{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,21]],"date-time":"2026-01-21T13:16:04Z","timestamp":1769001364370,"version":"3.49.0"},"reference-count":84,"publisher":"Emerald","issue":"5","license":[{"start":{"date-parts":[[2020,6,27]],"date-time":"2020-06-27T00:00:00Z","timestamp":1593216000000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["K"],"published-print":{"date-parts":[[2021,5,3]]},"abstract":"<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Purpose<\/jats:title>\n<jats:p>With an increasingly fierce competition of the shipbuilding industry, advanced technologies and excellent management philosophies in the manufacturing industry are gradually introduced to domestic shipyards. The purpose of this study is to promote the lean management of Chinese ship outfitting plants by lean production strategy.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Design\/methodology\/approach<\/jats:title>\n<jats:p>To promote the lean implementation of Chinese shipyards, the lean practice of ship-pipe part production is highlighted by lot-sizing optimization and strategic CONWIP (constant work-in-process) control. A nonlinear programming model is formulated to minimize the total cost of ship-pipe part manufacturing and the particle swarm optimization (PSO)-based algorithm is designed to resolve the established model. Besides, the pull-from-the-bottleneck (PFB) strategy is used to control ship-pipe part production, verified by Simulink simulation.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Findings<\/jats:title>\n<jats:p>Results show that the proposed lean strategy of the programming model and strategic PFB control could assist Chinese ship outfitting plants to leverage competitive advantage by waste reduction and lean achievement. Specifically, the PFB double-loop control strategy shows better performance when there is high productivity and the PFB single-loop control outperforms at lower productivity scenarios.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Practical implications<\/jats:title>\n<jats:p>To verify the effectiveness of the proposed lean strategy, a case study is performed to validate the formulated model. Also, simulation experiments realized by FlexSim software are conducted to testify results obtained by the constructed programming model.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Originality\/value<\/jats:title>\n<jats:p>Lean production management practice of the shipyard building industry is performed by the proposed lean production strategy through lot-sizing optimization and strategic PFB control in terms of ship-pipe part manufacturing.<\/jats:p>\n<\/jats:sec>","DOI":"10.1108\/k-06-2019-0389","type":"journal-article","created":{"date-parts":[[2020,7,3]],"date-time":"2020-07-03T10:19:03Z","timestamp":1593771543000},"page":"1483-1505","source":"Crossref","is-referenced-by-count":15,"title":["Lean production of ship-pipe parts based on lot-sizing optimization and PFB control strategy"],"prefix":"10.1108","volume":"50","author":[{"given":"Fuli","family":"Zhou","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Panpan","family":"Ma","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yandong","family":"He","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Saurabh","family":"Pratap","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Peng","family":"Yu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Biyu","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"140","published-online":{"date-parts":[[2020,6,27]]},"reference":[{"key":"key2024071512200945300_ref001","doi-asserted-by":"crossref","first-page":"418","DOI":"10.1016\/j.ijpe.2013.07.026","article-title":"Lot size optimization in manufacturing systems: the surrogate method","volume":"155","year":"2014","journal-title":"International Journal of Production Economics"},{"issue":"12","key":"key2024071512200945300_ref002","doi-asserted-by":"crossref","first-page":"3516","DOI":"10.1016\/j.cor.2006.01.016","article-title":"Supplier selection and order lot sizing modeling: a review","volume":"34","year":"2007","journal-title":"Computers and Operations Research"},{"key":"key2024071512200945300_ref003","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/j.omega.2017.10.005","article-title":"Lot sizing problem with multi-mode replenishment and batch delivery","volume":"81","year":"2018","journal-title":"Omega"},{"issue":"1","key":"key2024071512200945300_ref004","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1504\/IJMP.2010.029705","article-title":"Development of a framework for implementation of lean manufacturing systems","volume":"4","year":"2010","journal-title":"International Journal of Management