{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,10,30]],"date-time":"2026-10-30T08:34:10Z","timestamp":1793349250237,"version":"4.5.0"},"reference-count":41,"publisher":"Emerald","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"abstract":"<jats:sec>\n                    <jats:title>Purpose<\/jats:title>\n                    <jats:p>This study aims to synthesise the intellectual development of engineering\u2013procurement\u2013construction and infrastructure project risk governance and examine whether bibliometric evidence supports five overlapping intellectual orientations.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Design\/methodology\/approach<\/jats:title>\n                    <jats:p>The study combined bibliometric analysis with Bibliometrix\/Biblioshiny, VOSviewer and a scripted workflow to examine 173 Scopus-indexed publications (1999\u20132026). The analytical corpus was derived through relevance validation of 678 candidate records, with provenance checked against an 801-row master ledger. Fifteen provisional 2026 records were excluded from temporal comparisons.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Findings<\/jats:title>\n                    <jats:p>The analysis identified five orientations: risk analysis and control (53 documents), performance and overrun (80), governance and relational mechanisms (52), digital information integration (7) and artificial intelligence (AI)-enabled decision support (18). The share of period publications addressing performance and overrun increased from 34.7 % in 1999\u20132018 to 59.7 % in 2023\u20132025, whereas the digital and AI orientations remained comparatively limited. These patterns concern the published literature and do not establish organizational maturity or realised capability.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Research limitations\/implications<\/jats:title>\n                    <jats:p>Scopus coverage, title\/abstract-based relevance validation, citation lag, analytical thresholds and interpretive coding delimit the findings. Project-level research is required to test the proposed relationships.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Practical implications<\/jats:title>\n                    <jats:p>The orientations provide structured review prompts for risk processes, outcome linkage, decision rights, information integration and human oversight of predictive systems; they are not intended as a diagnostic maturity instrument.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Originality\/value<\/jats:title>\n                    <jats:p>The study connects construction risk, megaproject governance and construction AI through an auditable corpus and an evidence-bounded conceptual framework.<\/jats:p>\n                  <\/jats:sec>","DOI":"10.1108\/jedt-07-2026-0574","type":"journal-article","created":{"date-parts":[[2026,10,30]],"date-time":"2026-10-30T08:13:46Z","timestamp":1793348026000},"page":"1-21","source":"Crossref","is-referenced-by-count":0,"title":["From risk management to AI-enabled governance: five intellectual orientations in EPC and infrastructure project risk governance"],"prefix":"10.1108","author":[{"ORCID":"https:\/\/orcid.org\/0009-0004-4170-7405","authenticated-orcid":true,"given":"Ranjan Kumar","family":"Shrivastava","sequence":"first","affiliation":[{"name":"NICMAR University School of Construction, , Pune, , and Department of Civil, NTPC Limited, Korba, India","place":["India"]}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4626-1228","authenticated-orcid":true,"given":"Arjita","family":"Biswas","sequence":"additional","affiliation":[{"name":"NICMAR University School of Construction, , Pune,","place":["India"]}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"140","published-online":{"date-parts":[[2026,11,2]]},"reference":[{"issue":"7","key":"2026103004134161700_ref001","doi-asserted-by":"publisher","first-page":"622","DOI":"10.1016\/j.ijproman.2006.07.010","article-title":"Good project governance for proper risk allocation in public-private partnerships in Indonesia","volume":"24","author":"Abednego","year":"2006","journal-title":"International Journal of Project Management"},{"issue":"8","key":"2026103004134161700_ref002","doi-asserted-by":"publisher","first-page":"1321","DOI":"10.1016\/J.IJPROMAN.2013.09.005","article-title":"What is project governance and what are its origins?","volume":"32","author":"Ahola","year":"2014","journal-title":"International Journal of Project Management, Pergamon"},{"key":"2026103004134161700_ref003","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2020.101827","article-title":"Deep learning