{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,17]],"date-time":"2025-10-17T19:58:42Z","timestamp":1760731122129,"version":"3.41.2"},"reference-count":53,"publisher":"Emerald","issue":"3","license":[{"start":{"date-parts":[[2019,3,4]],"date-time":"2019-03-04T00:00:00Z","timestamp":1551657600000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["K"],"published-print":{"date-parts":[[2019,3,4]]},"abstract":"<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Purpose<\/jats:title>\n<jats:p>This study considers a project scheduling model to assess the project risks and the impacts on project sustainability when subcontractors collaborate under uncertainty. Moreover, some allocation methods are applied for fair allocating utility of the project and supper-additivity, stability and satisfaction level of each coalition. Finally, sustainability concept is considered in risk assessment in all coalitions.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Design\/methodology\/approach<\/jats:title>\n<jats:p>The proposed mathematical programming model evaluates project risks when the subcontractors cooperate with each other by sharing their limited resources. Then, some cooperative game theory methods are applied for fair allocation of net present value, of the cooperation and finally sustainability aspects (economic, social and environmental) are investigated in risk assessment for each possible coalition.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Finding<\/jats:title>\n<jats:p>The results of the proposed model indicate that the subcontractors can increase their profit by 10 per cent ($14,028,450 thousand) and save the equilibrium between sustainability aspects especially in grand coalition. It means that subcontractors do not have incentive to leave the coalition and the supper-additive property is feasible. Furthermore, risk assessment shows that project risks have less impact on subcontractor profits when they cooperate with each other.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Originality\/value<\/jats:title>\n<jats:p>Sustainability aspects may be investigated in project management in previous studies, but the authors study sustainability indicators when subcontractors form a coalition and share their resources in response to the risks of availability to resources and delay in completing the project under uncertainty.<\/jats:p>\n<\/jats:sec>","DOI":"10.1108\/k-02-2018-0094","type":"journal-article","created":{"date-parts":[[2018,10,8]],"date-time":"2018-10-08T07:16:30Z","timestamp":1538982990000},"page":"385-406","source":"Crossref","is-referenced-by-count":5,"title":["Sustainability risk management in a cooperative environment under uncertainty"],"prefix":"10.1108","volume":"48","author":[{"given":"Mojtaba","family":"Moradi","sequence":"first","affiliation":[]},{"given":"Ashkan","family":"Hafezalkotob","sequence":"additional","affiliation":[]},{"given":"Vahidreza","family":"Ghezavati","sequence":"additional","affiliation":[]}],"member":"140","reference":[{"issue":"1","key":"key2020092415500626000_ref001","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1108\/K-04-2015-0106","article-title":"A TOPSIS extension framework for re-conceptualizing sustainability measurement","volume":"45","year":"2016","journal-title":"Kybernetes"},{"issue":"1","key":"key2020092415500626000_ref002","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1007\/s10951-014-0393-x","article-title":"Nash equilibria for the multi-agent project scheduling problem with controllable processing times","volume":"18","year":"2015","journal-title":"Journal of Scheduling"},{"issue":"1","key":"key2020092415500626000_ref003","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1111\/j.1540-6296.2009.01152.x","article-title":"Sustainability risk management","volume":"12","year":"2009","journal-title":"Risk Management and Insurance Review"},{"issue":"3","key":"key2020092415500626000_ref004","first-page":"04013066","article-title":"Cooperative game theoretic framework for joint resource management in construction","volume":"140","year":"2013","journal-title":"Journal of Construction Engineering and Management"},{"key":"key2020092415500626000_ref005","doi-asserted-by":"crossref","first-page":"709","DOI":"10.1016\/j.sbspro.2015.11.491","article-title":"Game theory as a tool of project management","volume":"213","year":"2015","journal-title":"Procedia-Social and Behavioral Sciences"},{"issue":"1","key":"key2020092415500626000_ref006","doi-asserted-by":"crossref","first-page":"153","DOI":"10.1061\/(ASCE)0733-9364(2004)130:1(153)","article-title":"Factors affecting the success of a construction project","volume":"130","year":"2004","journal-title":"Journal of Construction Engineering and Management"},{"issue":"8","key":"key2020092415500626000_ref007","doi-asserted-by":"crossref","first-page":"841","DOI":"10.1080\/01446190110089727","article-title":"Subcontractor