Practice"},{"issue":"1","key":"key2024071512200945300_ref005","doi-asserted-by":"crossref","first-page":"83","DOI":"10.1287\/mnsc.1050.0446","article-title":"Less likely to fail: low performance, firm size and factory expansion in the shipbuilding industry","volume":"52","year":"2006","journal-title":"Management Science"},{"issue":"3","key":"key2024071512200945300_ref006","doi-asserted-by":"crossref","first-page":"1014","DOI":"10.1016\/j.ejor.2017.01.015","article-title":"Flexible lot sizing in hybrid make-to-order\/make-to-stock production planning","volume":"260","year":"2017","journal-title":"European Journal of Operational Research"},{"issue":"7","key":"key2024071512200945300_ref007","doi-asserted-by":"crossref","first-page":"876","DOI":"10.1108\/IJOPM-08-2012-0315","article-title":"Lean manufacturing: literature review and research issues","volume":"34","year":"2014","journal-title":"International Journal of Operations and Production Management"},{"issue":"2","key":"key2024071512200945300_ref008","doi-asserted-by":"crossref","first-page":"173","DOI":"10.1007\/s10288-014-0266-3","article-title":"A Lagrangian heuristic for capacitated single-item lot-sizing problems","volume":"13","year":"2015","journal-title":"4OR"},{"key":"key2024071512200945300_ref009","first-page":"1","article-title":"A review of single item lot-sizing problems","volume-title":"IEEE International Conference on Systems, Man and Cybernetics","year":"2002"},{"issue":"1","key":"key2024071512200945300_ref010","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1016\/j.eswa.2007.09.055","article-title":"Fuzzy axiomatic design-based performance evaluation model for docking facilities in shipbuilding industry: the case of Turkish shipyards","volume":"36","year":"2009","journal-title":"Expert Systems with Applications an Applications"},{"issue":"11","key":"key2024071512200945300_ref011","doi-asserted-by":"crossref","first-page":"156","DOI":"10.1109\/MCOM.2011.6069723","article-title":"Feasibility analysis of vehicular dynamic spectrum access via queueing theory model","volume":"49","year":"2011","journal-title":"Ieee Communications Magazine"},{"key":"key2024071512200945300_ref012","doi-asserted-by":"crossref","first-page":"772","DOI":"10.1016\/j.apm.2016.10.037","article-title":"On multi-item economic lot-sizing with remanufacturing and uncapacitated production","volume":"50","year":"2017","journal-title":"Applied Mathematical Modelling"},{"issue":"3","key":"key2024071512200945300_ref013","doi-asserted-by":"crossref","first-page":"923","DOI":"10.1016\/j.ejor.2018.02.042","article-title":"An integrated approach for production lot sizing and raw material purchasing","volume":"269","year":"2018","journal-title":"European Journal of Operational Research"},{"issue":"1","key":"key2024071512200945300_ref014","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1080\/09537287.2015.1050477","article-title":"Determinants and barriers to lean implementation in food-processing SMEs \u2013 a multiple case analysis","volume":"27","year":"2016","journal-title":"Production Planning and Control"},{"issue":"2","key":"key2024071512200945300_ref015","doi-asserted-by":"crossref","first-page":"79","DOI":"10.5957\/jspd.2014.30.2.79","article-title":"Lean project planning in shipbuilding","volume":"30","year":"2014","journal-title":"Journal of Ship Production and Design"},{"key":"key2024071512200945300_ref016","volume-title":"Lean Manufacturing Effects of Modularization on the Outfitting Process in Shipbuilding","year":"2015"},{"issue":"3","key":"key2024071512200945300_ref017","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1080\/0953728031000102595","article-title":"The CONWIP production control system: review and research issues","volume":"14","year":"2003","journal-title":"Production Planning and Control"},{"issue":"4","key":"key2024071512200945300_ref018","doi-asserted-by":"crossref","first-page":"245","DOI":"10.5957\/jspd.2016.32.4.245","article-title":"Toward efficient merchant shipbuilding based on the lean production methodology","volume":"32","year":"2016","journal-title":"Journal of Ship Production and Design"},{"issue":"1","key":"key2024071512200945300_ref019","doi-asserted-by":"crossref","first-page":"6","DOI":"10.1080\/21681015.2017.1374308","article-title":"An optimally integrated lot-sizing policy of inventory in a bi-objective multi-level supply chain with stochastic constraints and imperfect products","volume":"35","year":"2018","journal-title":"Journal of Industrial and Production Engineering"},{"issue":"6","key":"key2024071512200945300_ref020","doi-asserted-by":"crossref","first-page":"685","DOI":"10.2307\/30040661","article-title":"A behavioral theory of R&D