{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,27]],"date-time":"2025-10-27T21:06:58Z","timestamp":1761599218956,"version":"3.41.2"},"reference-count":43,"publisher":"Emerald","issue":"3","license":[{"start":{"date-parts":[[2021,6,3]],"date-time":"2021-06-03T00:00:00Z","timestamp":1622678400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["K"],"published-print":{"date-parts":[[2022,2,22]]},"abstract":"<jats:sec><jats:title content-type=\"abstract-subheading\">Purpose<\/jats:title><jats:p>The aim of this paper is to present a method for finding the optimum balance between sequence-dependent setup costs, holding costs, delivery costs and delay penalties in an integrated production\u2013distribution system with lot sizing decisions.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Design\/methodology\/approach<\/jats:title><jats:p>Two mixed integer linear programming models and an optimality property are proposed for the problem. Since the problem is NP-hard, a genetic algorithm reinforced with a heuristic is developed for solving the model in large-scale settings. The algorithm parameters are tuned using the Taguchi method.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Findings<\/jats:title><jats:p>The results obtained on randomly generated instances reveal a performance advantage for the proposed algorithm; it is shown that lot sizing can reduce the average cost of the supply chain up to 11.8%. Furthermore, the effects of different parameters and factors of the proposed model on supply chain costs are examined through a sensitivity analysis.<\/jats:p><\/jats:sec><jats:sec><jats:title content-type=\"abstract-subheading\">Originality\/value<\/jats:title><jats:p>Although integrated production and distribution scheduling in make-to-order industries has received a great deal of attention from researchers, most researchers in this area have treated each order as a job processed in an uninterrupted time interval, and no temporary holding costs are assumed. Even among the few studies where temporary holding costs are taken into consideration, none has examined the effect of splitting an order at the production stage (lot sizing) and the possibility of reducing costs through splitting. The present study is the first to take holding costs into consideration while incorporating lot sizing decisions in the operational production and distribution problem.<\/jats:p><\/jats:sec>","DOI":"10.1108\/k-10-2020-0697","type":"journal-article","created":{"date-parts":[[2021,6,1]],"date-time":"2021-06-01T03:38:56Z","timestamp":1622518736000},"page":"1151-1179","source":"Crossref","is-referenced-by-count":3,"title":["Coordinating lot sizing and integrated production and distribution scheduling with batch delivery and holding cost"],"prefix":"10.1108","volume":"51","author":[{"given":"Maedeh","family":"Bank","sequence":"first","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0001-6898-258X","authenticated-orcid":false,"given":"Mohammad","family":"Mahdavi Mazdeh","sequence":"additional","affiliation":[]},{"given":"Mahdi","family":"Heydari","sequence":"additional","affiliation":[]},{"given":"Ebrahim","family":"Teimoury","sequence":"additional","affiliation":[]}],"member":"140","published-online":{"date-parts":[[2021,6,3]]},"reference":[{"key":"key2022092214010070300_ref001","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1016\/j.ejor.2014.03.039","article-title":"Coordination of production and interstage batch delivery with outsourced distribution","volume":"238","year":"2014","journal-title":"European Journal of Operational Research"},{"key":"key2022092214010070300_ref002","doi-asserted-by":"crossref","first-page":"6193","DOI":"10.1080\/00207543.2017.1346323","article-title":"Integrated production scheduling and batch delivery with fixed departure times and inventory holding costs","volume":"55","year":"2017","journal-title":"International Journal of Production Research"},{"key":"key2022092214010070300_ref003","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/j.omega.2017.10.005","article-title":"Lot sizing problem with multi-mode replenishment and batch delivery","volume":"81","year":"2018","journal-title":"Omega"},{"key":"key2022092214010070300_ref004","doi-asserted-by":"crossref","first-page":"208","DOI":"10.1016\/j.ijpe.2013.07.001","article-title":"Lot sizing versus batching in the production and distribution planning of perishable goods","volume":"146","year":"2013","journal-title":"International Journal of Production Economics"},{"key":"key2022092214010070300_ref005","first-page":"77","article-title":"Applying meta-heuristic algorithms for an integrated production-distribution problem in a two level supply chain","volume":"8","year":"2020","journal-title":"Uncertain Supply Chain Management"},{"key":"key2022092214010070300_ref006","doi-asserted-by":"crossref","first-page":"257","DOI":"10.1007\/s10951-008-0081-9","article-title":"The integrated production\u2013inventory\u2013distribution\u2013routing problem","volume":"12","year":"2009","journal-title":"Journal of Scheduling"},{"key":"key2022092214010070300_ref007","doi-asserted-by":"crossref","first-page":"6040","DOI":"10.1080\/00207543.2015.1010744","article-title":"An adaptive large neighbourhood search for the operational integrated production and distribution problem of perishable products","volume":"53","year":"2015","journal-title":"International Journal of Production