{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,10]],"date-time":"2026-04-10T19:38:28Z","timestamp":1775849908588,"version":"3.50.1"},"reference-count":86,"publisher":"Emerald","issue":"2","license":[{"start":{"date-parts":[[2020,10,28]],"date-time":"2020-10-28T00:00:00Z","timestamp":1603843200000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.emerald.com\/insight\/site-policies"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["CI"],"published-print":{"date-parts":[[2021,3,18]]},"abstract":"<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Purpose<\/jats:title>\n<jats:p>The use of building information modelling (BIM) methodology has been increasing in the architecture, engineering, construction and operation sector, driven to a new paradigm of work with the use of three-dimensional (3D) parametric models. However, building information modelling (BIM) has been mostly used for as-built models of a building, not yet been widely used by designers during project and construction phases for occupational risks prevention and safety planning. This paper aims to show the capacity of developing tools that allow adding functionalities to Revit software to improve safety procedures and reduce the time spent on modelling them during the design phase.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Design\/methodology\/approach<\/jats:title>\n<jats:p>To reach this objective, a structural 3D model of a building is used to validate the developed tools. A plugin prototype based on legal regulations was developed, allowing qualitative safety assessment through the application of job hazard analysis (JHA), SafeObject and checklists. These tools allow the automated detection of falls from height situations and the automated placement of the correspondent safety systems.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Findings<\/jats:title>\n<jats:p>Revit application programming interface allowed the conception and addition of several functionalities that can be used in BIM methodology, and more specifically in the prevention of occupational risks in construction, contributing this paper to the application of a new approach to the prevention through design.<\/jats:p>\n<\/jats:sec>\n<jats:sec>\n<jats:title content-type=\"abstract-subheading\">Originality\/value<\/jats:title>\n<jats:p>This paper is innovative and important because the developed plugins allowed: automated detection of potential falls from heights in the design stage; automated introduction of safety objects from a BIM Safety Objects Library; and the intercommunication between a BIM model and a safety database, bringing JHA integration directly on the project. The prototype of this work was validated for fall from height hazards but can be extended to other potentials hazards since the initial design stage.<\/jats:p>\n<\/jats:sec>","DOI":"10.1108\/ci-12-2019-0147","type":"journal-article","created":{"date-parts":[[2020,10,28]],"date-time":"2020-10-28T01:35:19Z","timestamp":1603848919000},"page":"244-258","source":"Crossref","is-referenced-by-count":56,"title":["Safety plugins for risks prevention through design resourcing BIM"],"prefix":"10.1108","volume":"21","author":[{"given":"Fernanda","family":"Rodrigues","sequence":"first","affiliation":[]},{"given":"Fl\u00e1vio","family":"Antunes","sequence":"additional","affiliation":[]},{"given":"Raquel","family":"Matos","sequence":"additional","affiliation":[]}],"member":"140","published-online":{"date-parts":[[2020,10,28]]},"reference":[{"key":"key2021043009451220000_ref001","unstructured":"ACT (2019), \u201cAutoridade Para as Condi\u00e7\u00f5es do Trabalho\u201d, available at: www.act.gov.pt\/(pt-PT)\/CentroInformacao\/Estatistica\/Paginas\/default.aspx (accessed 17 March 2020) (in Portuguese)."},{"key":"key2021043009451220000_ref002","volume-title":"The Contractor\u2019s Guide to BIM","author":"AGCA","year":"2005","edition":"1st"},{"issue":"4","key":"key2021043009451220000_ref003","doi-asserted-by":"publisher","DOI":"10.1108\/ECAM-08-2017-0175","article-title":"Developing organizational capabilities to deliver lean and green project outcomes using BIM","volume":"25","year":"2018","journal-title":"Engineering Construction and Architectural Management"},{"issue":"3","key":"key2021043009451220000_ref004","doi-asserted-by":"publisher","first-page":"141","DOI":"10.5130\/ajceb.v13i3.330","article-title":"Issues of construction health and safety in developing countries: a case of Jordan","volume":"13","year":"2013","journal-title":"Construction Economics and