expenditures and innovations: evidence from shipbuilding","volume":"46","year":"2003","journal-title":"Academy of Management Journal"},{"key":"key2024071512200945300_ref021","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/j.omega.2017.08.003","article-title":"The impact of service level constraints in deterministic lot sizing with backlogging","volume":"79","year":"2018","journal-title":"Omega"},{"issue":"2","key":"key2024071512200945300_ref022","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1287\/opre.1110.1031","article-title":"Approximating the nonlinear newsvendor and single-item stochastic lot-sizing problems when data is given by an oracle","volume":"60","year":"2012","journal-title":"Operations Research"},{"key":"key2024071512200945300_ref023","doi-asserted-by":"crossref","first-page":"106513","DOI":"10.1016\/j.cie.2020.106513","article-title":"An effective metaheuristic for the last mile delivery with roaming delivery locations and stochastic travel times","volume":"145","year":"2020","journal-title":"Computers and Industrial Engineering"},{"issue":"11","key":"key2024071512200945300_ref024","doi-asserted-by":"crossref","first-page":"1706","DOI":"10.1287\/mnsc.1050.0378","article-title":"Integrated lot sizing in serial supply chains with production capacities","volume":"51","year":"2005","journal-title":"Management Science"},{"issue":"3","key":"key2024071512200945300_ref025","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1016\/S0925-5273(97)00152-7","article-title":"Simulation study of CONWIP for a cold rolling plant","volume":"54","year":"1998","journal-title":"International Journal of Production Economics"},{"issue":"1","key":"key2024071512200945300_ref026","article-title":"An empirical investigation on lean production system framework in the Indian manufacturing industry","volume":"26","year":"2019","journal-title":"Benchmarking: An International Journal"},{"key":"key2024071512200945300_ref027","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1016\/j.tre.2013.10.001","article-title":"The international competitiveness of China\u2019s shipbuilding industry","volume":"60","year":"2013","journal-title":"Transportation Research Part E: Logistics and Transportation Review"},{"key":"key2024071512200945300_ref028","first-page":"4","volume-title":"Sustainability in Shipbuilding: Observations from Project-Oriented Supply Network in Cruise Ship Construction","year":"2019"},{"issue":"5","key":"key2024071512200945300_ref029","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","article-title":"The capacitated lot-sizing problem: a review of models and algorithms","volume":"31","year":"2003","journal-title":"Omega"},{"key":"key2024071512200945300_ref030","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/j.cor.2018.01.021","article-title":"Stochastic lot-sizing problem with nervousness considerations","volume":"94","year":"2018","journal-title":"Computers and Operations Research"},{"issue":"3","key":"key2024071512200945300_ref031","doi-asserted-by":"crossref","first-page":"167","DOI":"10.5957\/jsp.2002.18.3.167","article-title":"Lean production in the Japanese shipbuilding industry?","volume":"18","year":"2002","journal-title":"Journal of Ship Production"},{"issue":"1","key":"key2024071512200945300_ref032","first-page":"18","article-title":"Lean manufacturing methodology for shipyards","volume":"63","year":"2012","journal-title":"Brodogradnja"},{"issue":"3","key":"key2024071512200945300_ref033","first-page":"202","article-title":"Lean built-up panel assembly in a newbuilding shipyard","volume":"34","year":"2017","journal-title":"Journal of Ship Production and Design"},{"issue":"1","key":"key2024071512200945300_ref034","first-page":"1","article-title":"Lean methodology to transform shipbuilding panel assembly","volume":"33","year":"2018","journal-title":"Journal of Ship Production and Design"},{"issue":"5","key":"key2024071512200945300_ref035","doi-asserted-by":"crossref","first-page":"1215","DOI":"10.1080\/00207540600675793","article-title":"Determination of batch size at a bottleneck machine in manufacturing systems","volume":"45","year":"2007","journal-title":"International Journal of Production Research"},{"issue":"3","key":"key2024071512200945300_ref036","doi-asserted-by":"crossref","first-page":"346","DOI":"10.1007\/s10696-011-9091-6","article-title":"Simultaneous determination of lot size and production rate at capacity-constrained multiple-product systems","volume":"23","year":"2011","journal-title":"Flexible Services and Manufacturing Journal"},{"issue":"3\/4","key":"key2024071512200945300_ref037","first-page":"393","article-title":"Literature review of JIT-KANBAN