.04.002","article-title":"Green marketing and its impact on supply chain management in industrial markets","volume":"41","year":"2012","journal-title":"Industrial Marketing Management"},{"key":"key2021111212440711200_ref006","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1007\/s10479-020-03615-7","article-title":"Supply chain financing using blockchain: impacts on supply chains selling fashionable products","year":"2020","journal-title":"Annals of Operations Research"},{"issue":"ahead-of-print","key":"key2021111212440711200_ref007","doi-asserted-by":"publisher","DOI":"10.1108\/IMDS-01-2020-0016","article-title":"Improving supply chain collaboration through operational excellence approaches: an IoT perspective","volume":"ahead-of-print","year":"2020","journal-title":"Industrial Management and Data Systems"},{"issue":"2","key":"key2021111212440711200_ref008","doi-asserted-by":"crossref","first-page":"184","DOI":"10.1108\/02635571111115137","article-title":"Demand-supply chain management: industrial survival recipe for new decade","volume":"111","year":"2011","journal-title":"Industrial Management and Data Systems"},{"issue":"10","key":"key2021111212440711200_ref009","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.1080\/01446193.2010.498481","article-title":"Design issues of using prefabrication in Hong Kong building construction","volume":"28","year":"2010","journal-title":"Construction Management and Economics"},{"issue":"9","key":"key2021111212440711200_ref010","doi-asserted-by":"crossref","first-page":"1166","DOI":"10.1108\/02635570911002252","article-title":"RFID-based intra-supply chain in textile industry","volume":"109","year":"2009","journal-title":"Industrial Management and Data Systems"},{"issue":"4","key":"key2021111212440711200_ref011","doi-asserted-by":"crossref","first-page":"602","DOI":"10.1016\/j.ijproman.2012.10.003","article-title":"Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects","volume":"31","year":"2013","journal-title":"International Journal of Project Management"},{"issue":"1","key":"key2021111212440711200_ref012","doi-asserted-by":"crossref","first-page":"108","DOI":"10.1016\/j.aei.2012.11.004","article-title":"Information lifecycle management with RFID for material control on construction sites","volume":"27","year":"2013","journal-title":"Advanced Engineering Informatics"},{"key":"key2021111212440711200_ref013","doi-asserted-by":"crossref","first-page":"692","DOI":"10.1016\/j.jclepro.2016.11.028","article-title":"Schedule risk modeling in prefabrication housing production","volume":"153","year":"2017","journal-title":"Journal of Cleaner Production"},{"key":"key2021111212440711200_ref014","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1016\/j.autcon.2018.01.001","article-title":"An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction","volume":"89","year":"2018","journal-title":"Automation in Construction"},{"key":"key2021111212440711200_ref015","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1016\/j.autcon.2018.12.024","article-title":"Integrating building information modeling and prefabrication housing production","volume":"100","year":"2019","journal-title":"Automation in Construction"},{"key":"key2021111212440711200_ref016","doi-asserted-by":"crossref","first-page":"118309","DOI":"10.1016\/j.jclepro.2019.118309","article-title":"A system dynamics approach to determine construction waste disposal charge in Hong Kong","volume":"241","year":"2019","journal-title":"Journal of Cleaner Production"},{"issue":"13","key":"key2021111212440711200_ref017","doi-asserted-by":"crossref","first-page":"4524","DOI":"10.1080\/00207543.2017.1401233","article-title":"A survey of semiconductor supply chain models part I: semiconductor supply chains, strategic network design, and supply chain simulation","volume":"56","year":"2018","journal-title":"International Journal of Production Research"},{"issue":"3","key":"key2021111212440711200_ref018","article-title":"An SCO-enabled logistics and supply chain\u2013management system in construction","volume":"143","year":"2017","journal-title":"Journal of Construction Engineering and Management"},{"issue":"7","key":"key2021111212440711200_ref019","doi-asserted-by":"crossref","first-page":"1413","DOI":"10.1108\/IMDS-09-2017-0422","article-title":"Managing supply chain risks and delays in construction project","volume":"118","year":"2018","journal-title":"Industrial Management and Data Systems"},{"issue":"9","key":"key2021111212440711200_ref020","doi-asserted-by":"crossref","first-page":"1297","DOI":"10.1108\/02635571011087400","article-title":"Collaborative performance measurement in supply chain","volume":"110","year":"2010","journal-title":"Industrial Management and Data Systems"},{"issue":"2","key":"key2021111212440711200_ref021","doi-asserted-by":"crossref","first-page":"357","DOI":"10.1016\/j.ijpe.2012.03.012","article-title":"Measuring supply chain cost","volume":"143","year":"2013","journal-title":"International Journal of Production Economics"},{"key":"key2021111212440711200_ref022","volume-title":"Value and Benefits Assessment of Modular Construction","year":"2000"},{"issue":"2","key":"key2021111212440711200_ref023","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1016\/j.aei.2009.09.001","article-title":"Systems