Research"},{"key":"key2022092214010070300_ref008","doi-asserted-by":"crossref","first-page":"55","DOI":"10.1007\/s10479-013-1415-3","article-title":"Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling","volume":"211","year":"2013","journal-title":"Annals of Operations Research"},{"article-title":"Integrated production and distribution operations","volume-title":"Handbook of Quantitative Supply Chain Analysis","year":"2004","key":"key2022092214010070300_ref009"},{"key":"key2022092214010070300_ref010","doi-asserted-by":"crossref","first-page":"130","DOI":"10.1287\/opre.1080.0688","article-title":"Integrated production and outbound distribution scheduling: review and extensions","volume":"58","year":"2010","journal-title":"Operations Research"},{"key":"key2022092214010070300_ref011","doi-asserted-by":"crossref","first-page":"614","DOI":"10.1287\/mnsc.1040.0325","article-title":"Integrated scheduling of production and distribution operations","volume":"51","year":"2005","journal-title":"Management Science"},{"key":"key2022092214010070300_ref012","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.ejor.2004.12.023","article-title":"A branch and bound algorithm to minimize the total tardiness for m-machine permutation flowshop problems","volume":"174","year":"2006","journal-title":"European Journal of Operational Research"},{"key":"key2022092214010070300_ref013","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s00291-015-0429-4","article-title":"Simultaneous lotsizing and scheduling problems: a classification and review of models","volume":"39","year":"2017","journal-title":"OR Spectrum"},{"key":"key2022092214010070300_ref014","doi-asserted-by":"crossref","first-page":"6707","DOI":"10.1080\/00207543.2016.1154623","article-title":"A dynamic multi-plant lot-sizing and distribution problem","volume":"54","year":"2016","journal-title":"International Journal of Production Research"},{"key":"key2022092214010070300_ref015","doi-asserted-by":"crossref","first-page":"906","DOI":"10.1016\/j.ejor.2016.09.019","article-title":"Integrated production and distribution scheduling with a perishable product","volume":"259","year":"2017","journal-title":"European Journal of Operational Research"},{"key":"key2022092214010070300_ref016","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.jmsy.2012.07.005","article-title":"A review and critique on integrated production\u2013distribution planning models and techniques","volume":"32","year":"2013","journal-title":"Journal of Manufacturing Systems"},{"key":"key2022092214010070300_ref017","doi-asserted-by":"crossref","first-page":"28","DOI":"10.1007\/s10696-011-9125-0","article-title":"Integrated production and distribution planning for perishable food products","volume":"24","year":"2012","journal-title":"Flexible Services and Manufacturing Journal"},{"key":"key2022092214010070300_ref018","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1007\/BF01539800","article-title":"The general lotsizing and scheduling problem","volume":"19","year":"1997","journal-title":"Operations-Research-Spektrum"},{"key":"key2022092214010070300_ref019","doi-asserted-by":"crossref","first-page":"13","DOI":"10.1016\/j.ijpe.2014.08.017","article-title":"Integrated batch production and distribution scheduling with limited vehicle capacity","volume":"160","year":"2015","journal-title":"International Journal of Production Economics"},{"volume-title":"Lotsizing and Scheduling for Production Planning","year":"2012","key":"key2022092214010070300_ref020"},{"key":"key2022092214010070300_ref021","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/j.cie.2011.08.014","article-title":"A genetic algorithm for minimizing total tardiness\/earliness of weighted jobs in a batched delivery system","volume":"62","year":"2012","journal-title":"Computers and Industrial Engineering"},{"key":"key2022092214010070300_ref022","doi-asserted-by":"crossref","first-page":"428","DOI":"10.1287\/opre.1090.0727","article-title":"Economic lot-sizing for integrated production and transportation","volume":"58","year":"2010","journal-title":"Operations Research"},{"key":"key2022092214010070300_ref023","doi-asserted-by":"crossref","first-page":"365","DOI":"10.1016\/S0305-0483(03)00059-8","article-title":"The capacitated lot sizing problem: a review of models and algorithms","volume":"31","year":"2003","journal-title":"Omega"},{"key":"key2022092214010070300_ref024","doi-asserted-by":"crossref","first-page":"634","DOI":"10.1016\/j.omega.2011.12.002","article-title":"Simultaneous production and logistics operations planning in semicontinuous food industries","volume":"40","year":"2012","journal-title":"Omega"},{"key":"key2022092214010070300_ref025","doi-asserted-by":"crossref","first-page":"722","DOI":"10.1080\/00207543.2018.1481301","article-title":"Integrated multi-factory production and distribution scheduling applying vehicle routing approach","volume":"57","year":"2019","journal-title":"International Journal of Production Research"},{"key":"key2022092214010070300_ref026","doi-asserted-by":"crossref","first-page":"2105","DOI":"10.24200\/sci.2017.4298","article-title":"Integrated production and distribution scheduling for perishable products","volume":"24","year":"2017","journal-title":"Scientia Iranica"},{"key":"key2022092214010070300_ref027","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1016\/j.apm.2010.07.023","article-title":"Single-machine batch scheduling minimizing weighted flow times and delivery costs","volume":"35","year":"2011","journal-title":"Applied Mathematical Modelling"},{"key":"key2022092214010070300_ref028","first-page":"30","article-title":"Optimization