perspectives on supply chain alliances","volume":"19","year":"2001","journal-title":"Construction Management and Economics"},{"key":"key2020092415500626000_ref008","first-page":"1","article-title":"Introduction to sustainability assessment at the local level","volume-title":"How Green Is the City","year":"2001"},{"issue":"6","key":"key2020092415500626000_ref009","doi-asserted-by":"crossref","first-page":"864","DOI":"10.1108\/03684921011046627","article-title":"Study on risk assessment of water security of drought periods based on entropy weight methods","volume":"39","year":"2010","journal-title":"Kybernetes"},{"issue":"2","key":"key2020092415500626000_ref010","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1002\/bse.323","article-title":"Beyond the business case for corporate sustainability","volume":"11","year":"2002","journal-title":"Business Strategy and the Environment"},{"issue":"6","key":"key2020092415500626000_ref011","doi-asserted-by":"crossref","first-page":"1193","DOI":"10.1016\/j.ecolind.2010.04.009","article-title":"A methodology to identify sustainability indicators in construction project management \u2013 application to infrastructure projects in Spain","volume":"10","year":"2010","journal-title":"Ecological Indicators"},{"key":"key2020092415500626000_ref012","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1016\/j.bej.2016.06.007","article-title":"A framework for techno-economic and environmental sustainability analysis by risk assessment for conceptual process evaluation","volume":"116","year":"2016","journal-title":"Biochemical Engineering Journal"},{"issue":"2","key":"key2020092415500626000_ref013","first-page":"105","article-title":"A fuzzy leader-follower game approach to interaction of project client and multiple contractors in time\/cost trade-off problem","volume":"3","year":"2018","journal-title":"Journal of Project Management"},{"key":"key2020092415500626000_ref014","doi-asserted-by":"crossref","first-page":"593","DOI":"10.1016\/j.amc.2014.10.080","article-title":"Cooperative maximum-flow problem under uncertainty in logistic networks","volume":"250","year":"2015","journal-title":"Applied Mathematics and Computation"},{"key":"key2020092415500626000_ref015","first-page":"1","article-title":"Multi-resource trade-off problem of the project contractors in a cooperative environment: highway construction case study","year":"2017","journal-title":"International Journal of Management Science and Engineering Management"},{"key":"key2020092415500626000_ref016","first-page":"1","article-title":"The risk breakdown structure (RBS) as an aid to effective risk management","volume-title":"In 5th European Project Management Conference","year":"2002"},{"issue":"3","key":"key2020092415500626000_ref017","doi-asserted-by":"crossref","first-page":"445","DOI":"10.3846\/20294913.2011.580578","article-title":"Contribution-based profit-sharing scheme for joint ventures: Pelno pasidalijimo tarp \u012fmoni\u0173 schema, pagr\u012fsta patirtomis i\u0161laidomis","volume":"17","year":"2011","journal-title":"Technological and Economic Development of Economy"},{"issue":"5","key":"key2020092415500626000_ref018","article-title":"Implications of \u2018victim pays\u2019 infeasibilities for interconnected games with an illustration for aquifer sharing under unequal access costs","volume":"40","year":"2004","journal-title":"Water Resources Research"},{"issue":"6","key":"key2020092415500626000_ref019","doi-asserted-by":"crossref","first-page":"325","DOI":"10.1016\/S0263-7863(00)00014-4","article-title":"Risk and its management in the Kuwaiti construction industry: a contractors\u2019 perspective","volume":"19","year":"2001","journal-title":"International Journal of Project Management"},{"issue":"17","key":"key2020092415500626000_ref020","doi-asserted-by":"crossref","first-page":"1838","DOI":"10.1016\/j.jclepro.2008.02.008","article-title":"Envisioning sustainability three-dimensionally","volume":"16","year":"2008","journal-title":"Journal of Cleaner Production"},{"issue":"2","key":"key2020092415500626000_ref021","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1061\/(ASCE)0733-9364(2000)126:2(130)","article-title":"Using risk analysis to determine construction project contingencies","volume":"126","year":"2000","journal-title":"Journal of Construction Engineering and Management"},{"key":"key2020092415500626000_ref022","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.jclepro.2015.03.020","article-title":"Using project management as a way to sustainability: from a comprehensive review to a framework definition","volume":"99","year":"2015","journal-title":"Journal of Cleaner Production"},{"issue":"1","key":"key2020092415500626000_ref023","doi-asserted-by":"crossref","first-page":"8","DOI":"10.1061\/(ASCE)0733-9364(1999)125:1(8)","article-title":"Risk assessment in construction schedules","volume":"125","year":"1999","journal-title":"Journal