Building"},{"key":"key2021043009451220000_ref005","doi-asserted-by":"publisher","first-page":"15","DOI":"10.1016\/j.ssci.2019.08.044","article-title":"A risk assessment approach for enhancing construction safety performance","volume":"121","year":"2020","journal-title":"Safety Science"},{"key":"key2021043009451220000_ref006","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1016\/j.proeng.2014.10.525","article-title":"Integration of life cycle assessment in a BIM environment","volume":"85","year":"2014","journal-title":"Procedia Engineering"},{"key":"key2021043009451220000_ref007","unstructured":"Autodesk (2018), \u201cRevit API developers guide\u201d, available at: http:\/\/help.autodesk.com\/view\/RVT\/2017\/ENU\/?guid=GUID-F0A122E0-E556-4D0D-9D0F-7E72A9315A42"},{"key":"key2021043009451220000_ref008","article-title":"BIM for facilitating construction safety planning and management at job sites","year":"2012"},{"key":"key2021043009451220000_ref009","article-title":"A BIM-based approach for communicating and implementing a construction site safety plan","volume-title":"49th ASC Annual International Conference Proceedings","year":"2013"},{"issue":"9","key":"key2021043009451220000_ref010","first-page":"11","article-title":"Building information modeling (BIM): benefits, risks and challenges","volume":"18","year":"2007","journal-title":"BIM-Benefit Measurement"},{"issue":"4","key":"key2021043009451220000_ref011","doi-asserted-by":"publisher","first-page":"15","DOI":"10.5130\/ajceb.v12i4.3032","article-title":"Building information modeling (BIM): now and beyond","volume":"12","year":"2012","journal-title":"Construction Economics and Building"},{"key":"key2021043009451220000_ref012","volume-title":"Singapore BIM Guide","author":"BCA","year":"2013"},{"issue":"6","key":"key2021043009451220000_ref013","doi-asserted-by":"publisher","first-page":"580","DOI":"10.1080\/01446193.2012.690884","article-title":"Application of the Loughborough accident causation model: a framework for organizational learning","volume":"31","year":"2013","journal-title":"Construction Management and Economics"},{"key":"key2021043009451220000_ref014","first-page":"63","article-title":"BIM on the construction site: generating on demand, task specific drawings in the site","year":"2015"},{"key":"key2021043009451220000_ref015","unstructured":"Bimobject (2017), available at: https:\/\/bimobject.com\/pt\/babcock\/product\/roof-hatch-safety-railing"},{"key":"key2021043009451220000_ref016","volume-title":"Specification for Collaborative Sharing and Use of Structured Health and Safety Information Using BIM","author":"BSI, PAS 1192-6","year":"2018"},{"key":"key2021043009451220000_ref017","unstructured":"Cardoso, P. (2009), \u201cModelo de preven\u00e7\u00e3o de acidentes na constru\u00e7\u00e3o\u201d, 128, available at: www.ordemengenheiros.pt\/fotos\/editor2\/cdn\/especializacoes\/16_000137864.pdf (in Portuguese)."},{"key":"key2021043009451220000_ref018","doi-asserted-by":"publisher","first-page":"00018","DOI":"10.1051\/matecconf\/20166600018","article-title":"How can BIM support construction safety management? Development of SIM","volume":"66","year":"2016","journal-title":"MATEC Web of Conferences"},{"issue":"2","key":"key2021043009451220000_ref019","doi-asserted-by":"publisher","first-page":"99","DOI":"10.1108\/14714170510815203","article-title":"4DCAD-safety: visualizing project scheduling and safety planning","volume":"5","year":"2005","journal-title":"Construction Innovation"},{"key":"key2021043009451220000_ref020","doi-asserted-by":"publisher","DOI":"10.1088\/1755-1315\/218\/1\/012058","article-title":"The application of BIM technology in a comprehensive experimental building project","volume-title":"IOP Conference Series: Earth and Environmental Science","year":"2019"},{"issue":"4","key":"key2021043009451220000_ref021","doi-asserted-by":"publisher","first-page":"229","DOI":"10.1108\/14714170410815114","article-title":"Construction safety management: an exploratory study from China","volume":"4","year":"2004","journal-title":"Construction Innovation"},{"key":"key2021043009451220000_ref022","volume-title":"Common BIM Requirements","author":"COBIM","year":"2012"},{"key":"key2021043009451220000_ref023","article-title":"A retrospective analysis of work-related deaths in the Australian construction industry","volume-title":"ARCOM 27th Annual Conference","year":"2011"},{"key":"key2021043009451220000_ref024","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1016\/j.compind.2018.03.039","article-title":"Industry 4.0 as an enabler of proximity for construction supply chains: a systematic literature