model for a production, inventory, distribution and routing problem in small furniture companies","volume":"26","year":"2018","journal-title":"Top"},{"key":"key2022092214010070300_ref029","doi-asserted-by":"crossref","first-page":"347","DOI":"10.1016\/j.ijpe.2019.05.017","article-title":"An integrated production scheduling and delivery route planning with multi-purpose machines: a case study from a furniture manufacturing company","volume":"219","year":"2020","journal-title":"International Journal of Production Economics"},{"key":"key2022092214010070300_ref030","doi-asserted-by":"crossref","first-page":"3126","DOI":"10.1016\/j.cor.2005.11.021","article-title":"Minimizing total earliness and tardiness on a single machine using a hybrid heuristic","volume":"34","year":"2007","journal-title":"Computers and Operations Research"},{"key":"key2022092214010070300_ref031","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1016\/j.jmsy.2017.11.001","article-title":"Coordinating order acceptance and integrated production-distribution scheduling with batch delivery considering Third Party Logistics distribution","volume":"46","year":"2018","journal-title":"Journal of Manufacturing Systems"},{"key":"key2022092214010070300_ref032","doi-asserted-by":"crossref","first-page":"1629","DOI":"10.1007\/s40314-016-0415-8","article-title":"Evolutionary computation algorithms to coordinating order acceptance and batch delivery for an integrated supply chain scheduling","volume":"37","year":"2018","journal-title":"Computational and Applied Mathematics"},{"key":"key2022092214010070300_ref033","doi-asserted-by":"crossref","first-page":"629","DOI":"10.1016\/j.ejor.2008.12.036","article-title":"Robustness in operational research and decision aiding: a multi-faceted issue","volume":"200","year":"2010","journal-title":"European Journal of Operational Research"},{"key":"key2022092214010070300_ref034","doi-asserted-by":"crossref","first-page":"1061","DOI":"10.1080\/07408179908969907","article-title":"A review of integrated analysis of production-distribution systems","volume":"31","year":"1999","journal-title":"IIE Transactions"},{"key":"key2022092214010070300_ref035","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1016\/j.omega.2017.01.007","article-title":"Integrated multiproduct batch production and truck shipment scheduling under different shipping policies","volume":"74","year":"2018","journal-title":"Omega"},{"key":"key2022092214010070300_ref036","doi-asserted-by":"crossref","first-page":"2981","DOI":"10.1016\/j.apm.2014.10.066","article-title":"A production\u2013delivery lot sizing policy with stochastic delivery time and in consideration of transportation cost","volume":"39","year":"2015","journal-title":"Applied Mathematical Modelling"},{"key":"key2022092214010070300_ref037","doi-asserted-by":"crossref","first-page":"849","DOI":"10.1016\/j.ejor.2017.03.023","article-title":"Classifying and modeling setups and cleanings in lot sizing and scheduling","volume":"261","year":"2017","journal-title":"European Journal of Operational Research"},{"key":"key2022092214010070300_ref038","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1504\/IJISE.2015.065949","article-title":"Integrated scheduling of production and distribution operations: a review","volume":"19","year":"2015","journal-title":"International Journal of Industrial and Systems Engineering"},{"key":"key2022092214010070300_ref039","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/s00291-018-0536-0","article-title":"Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification","volume":"41","year":"2019","journal-title":"OR Spectrum"},{"key":"key2022092214010070300_ref040","doi-asserted-by":"crossref","first-page":"393","DOI":"10.1002\/nav.21813","article-title":"Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents","volume":"65","year":"2018","journal-title":"Naval Research Logistics"},{"article-title":"Integrated production, inventory, and batch delivery scheduling with due date assignment","volume-title":"Due Date-Related Scheduling with Two Agents","year":"2020","key":"key2022092214010070300_ref041"},{"key":"key2022092214010070300_ref042","doi-asserted-by":"crossref","first-page":"1057","DOI":"10.1016\/j.ejor.2006.09.059","article-title":"On the machine scheduling problem with job delivery coordination","volume":"182","year":"2007","journal-title":"European Journal of Operational Research"},{"key":"key2022092214010070300_ref043","doi-asserted-by":"crossref","first-page":"987","DOI":"10.1080\/07408170600559706","article-title":"Scheduling and lot sizing with sequence-dependent setup: a literature review","volume":"38","year":"2006","journal-title":"IIE Transactions"}],"container-title":["Kybernetes"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/K-10-2020-0697\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/K-10-2020-0697\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T21:50:42Z","timestamp":1753393842000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/k\/article\/51\/3\/1151-1179\/451930"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2021,6,3]]},"references-count":43,"journal-issue":{"issue":"3","published-online":{"date-parts":[[2021,6,3]]},"published-print":{"date-parts":[[2022,2,22]]}},"alternative-id":["10.1108\/K-10-2020-0697"],"URL":"https:\/\/doi.org\/10.1108\/k-10-2020-0697","relation":{},"ISSN":["0368-492X"],"issn-type":[{"type":"print","value":"0368-492X"}],"subject":[],"published":{"date-parts":[[2021,6,3]]}}}