of Construction Engineering and Management"},{"issue":"3","key":"key2020092415500626000_ref024","doi-asserted-by":"crossref","first-page":"320","DOI":"10.1016\/j.ijproman.2017.01.010","article-title":"Project risk management: a deterministic quantitative technique for assessment and mitigation","volume":"35","year":"2017","journal-title":"International Journal of Project Management"},{"issue":"5","key":"key2020092415500626000_ref025","doi-asserted-by":"crossref","first-page":"518","DOI":"10.1061\/(ASCE)0733-9364(2003)129:5(518)","article-title":"Evaluating risk in construction\u2013schedule model (ERIC\u2013S): construction schedule risk model","volume":"129","year":"2003","journal-title":"Journal of Construction Engineering and Management"},{"issue":"5","key":"key2020092415500626000_ref026","doi-asserted-by":"crossref","first-page":"694","DOI":"10.1108\/03684921011043198","article-title":"A review of enterprise risk management in supply chain","volume":"39","year":"2010","journal-title":"Kybernetes"},{"issue":"2","key":"key2020092415500626000_ref027","doi-asserted-by":"crossref","first-page":"229","DOI":"10.1016\/j.buildenv.2003.08.018","article-title":"Risk analysis in fixed-price design\u2013build construction projects","volume":"39","year":"2004","journal-title":"Building and Environment"},{"issue":"6\/7","key":"key2020092415500626000_ref028","doi-asserted-by":"crossref","first-page":"984","DOI":"10.1108\/K-12-2014-0291","article-title":"Integrated sustainability management for organizations","volume":"44","year":"2015","journal-title":"Kybernetes"},{"issue":"2","key":"key2020092415500626000_ref029","doi-asserted-by":"crossref","first-page":"239","DOI":"10.1016\/j.buildenv.2004.07.007","article-title":"Potential benefits for collaborating formwork subcontractors based on co-operative game theory","volume":"40","year":"2005","journal-title":"Building and Environment"},{"issue":"11","key":"key2020092415500626000_ref030","doi-asserted-by":"crossref","first-page":"885","DOI":"10.1061\/(ASCE)0733-9364(2008)134:11(885)","article-title":"Methodology for integrated risk management and proactive scheduling of construction projects","volume":"134","year":"2008","journal-title":"Journal of Construction Engineering and Management"},{"key":"key2020092415500626000_ref031","first-page":"14","article-title":"Sustainable management of construction projects","volume-title":"In \u201cCIB world building congress\u201d, construction for development","year":"2007"},{"issue":"5","key":"key2020092415500626000_ref032","doi-asserted-by":"crossref","first-page":"752","DOI":"10.1111\/j.1539-6924.2008.01187.x","article-title":"An integrated methodology for assessment and selection of the project risk response actions","volume":"29","year":"2009","journal-title":"Risk Analysis : an Official Publication of the Society for Risk Analysis"},{"issue":"2","key":"key2020092415500626000_ref033","doi-asserted-by":"crossref","first-page":"40","DOI":"10.4236\/jhrss.2014.22005","article-title":"Sustainability in project management competencies: analyzing the competence gap of project managers","volume":"2","year":"2014","journal-title":"Journal of Human Resource and Sustainability Studies"},{"issue":"3","key":"key2020092415500626000_ref034","doi-asserted-by":"crossref","first-page":"263","DOI":"10.1007\/s10551-005-7054-0","article-title":"Corporations, stakeholders and sustainable development I: a theoretical exploration of business\u2013society relations","volume":"61","year":"2005","journal-title":"Journal of Business Ethics"},{"issue":"2","key":"key2020092415500626000_ref035","doi-asserted-by":"crossref","first-page":"469","DOI":"10.3233\/IFS-141178","article-title":"Study on BIM-based construction project cost and schedule risk early warning","volume":"29","year":"2015","journal-title":"Journal of Intelligent and Fuzzy Systems"},{"issue":"4","key":"key2020092415500626000_ref036","doi-asserted-by":"crossref","first-page":"491","DOI":"10.1080\/01446190050024905","article-title":"A proposal for construction project risk assessment using fuzzy logic","volume":"18","year":"2000","journal-title":"Construction Management and Economics"},{"issue":"3","key":"key2020092415500626000_ref037","doi-asserted-by":"crossref","first-page":"170","DOI":"10.1061\/(ASCE)0887-3801(2001)15:3(170)","article-title":"Knowledge-based approach to construction project risk management","volume":"15","year":"2001","journal-title":"Journal of Computing in Civil Engineering"},{"issue":"5","key":"key2020092415500626000_ref038","doi-asserted-by":"crossref","first-page":"543","DOI":"10.1080\/09613210701203874","article-title":"Establishing sustainability: policy successes and failures","volume":"35","year":"2007","journal-title":"Building Research and Information"},{"volume-title":"Commission for EIA. Environmental Impact Assessment in the Netherlands. Views from the Commission for