system","volume":"32","year":"2007","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"key":"key2024071512200945300_ref038","article-title":"A systematic review of lean construction in mainland China","year":"2020","journal-title":"Journal of Cleaner Production"},{"issue":"20","key":"key2024071512200945300_ref039","doi-asserted-by":"crossref","first-page":"6249","DOI":"10.1080\/00207543.2010.527388","article-title":"Aggregate production planning for shipbuilding with variation-inventory trade-offs","volume":"49","year":"2011","journal-title":"International Journal of Production Research"},{"issue":"5\/8","key":"key2024071512200945300_ref040","first-page":"717","article-title":"An exact optimization approach for a transfer line reconfiguration problem","volume":"72","year":"2014","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"1\/2","key":"key2024071512200945300_ref041","first-page":"44","article-title":"Lean management as a countermeasure for normal disruptions","volume":"6","year":"2013","journal-title":"Operations Management Research"},{"issue":"3\/4","key":"key2024071512200945300_ref042","first-page":"370","article-title":"Lean production and operational performance in the Brazilian automotive supply chain","volume":"30","year":"2019","journal-title":"Total Quality Management and Business Excellence"},{"issue":"1","key":"key2024071512200945300_ref043","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1080\/21693277.2013.862159","article-title":"A framework for lean manufacturing implementation","volume":"1","year":"2013","journal-title":"Production and Manufacturing Research"},{"issue":"4","key":"key2024071512200945300_ref044","doi-asserted-by":"crossref","first-page":"826","DOI":"10.2307\/3213437","article-title":"Approximations in finite-capacity multi-server queues by Poisson arrivals","volume":"15","year":"1978","journal-title":"Journal of Applied Probability"},{"issue":"5\/6","key":"key2024071512200945300_ref045","first-page":"557","article-title":"A flexible and adaptable planning and control system for an MTO supply chain system","volume":"22","year":"2006","journal-title":"Robotics and Computer-Integrated Manufacturing"},{"issue":"11","key":"key2024071512200945300_ref046","doi-asserted-by":"crossref","first-page":"1043","DOI":"10.1080\/07408170008967460","article-title":"The capacitated lot-sizing problem with overtime decisions and setup times","volume":"32","year":"2000","journal-title":"Iie Transactions"},{"issue":"7","key":"key2024071512200945300_ref047","doi-asserted-by":"crossref","first-page":"564","DOI":"10.1080\/09537287.2014.936532","article-title":"On the adoption of lean manufacturing principles in process industries","volume":"26","year":"2015","journal-title":"Production Planning and Control"},{"issue":"1","key":"key2024071512200945300_ref048","doi-asserted-by":"crossref","first-page":"137","DOI":"10.1287\/opre.34.1.137","article-title":"Optimal lot sizing, process quality improvement and setup cost reduction","volume":"34","year":"1986","journal-title":"Operations Research"},{"issue":"4","key":"key2024071512200945300_ref049","first-page":"296","article-title":"Modified CONWIP systems: a review and classification","volume":"26","year":"2015","journal-title":"Production Planning and Control"},{"key":"key2024071512200945300_ref050","first-page":"1","article-title":"Achieving a sustainable shipbuilding supply chain under I4. 0 perspective","volume":"244","year":"2020","journal-title":"Journal of Cleaner Production"},{"key":"key2024071512200945300_ref051","doi-asserted-by":"crossref","first-page":"89","DOI":"10.1016\/j.cor.2019.03.007","article-title":"Heuristic methods for the capacitated stochastic lot-sizing problem under the static-dynamic uncertainty strategy","volume":"109","year":"2019","journal-title":"Computers and Operations Research"},{"key":"key2024071512200945300_ref052","doi-asserted-by":"crossref","first-page":"254","DOI":"10.1016\/j.ijpe.2018.06.020","article-title":"Energy-aware lot-sizing problem: complexity analysis and exact algorithms","volume":"203","year":"2018","journal-title":"International Journal of Production Economics"},{"key":"key2024071512200945300_ref053","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1016\/j.omega.2017.10.004","article-title":"Capacity acquisition for the single-item lot-sizing problem under energy constraints","volume":"81","year":"2018","journal-title":"Omega"},{"issue":"1","key":"key2024071512200945300_ref054","doi-asserted-by":"crossref","first-page":"117","DOI":"10.5267\/j.ijiec.2014.8.003","article-title":"Design and simulation of CONWIP in the complex flexible job shop of a make-to-order manufacturing firm","volume":"6","year":"2015","journal-title":"International