review","volume":"99","year":"2018","journal-title":"Computers in Industry"},{"key":"key2021043009451220000_ref025","doi-asserted-by":"publisher","DOI":"10.1088\/1757-899X\/471\/11\/112041","article-title":"Use of BIM tools for organization of the construction site in the aspect of work safety","volume-title":"IOP Conference Series: Materials Science and Engineering","year":"2019"},{"issue":"8","key":"key2021043009451220000_ref026","doi-asserted-by":"publisher","first-page":"1011","DOI":"10.1016\/j.autcon.2009.07.002","article-title":"Automatic rule-based checking of building designs","volume":"18","year":"2009","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref027","volume-title":"BIM Handbook a Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors","year":"2011"},{"key":"key2021043009451220000_ref028","unstructured":"Eurostat (2017a), \u201cFatal and non-fatal accidents at work\u2019 by NACE section, EU-28\u201d, Source: Eurostat (online data code: (hsw_n2_01) and (hsw_n2_02)), available at: https:\/\/ec.europa.eu\/eurostat\/statistics-explained\/index.php\/Accidents_at_work_statistics#Analysis_by_activity (accessed 18 March 2020)."},{"key":"key2021043009451220000_ref029","unstructured":"Eurostat (2017b), \u201cFatal accidents at work\u201d, available at: https:\/\/ec.europa.eu\/eurostat\/statistics-explained\/index.php\/Accidents_at_work_statistics#Incidence_rates (accessed 18 March 2020)."},{"key":"key2021043009451220000_ref030","unstructured":"Fernandes, R. (2013), \u201cAdvantages and disadvantages of BIM platforms on construction site\u201d, Department of Civil Engineering, available at: http:\/\/repositorio-aberto.up.pt\/handle\/10216\/73195 (in Portuguese)."},{"issue":"1","key":"key2021043009451220000_ref031","doi-asserted-by":"publisher","first-page":"68","DOI":"10.1108\/ci-04-2015-0022","article-title":"Customisable framework for project risk management","volume":"17","year":"2017","journal-title":"Construction Innovation"},{"issue":"2","key":"key2021043009451220000_ref032","doi-asserted-by":"publisher","first-page":"272","DOI":"10.1016\/j.ssci.2007.06.032","article-title":"Safety assessment in design and preparation phase","volume":"46","year":"2008","journal-title":"Safety Science"},{"issue":"5","key":"key2021043009451220000_ref033","doi-asserted-by":"publisher","first-page":"446","DOI":"10.1080\/01446193.2014.907498","article-title":"Construction accident causality: learning from different countries and differing consequences","volume":"32","year":"2014","journal-title":"Construction Management and Economics"},{"issue":"1","key":"key2021043009451220000_ref034","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/j.shaw.2014.10.002","article-title":"Integrating BIM and planning software for health and safety site induction","volume":"6","year":"2015","journal-title":"Safety and Health at Work"},{"key":"key2021043009451220000_ref035","doi-asserted-by":"publisher","first-page":"284","DOI":"10.1016\/j.autcon.2018.08.013","article-title":"Digital engineering potential in addressing causes of construction accidents","volume":"95","year":"2018","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref036","doi-asserted-by":"publisher","first-page":"135","DOI":"10.1016\/j.autcon.2016.10.004","article-title":"Visualization technology-based construction safety management: a review","volume":"73","year":"2017","journal-title":"Automation in Construction"},{"issue":"2","key":"key2021043009451220000_ref037","doi-asserted-by":"publisher","first-page":"167","DOI":"10.1016\/j.autcon.2010.09.014","article-title":"BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials","volume":"20","year":"2011","journal-title":"Automation in Construction"},{"issue":"6","key":"key2021043009451220000_ref038","first-page":"820","article-title":"Construction collision detection for site entities based on 4-D space-time model","volume":"50","year":"2010","journal-title":"Journal of Tsinghua University Science Technology"},{"key":"key2021043009451220000_ref039","first-page":"281","article-title":"8D BIM modelling tool for accident prevention through design","volume-title":"26th Annual ARCOM Conference, September","year":"2010"},{"issue":"2","key":"key2021043009451220000_ref040","doi-asserted-by":"publisher","first-page":"137","DOI":"10.1016\/j.autcon.2006.12.005","article-title":"Comparison of construction photograph and VR image in construction progress","volume":"17","year":"2008","journal-title":"Automation in Construction"},{"issue":"1","key":"key2021043009451220000_ref042","doi-asserted-by":"publisher","first-page":"66","DOI":"10.1016\/j.aei.2013.12.002","article-title":"Automatic