EIA in 2002","year":"2002","article-title":"Recommendations for sustainability assessment in The Netherlands","key":"key2020092415500626000_ref039"},{"issue":"2","key":"key2020092415500626000_ref040","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1016\/S0165-0114(01)00146-4","article-title":"A fuzzy project scheduling approach to minimize schedule risk for product development","volume":"127","year":"2002","journal-title":"Fuzzy Sets and Systems"},{"issue":"3\/4","key":"key2020092415500626000_ref041","doi-asserted-by":"crossref","first-page":"462","DOI":"10.1108\/K-07-2013-0137","article-title":"A systems thinking-based grey model for sustainability evaluation of urban tourism","volume":"43","year":"2014","journal-title":"Kybernetes"},{"issue":"1","key":"key2020092415500626000_ref042","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1080\/01446190010002561","article-title":"Risk assessment on contractors\u2019 pricing strategies","volume":"19","year":"2001","journal-title":"Construction Management and Economics"},{"issue":"7\/8","key":"key2020092415500626000_ref043","doi-asserted-by":"crossref","first-page":"839","DOI":"10.1108\/03684921211257694","article-title":"Dynamic suppliers\u2019 risk management of large-scale and complex equipment development","volume":"41","year":"2012","journal-title":"Kybernetes"},{"issue":"3","key":"key2020092415500626000_ref044","doi-asserted-by":"crossref","first-page":"708","DOI":"10.1016\/j.ejor.2007.06.021","article-title":"Using a risk-based approach to project scheduling: a case illustration from semiconductor manufacturing","volume":"190","year":"2008","journal-title":"European Journal of Operational Research"},{"issue":"4","key":"key2020092415500626000_ref045","doi-asserted-by":"crossref","first-page":"437","DOI":"10.1002\/int.21868","article-title":"Game theory based real-time shop floor scheduling strategy and method for cloud manufacturing","volume":"32","year":"2017","journal-title":"International Journal of Intelligent Systems"},{"issue":"10","key":"key2020092415500626000_ref046","doi-asserted-by":"crossref","first-page":"1652","DOI":"10.1108\/K-05-2016-0096","article-title":"Selection of risk response actions considering risk dependency","volume":"45","year":"2016","journal-title":"Kybernetes"},{"key":"key2020092415500626000_ref047","doi-asserted-by":"crossref","first-page":"203","DOI":"10.1016\/j.jclepro.2015.11.042","article-title":"A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore\u2019s green projects","volume":"115","year":"2016","journal-title":"Journal of Cleaner Production"},{"volume-title":"Pacific Rim Real Estate Society Conference","year":"2006","article-title":"Identifying key risks in construction projects: life cycle and stakeholder perspectives","key":"key2020092415500626000_ref048"},{"issue":"6","key":"key2020092415500626000_ref049","doi-asserted-by":"crossref","first-page":"601","DOI":"10.1016\/j.ijproman.2007.03.001","article-title":"Understanding the key risks in construction projects in China","volume":"25","year":"2007","journal-title":"International Journal of Project Management"},{"key":"key2020092415500626000_ref050","doi-asserted-by":"crossref","first-page":"88","DOI":"10.1016\/j.ssci.2015.12.027","article-title":"A review of risk management through BIM and BIM-related technologies","volume":"97","year":"2017","journal-title":"Safety Science"},{"key":"key2020092415500626000_ref051","first-page":"1457","article-title":"Numerical modeling for construction of large span bifurcations of Niayesh tunnel, Iran","volume":"19","year":"2014","journal-title":"Electrical Journal of Geotechnical Engineering"},{"issue":"4","key":"key2020092415500626000_ref052","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1080\/014461997372935","article-title":"Risk analysis for revenue dependent infrastructure projects","volume":"15","year":"1997","journal-title":"Construction Management and Economics"},{"volume-title":"Engineering Construction Risks: A Guide to Project Risk Analysis and Assessment Implications for Project Clients and Project Managers","year":"1992","key":"key2020092415500626000_ref053"}],"container-title":["Kybernetes"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/K-02-2018-0094\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/K-02-2018-0094\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T21:46:51Z","timestamp":1753393611000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/k\/article\/48\/3\/385-406\/269342"}},"subtitle":["Iran\u2019s Niayesh tunnel case study"],"short-title":[],"issued":{"date-parts":[[2019,3,4]]},"references-count":53,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2019,3,4]]}},"alternative-id":["10.1108\/K-02-2018-0094"],"URL":"https:\/\/doi.org\/10.1108\/k-02-2018-0094","relation":{},"ISSN":["0368-492X"],"issn-type":[{"type":"print","value":"0368-492X"}],"subject":[],"published":{"date-parts":[[2019,3,4]]}}}