in the construction industry: a review of present status and future innovations","volume":"32","author":"Akinosho","year":"2020","journal-title":"Journal of Building Engineering"},{"issue":"8","key":"2026103004134161700_ref004","doi-asserted-by":"publisher","first-page":"102843","DOI":"10.1016\/J.ASEJ.2024.102843","article-title":"Bibliometric analysis of the literature on risk management in the construction sector: exploring current and future trends","volume":"15","author":"Al Qudah","year":"2024","journal-title":"Ain Shams Engineering Journal, Elsevier"},{"issue":"1","key":"2026103004134161700_ref005","doi-asserted-by":"publisher","first-page":"90","DOI":"10.1080\/10429247.2024.2369452","article-title":"Exploring governance mechanisms in megaprojects: a Mixed-Methods systematic review","volume":"37","author":"Alqershy","year":"2025","journal-title":"Engineering Management Journal, Taylor and Francis"},{"issue":"4","key":"2026103004134161700_ref006","doi-asserted-by":"publisher","first-page":"647","DOI":"10.1016\/j.ijproman.2017.02.016","article-title":"Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting","volume":"35","author":"Arashpour","year":"2017","journal-title":"International Journal of Project Management"},{"issue":"4","key":"2026103004134161700_ref007","doi-asserted-by":"publisher","first-page":"959","DOI":"10.1016\/J.JOI.2017.08.007","article-title":"Bibliometrix: an R-tool for comprehensive science mapping analysis","volume":"11","author":"Aria","year":"2017","journal-title":"Journal of Informetrics, Elsevier"},{"issue":"4","key":"2026103004134161700_ref008","first-page":"349","article-title":"Causes of delay in large construction projects","volume":"24","author":"Assaf","year":"2006","journal-title":"International Journal of Project Management, Elsevier"},{"issue":"21","key":"2026103004134161700_ref009","doi-asserted-by":"publisher","first-page":"5973","DOI":"10.3390\/SU11215973","article-title":"Causes and mitigation strategies of delay in power construction projects: gaps between owners and contractors in successful and unsuccessful projects","volume":"11","author":"Banobi","year":"2019","journal-title":"Sustainability 2019"},{"key":"2026103004134161700_ref010","doi-asserted-by":"publisher","first-page":"210","DOI":"10.1016\/j.egyr.2019.01.008","article-title":"Schedule overruns as a barrier for liquefied natural gas projects: a review of the literature and research agenda","volume":"5","author":"Basak","year":"2019","journal-title":"Energy Reports"},{"issue":"3","key":"2026103004134161700_ref011","doi-asserted-by":"publisher","first-page":"432","DOI":"10.1016\/j.ijproman.2017.01.002","article-title":"Beyond theory: towards a probabilistic causation model to support project governance in infrastructure projects","volume":"35","author":"Cardenas","year":"2017","journal-title":"International Journal of Project Management"},{"issue":"3","key":"2026103004134161700_ref012","first-page":"328","article-title":"What are the causes and cures of poor megaproject performance? A systematic literature review and research agenda","volume":"51","author":"Denicol","year":"2020","journal-title":"Project Management Journal, Sage Publications Sage CA: Los Angeles, CA"},{"issue":"4","key":"2026103004134161700_ref013","doi-asserted-by":"publisher","first-page":"479","DOI":"10.1016\/J.IJPROMAN.2011.10.004","article-title":"Analysing factors affecting delays in Indian construction projects","volume":"30","author":"Doloi","year":"2012","journal-title":"International Journal of Project Management, Pergamon"},{"key":"2026103004134161700_ref014","doi-asserted-by":"publisher","first-page":"285","DOI":"10.1016\/J.JBUSRES.2021.04.070","article-title":"How to conduct a bibliometric analysis: an overview and guidelines","volume":"133","author":"Donthu","year":"2021","journal-title":"Journal of Business Research, Elsevier"},{"issue":"3","key":"2026103004134161700_ref015","doi-asserted-by":"publisher","first-page":"344","DOI":"10.1093\/OXREP\/GRP024","article-title":"Survival of the unfittest: Why the worst infrastructure gets built-and what we can do about it","volume":"25","author":"Flyvbjerg","year":"2009","journal-title":"Oxford Review of Economic Policy"},{"issue":"1","key":"2026103004134161700_ref016","doi-asserted-by":"publisher","first-page":"71","DOI":"10.1080\/01441640309904","article-title":"How common and how large are cost overruns in transport infrastructure projects?","volume":"23","author":"Flyvbjerg","year":"2003","journal-title":"Transport Reviews, Taylor and Francis Group"},{"issue":"1","key":"2026103004134161700_ref017","doi-asserted-by":"publisher","first-page":"04019085,","DOI":"10.1061\/(ASCE)CO.1943-7862.0001736","article-title":"Machine