integration and collaboration in architecture, engineering, construction, and facilities management: a review","volume":"24","year":"2010","journal-title":"Advanced Engineering Informatics"},{"key":"key2021111212440711200_ref024","volume-title":"Offsite Architecture: Constructing the Future","year":"2017"},{"key":"key2021111212440711200_ref025","volume-title":"Prefab Architecture: A Guide to Modular Design and Construction","year":"2010"},{"key":"key2021111212440711200_ref026","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.jclepro.2014.05.076","article-title":"A system dynamics model based on evolutionary game theory for green supply chain management diffusion among Chinese manufacturers","volume":"80","year":"2014","journal-title":"Journal of Cleaner Production"},{"issue":"1","key":"key2021111212440711200_ref027","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1108\/IJLM-11-2016-0274","article-title":"An exploratory study of internet of things (IoT) adoption intention in logistics and supply chain management: a mixed research approach","volume":"29","year":"2018","journal-title":"The International Journal of Logistics Management"},{"key":"key2021111212440711200_ref028","first-page":"6134","article-title":"Impact of shale gas development on regional water quality","volume":"340","year":"2013","journal-title":"Science"},{"key":"key2021111212440711200_ref029","doi-asserted-by":"crossref","first-page":"109","DOI":"10.1016\/j.autcon.2013.10.023","article-title":"Building information modeling (BIM) for existing buildings\u2014literature review and future needs","volume":"38","year":"2014","journal-title":"Automation in Construction"},{"issue":"1","key":"key2021111212440711200_ref030","article-title":"System dynamics approach for investigating the risk effects on schedule delay in infrastructure projects","volume":"33","year":"2017","journal-title":"Journal of Management in Engineering"},{"key":"key2021111212440711200_ref031","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/j.autcon.2018.05.012","article-title":"Cloud asset-enabled integrated IoT platform for lean prefabricated construction","volume":"93","year":"2018","journal-title":"Automation in Construction"},{"issue":"3","key":"key2021111212440711200_ref032","doi-asserted-by":"crossref","first-page":"988","DOI":"10.1016\/j.ejor.2014.02.034","article-title":"A system dynamics model for determining the waste disposal charging fee in construction","volume":"237","year":"2014","journal-title":"European Journal of Operational Research"},{"issue":"14","key":"key2021111212440711200_ref033","doi-asserted-by":"crossref","first-page":"3984","DOI":"10.1080\/00207543.2016.1231432","article-title":"Production lead-time hedging and coordination in prefabricated construction supply chain management","volume":"55","year":"2017","journal-title":"International Journal of Production Research"},{"key":"key2021111212440711200_ref034","doi-asserted-by":"crossref","first-page":"107792","DOI":"10.1016\/j.ijpe.2020.107792","article-title":"Spatial-temporal hedging coordination in prefabricated housing production","volume":"229","year":"2020","journal-title":"International Journal of Production Economics"},{"key":"key2021111212440711200_ref035","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/j.autcon.2017.01.006","article-title":"Prefabricated construction enabled by the Internet-of-Things","volume":"76","year":"2017","journal-title":"Automation in Construction"},{"issue":"9","key":"key2021111212440711200_ref036","doi-asserted-by":"crossref","first-page":"2610","DOI":"10.1080\/00207543.2015.1086037","article-title":"Big data analytics for physical internet-based intelligent manufacturing shop floors","volume":"55","year":"2017","journal-title":"International Journal of Production Research"},{"key":"key2021111212440711200_fur1","doi-asserted-by":"crossref","first-page":"246","DOI":"10.1016\/j.enbuild.2014.07.096","article-title":"On the development of multi-linear regression analysis to assess energy consumption in the early stages of building design","volume":"85","year":"2014","journal-title":"Energy and Buildings"},{"key":"key2021111212440711200_fur2","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/j.ijpe.2015.08.004","article-title":"A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost","volume":"169","year":"2015","journal-title":"International Journal of Production Economics"}],"container-title":["Industrial Management &amp; Data Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-12-2020-0735\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/IMDS-12-2020-0735\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T21:54:23Z","timestamp":1753394063000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/imds\/article\/121\/12\/2738-2759\/510873"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,9,3]]},"references-count":38,"journal-issue":{"issue":"12","published-online":{"date-parts":[[2021,9,3]]},"published-print":{"date-parts":[[2021,11,10]]}},"alternative-id":["10.1108\/IMDS-12-2020-0735"],"URL":"https:\/\/doi.org\/10.1108\/imds-12-2020-0735","relation":{},"ISSN":["0263-5577"],"issn-type":[{"value":"0263-5577","type":"print"}],"subject":[],"published":{"date-parts":[[2021,9,3]]}}}