Journal of Industrial Engineering Computations"},{"issue":"8","key":"key2024071512200945300_ref055","first-page":"659","article-title":"A sequential scheduling problem with impatient jobs","volume":"62","year":"2016","journal-title":"Naval Research Logistics (Nrl)"},{"issue":"9\/12","key":"key2024071512200945300_ref056","first-page":"3963","article-title":"The interrelation between industry 4.0 and lean production: an empirical study on European manufacturers","volume":"102","year":"2019","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"1","key":"key2024071512200945300_ref057","first-page":"55","article-title":"Procedure for estimating the effectiveness of ship modular outfitting","volume":"31","year":"2011","journal-title":"Engineering Review"},{"issue":"5","key":"key2024071512200945300_ref058","article-title":"A two-way causal chain between lean management practices and lean values","volume":"68","year":"2019","journal-title":"International Journal of Productivity and Performance Management"},{"issue":"1","key":"key2024071512200945300_ref059","first-page":"146","article-title":"A new framework for dynamical resources planning system in shipbuilding industry","volume":"11","year":"2019","journal-title":"Int. J. Advance Soft Compu. Appl"},{"issue":"1","key":"key2024071512200945300_ref060","doi-asserted-by":"crossref","first-page":"191","DOI":"10.1016\/j.ejor.2003.04.001","article-title":"Single item lot-sizing problems with backlogging on a single machine at a finite production rate","volume":"161","year":"2005","journal-title":"European Journal of Operational Research"},{"issue":"5","key":"key2024071512200945300_ref061","first-page":"1","article-title":"Knowledge building about performance evaluation in lean production","volume":"30","year":"2019","journal-title":"Journal of Manufacturing Technology Management"},{"issue":"2","key":"key2024071512200945300_ref062","doi-asserted-by":"crossref","first-page":"112","DOI":"10.1108\/20401461211243702","article-title":"Four decades of lean: a systematic literature review","volume":"3","year":"2012","journal-title":"International Journal of Lean Six Sigma"},{"issue":"2","key":"key2024071512200945300_ref063","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1080\/095372899233280","article-title":"Improving flow to achieve lean manufacturing in shipbuilding","volume":"10","year":"1999","journal-title":"Production Planning and Control"},{"key":"key2024071512200945300_ref064","article-title":"Vulnerability of multinational corporation knowledge network-facing resource loss","year":"2020","journal-title":"Management Decision"},{"key":"key2024071512200945300_ref065","doi-asserted-by":"crossref","first-page":"278","DOI":"10.1016\/j.ijpe.2018.03.019","article-title":"Optimal pricing and lot-sizing policy for supply chain system with deteriorating items under limited storage capacity","volume":"200","year":"2018","journal-title":"International Journal of Production Economics"},{"key":"key2024071512200945300_ref066","first-page":"1","article-title":"A comparison on industry 4.0 and lean production between manufacturers from emerging and developed economies","year":"2019","journal-title":"Total Quality Management and Business Excellence"},{"key":"key2024071512200945300_ref067","doi-asserted-by":"crossref","first-page":"173","DOI":"10.4018\/978-1-4666-5039-8.ch009","article-title":"A management system for sustainable lean implementation","volume-title":"Handbook of Research on Design and Management of Lean Production Systems","year":"2014"},{"issue":"6","key":"key2024071512200945300_ref068","doi-asserted-by":"crossref","first-page":"922","DOI":"10.1287\/opre.1040.0136","article-title":"A diffusion approximation for the G\/Gl\/n\/m queue","volume":"52","year":"2004","journal-title":"Operations Research"},{"issue":"2","key":"key2024071512200945300_ref069","doi-asserted-by":"crossref","first-page":"228","DOI":"10.1108\/00251740610650210","article-title":"The role of communication and management support in a lean manufacturing implementation","volume":"44","year":"2006","journal-title":"Management Decision"},{"key":"key2024071512200945300_ref070","first-page":"1","article-title":"Lean practices in software development projects: a literature review","volume-title":"AIP Conference Proceedings","year":"2019"},{"issue":"4","key":"key2024071512200945300_ref071","doi-asserted-by":"crossref","first-page":"398","DOI":"10.1504\/IJSOM.2010.032916","article-title":"Insights and learnings from lean manufacturing implementation practices","volume":"6","year":"2010","journal-title":"International Journal of Services and Operations