learning algorithms for construction projects delay risk prediction","volume":"146","author":"Gondia","year":"2020","journal-title":"Journal of Construction Engineering and Management"},{"issue":"3","key":"2026103004134161700_ref018","doi-asserted-by":"publisher","first-page":"1014","DOI":"10.1108\/CI-05-2022-0120","article-title":"Structuring risks for a comprehensive understanding of cost overruns in power plant projects","volume":"25","author":"Islam","year":"2025","journal-title":"Construction Innovation"},{"key":"2026103004134161700_ref019","doi-asserted-by":"publisher","first-page":"12","DOI":"10.1016\/J.ESWA.2019.06.030","article-title":"A knowledge-based expert system to assess power plant project cost overrun risks","volume":"136","author":"Islam","year":"2019","journal-title":"Expert Systems with Applications, Pergamon"},{"issue":"4","key":"2026103004134161700_ref020","doi-asserted-by":"publisher","first-page":"613","DOI":"10.1016\/J.IJPROMAN.2016.01.008","article-title":"The relationship between project governance and project success","volume":"34","author":"Joslin","year":"2016","journal-title":"International Journal of Project Management, Pergamon"},{"issue":"3","key":"2026103004134161700_ref021","doi-asserted-by":"publisher","first-page":"273","DOI":"10.1080\/13669877.2011.636838","article-title":"Adaptive and integrative governance on risk and uncertainty","volume":"15","author":"Klinke","year":"2012","journal-title":"Journal of Risk Research, Routledge"},{"key":"2026103004134161700_ref022","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2024.105836","article-title":"Predicting and managing risk interactions and systemic risks in infrastructure projects using machine learning","volume":"168","author":"Moussa","year":"2024","journal-title":"Automation in Construction"},{"issue":"1","key":"2026103004134161700_ref023","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1016\/j.ijproman.2006.06.005","article-title":"Risk allocation in the private provision of public infrastructure","volume":"25","author":"Ng","year":"2007","journal-title":"International Journal of Project Management"},{"issue":"9","key":"2026103004134161700_ref024","doi-asserted-by":"publisher","first-page":"1342","DOI":"10.3390\/BUILDINGS12091342","article-title":"A scientometric analysis of studies on risk management in construction projects","volume":"12","author":"Osei-Kyei","year":"2022","journal-title":"Buildings"},{"key":"2026103004134161700_ref025","unstructured":"PAIMANA \u2013 Infrastructure & Project Monitoring | MoSPI, Government of India\n           (2026), available at:Link to the cited article. (accessed26 July 2026)."},{"issue":"1","key":"2026103004134161700_ref026","doi-asserted-by":"crossref","first-page":"17","DOI":"10.3390\/en13010017","article-title":"Causes of delay in power transmission projects: an empirical study","volume":"13","author":"Pall","year":"2020","journal-title":"Energies, MDPI"},{"key":"2026103004134161700_ref027","doi-asserted-by":"publisher","first-page":"103517","DOI":"10.1016\/J.AUTCON.2020.103517","article-title":"Roles of artificial intelligence in construction engineering and management: a critical review and future trends","volume":"122","author":"Pan","year":"2021","journal-title":"Automation in Construction, Elsevier"},{"issue":"18","key":"2026103004134161700_ref028","doi-asserted-by":"publisher","first-page":"18","DOI":"10.3390\/en14185901","article-title":"A digitalized design risk analysis tool with machine-learning algorithm for EPC contractor\u2019s technical specifications assessment on bidding","volume":"14","author":"Park","year":"2021","journal-title":"Energies"},{"issue":"4","key":"2026103004134161700_ref029","doi-asserted-by":"publisher","first-page":"1178","DOI":"10.1016\/J.JOI.2016.10.006","article-title":"Constructing bibliometric networks: a comparison between full and fractional counting","volume":"10","author":"Perianes-Rodriguez","year":"2016","journal-title":"Journal of Informetrics, Elsevier"},{"issue":"2","key":"2026103004134161700_ref030","doi-asserted-by":"publisher","first-page":"231","DOI":"10.1007\/S13280-010-0134-0","article-title":"Coping with complexity, uncertainty and ambiguity in risk governance: a synthesis","volume":"40","author":"Renn","year":"2011","journal-title":"Ambio, Springer Science and Business Media B.V"},{"issue":"1","key":"2026103004134161700_ref031","doi-asserted-by":"publisher","first-page":"45","DOI":"10.1007\/s10668-020-00607-2","article-title":"Risk management of hydropower projects for sustainable development: a