Management"},{"key":"key2024071512200945300_ref072","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1016\/j.ress.2019.05.005","article-title":"Reliability analysis for series manufacturing system with imperfect inspection considering the interaction between quality and degradation","volume":"189","year":"2019","journal-title":"Reliability Engineering and System Safety"},{"key":"key2024071512200945300_ref073","first-page":"627","article-title":"A way to informationize the ship outfitting pallet control","volume-title":"11th IEEE Conference on Communication Technology","year":"2008"},{"issue":"6","key":"key2024071512200945300_ref074","doi-asserted-by":"crossref","first-page":"1393","DOI":"10.1007\/s10845-013-0737-y","article-title":"Clustering and group selection of interim product in shipbuilding","volume":"25","year":"2014","journal-title":"Journal of Intelligent Manufacturing"},{"issue":"1","key":"key2024071512200945300_ref079","first-page":"159013","article-title":"Last-mile delivery with stochastic travel times considering dual services","volume":"7","year":"2019","journal-title":"IEEE Access"},{"issue":"4","key":"key2024071512200945300_ref077","first-page":"1","article-title":"Fuzzy extended VIKOR-based mobile robot selection model for hospital pharmacy","volume":"15","year":"2018","journal-title":"International Journal of Advanced Robotic Systems"},{"issue":"1","key":"key2024071512200945300_ref078","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1108\/IMDS-11-2016-0498","article-title":"Quality improvement pilot program selection based on dynamic hybrid MCDM approach","volume":"118","year":"2018","journal-title":"Industrial Management and Data Systems"},{"issue":"3","key":"key2024071512200945300_ref075","first-page":"201","article-title":"Production effectiveness-based system reliability calculation of serial manufacturing with checking machine","volume":"27","year":"2016","journal-title":"Journal of Computers (Taiwan)"},{"issue":"1","key":"key2024071512200945300_ref083","first-page":"57","article-title":"What attracts vehicle consumers\u2019 buying: a saaty scale-based VIKOR (SSC-VIKOR) approach from after-sales textual perspective?","volume":"120","year":"2020","journal-title":"Industrial Management and Data Systems"},{"issue":"3","key":"key2024071512200945300_ref084","doi-asserted-by":"crossref","first-page":"213","DOI":"10.14743\/apem2017.3.252","article-title":"Production lot-sizing decision making considering bottleneck drift in multi-stage manufacturing system","volume":"12","year":"2017","journal-title":"Advances in Production Engineering and Management"},{"issue":"1","key":"key2024071512200945300_ref082","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1111\/itor.12399","article-title":"Model and algorithm for bilevel multisized terminal location-routing problem for the last mile delivery","volume":"26","year":"2019","journal-title":"International Transactions in Operational Research"},{"key":"key2024071512200945300_ref080","doi-asserted-by":"crossref","first-page":"231","DOI":"10.1016\/j.jclepro.2019.04.182","article-title":"End-of-life vehicle (ELV) recycling management: improving performance using an ISM approach","volume":"228","year":"2019","journal-title":"Journal of Cleaner Production"},{"issue":"5","key":"key2024071512200945300_ref076","doi-asserted-by":"crossref","first-page":"482","DOI":"10.3390\/su8050482","article-title":"ELV recycling service provider selection using the hybrid MCDM method: a case application in China","volume":"8","year":"2016","journal-title":"Sustainability"},{"key":"key2024071512200945300_ref081","doi-asserted-by":"crossref","first-page":"559","DOI":"10.1016\/j.cie.2018.12.014","article-title":"Supplier portfolio of key outsourcing parts selection using a two-stage decision-making framework for Chinese domestic auto-maker","volume":"128","year":"2019","journal-title":"Computers and Industrial Engineering"}],"container-title":["Kybernetes"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/K-06-2019-0389\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/K-06-2019-0389\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T21:48:47Z","timestamp":1753393727000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/k\/article\/50\/5\/1483-1505\/452606"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,6,27]]},"references-count":84,"journal-issue":{"issue":"5","published-online":{"date-parts":[[2020,6,27]]},"published-print":{"date-parts":[[2021,5,3]]}},"alternative-id":["10.1108\/K-06-2019-0389"],"URL":"https:\/\/doi.org\/10.1108\/k-06-2019-0389","relation":{},"ISSN":["0368-492X","0368-492X"],"issn-type":[{"value":"0368-492X","type":"print"},{"value":"0368-492X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020,6,27]]}}}