review","volume":"23","author":"Shaktawat","year":"2021","journal-title":"Environment, Development and Sustainability"},{"issue":"6","key":"2026103004134161700_ref032","doi-asserted-by":"publisher","first-page":"727","DOI":"10.3846\/13923730.2017.1281839","article-title":"Causes of contractors\u2019 claims in international engineering-procurement-construction projects","volume":"23","author":"Shen","year":"2017","journal-title":"Journal of Civil Engineering and Management"},{"key":"2026103004134161700_ref033","doi-asserted-by":"publisher","DOI":"10.1016\/j.erss.2025.104057","article-title":"Beyond economies of scale: learning from construction cost overrun risks and time delays in global energy infrastructure projects","volume":"123","author":"Sovacool","year":"2025","journal-title":"Energy Research and Social Science"},{"issue":"1","key":"2026103004134161700_ref034","doi-asserted-by":"publisher","first-page":"101","DOI":"10.1016\/J.IJPROMAN.2013.03.004","article-title":"Towards a better modelling and assessment of construction risk: insights from a literature review","volume":"32","author":"Taroun","year":"2014","journal-title":"International Journal of Project Management, Pergamon"},{"issue":"3","key":"2026103004134161700_ref035","doi-asserted-by":"publisher","first-page":"100711","DOI":"10.1016\/J.JIK.2025.100711","article-title":"Artificial intelligence in risk management within the realm of construction projects: a bibliometric analysis and systematic literature review","volume":"10","author":"Tian","year":"2025","journal-title":"Journal of Innovation and Knowledge, Elsevier"},{"issue":"8","key":"2026103004134161700_ref036","doi-asserted-by":"publisher","first-page":"1382","DOI":"10.1016\/J.IJPROMAN.2013.07.006","article-title":"The management of project management: a conceptual framework for project governance","volume":"32","author":"Too","year":"2014","journal-title":"International Journal of Project Management, Pergamon"},{"issue":"2","key":"2026103004134161700_ref037","doi-asserted-by":"publisher","first-page":"523","DOI":"10.1007\/S11192-009-0146-3","article-title":"Software survey: VOSviewer, a computer program for bibliometric mapping","volume":"84","author":"van Eck","year":"2009","journal-title":"Scientometrics 2009 84:2, Springer"},{"issue":"2","key":"2026103004134161700_ref038","doi-asserted-by":"publisher","first-page":"97","DOI":"10.1016\/S0263-7863(01)00080-1","article-title":"Transforming project risk management into project uncertainty management","volume":"21","author":"Ward","year":"2003","journal-title":"International Journal of Project Management, Pergamon"},{"issue":"19","key":"2026103004134161700_ref039","doi-asserted-by":"publisher","first-page":"5332","DOI":"10.3390\/SU11195332","article-title":"Enhancing risk management by partnering in international EPC projects: perspective from evolutionary game in Chinese construction companies","volume":"11","author":"Yang","year":"2019","journal-title":"Sustainability"},{"issue":"5","key":"2026103004134161700_ref040","doi-asserted-by":"publisher","first-page":"540","DOI":"10.1080\/15623599.2023.2167303","article-title":"Construction risk management research: intellectual structure and emerging themes","volume":"24","author":"Zhao","year":"2024","journal-title":"International Journal of Construction Management, Taylor and Francis"},{"issue":"3","key":"2026103004134161700_ref041","doi-asserted-by":"publisher","first-page":"429","DOI":"10.1177\/1094428114562629","article-title":"Bibliometric methods in management and organization","volume":"18","author":"Zupic","year":"2015","journal-title":"Organizational Research Methods, SAGE Publications Inc"}],"container-title":["Journal of Engineering, Design and Technology"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/jedt\/article-pdf\/doi\/10.1108\/JEDT-07-2026-0574\/11941916\/jedt-07-2026-0574en.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"syndication"},{"URL":"https:\/\/www.emerald.com\/jedt\/article-pdf\/doi\/10.1108\/JEDT-07-2026-0574\/11941916\/jedt-07-2026-0574en.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,10,30]],"date-time":"2026-10-30T08:13:48Z","timestamp":1793348028000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.emerald.com\/jedt\/article\/doi\/10.1108\/JEDT-07-2026-0574\/1405808\/From-risk-management-to-AI-enabled-governance-five"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,11,2]]},"references-count":41,"URL":"https:\/\/doi.org\/10.1108\/jedt-07-2026-0574","relation":{},"ISSN":["1726-0531","1758-8901"],"issn-type":[{"value":"1726-0531","type":"print"},{"value":"1758-8901","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026,11,2]]}}}