design and planning of scaffolding systems using building information modelling","volume":"28","year":"2014","journal-title":"Advanced Engineering Informatics"},{"issue":"3","key":"key2021043009451220000_ref041","doi-asserted-by":"publisher","first-page":"04014052","DOI":"10.1061\/(ASCE)CP.1943-5487.0000340","article-title":"Information retrieval framework for hazard identification in construction","volume":"29","year":"2013","journal-title":"Journal of Computing in Civil Engineering"},{"key":"key2021043009451220000_ref043","article-title":"Building information modelling-enhancing productivity in rail infrastructure construction","volume-title":"First International Conference on 3D Construction Printing (3DcP), and the 6th International Conference on Innovative Production and Construction (IPC 2018)","year":"2018"},{"key":"key2021043009451220000_ref044","doi-asserted-by":"publisher","first-page":"78","DOI":"10.1016\/j.ssci.2015.11.025","article-title":"Stochastic state sequence model to predict construction site safety states through real-time location systems","volume":"84","year":"2016","journal-title":"Safety Science"},{"issue":"5","key":"key2021043009451220000_ref045","doi-asserted-by":"publisher","first-page":"488","DOI":"10.1108\/ECAM-08-2011-0073","article-title":"A case study analysis of fatal incidents involving excavators in the Australian construction industry","volume":"20","year":"2013","journal-title":"Engineering, Construction and Architectural Management"},{"key":"key2021043009451220000_ref046","doi-asserted-by":"publisher","first-page":"445","DOI":"10.1016\/j.ssci.2015.11.002","article-title":"Construction safety risk drivers: a BIM approach","volume":"82","year":"2016","journal-title":"Safety Science"},{"key":"key2021043009451220000_ref047","first-page":"1","article-title":"Prevention through design: addressing occupational risks in the design and redesign processes","volume-title":"ByDesign","year":"2007"},{"issue":"5","key":"key2021043009451220000_ref048","doi-asserted-by":"publisher","first-page":"477","DOI":"10.1016\/j.jlp.2011.03.004","article-title":"Risk analysis and assessment methodologies in the work sites: on a review, classification and comparative study of the scientific literature of the period 2000-2009","volume":"24","year":"2011","journal-title":"Journal of Loss Prevention in the Process Industries"},{"issue":"14","key":"key2021043009451220000_ref049","doi-asserted-by":"publisher","first-page":"2819","DOI":"10.3390\/app9142819","article-title":"Industry 4.0 for construction industry \u2013 how ready is the industry?","volume":"9","year":"2019","journal-title":"Applied Sciences"},{"issue":"6","key":"key2021043009451220000_ref050","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1080\/01446193.2013.780662","article-title":"A case study on automated safety compliance checking to assist fall protection design and planning in building information models","volume":"31","year":"2013","journal-title":"Construction Management and Economics"},{"key":"key2021043009451220000_ref051","volume-title":"Building Information Modeling Site Safety Submission Guidelines and Standards","author":"New York, NY County Buildings","year":"2013"},{"key":"key2021043009451220000_ref052","unstructured":"OSHA 1926-501 (2019), \u201cOccupational safety and health administration\u201d, Fall Protection in Construction, available at: https:\/\/www.osha.gov\/dts\/osta\/otm\/otm_v\/otm_v_4.html (accessed 13 November 2019)."},{"key":"key2021043009451220000_ref053","doi-asserted-by":"publisher","first-page":"44","DOI":"10.1016\/j.autcon.2016.05.019","article-title":"Structural sustainability appraisal in BIM","volume":"69","year":"2016","journal-title":"Automation in Construction"},{"issue":"ISBN 0-203-93301-X","key":"key2021043009451220000_ref053a","article-title":"Construction cost management: learning from case studies","year":"2008","journal-title":"First Published 2008 Taylor and Francis Group London and New York"},{"key":"key2021043009451220000_ref054","doi-asserted-by":"publisher","first-page":"323","DOI":"10.1016\/j.autcon.2017.09.021","article-title":"Point cloud quality requirements for scan-vs-BIM based automated construction progress monitoring","volume":"84","year":"2017","journal-title":"Automation in Construction"},{"issue":"4","key":"key2021043009451220000_ref055","doi-asserted-by":"publisher","first-page":"721","DOI":"10.3233\/WOR-152030","article-title":"Correlation of causal factors that influence construction safety performance: a model","volume":"51","year":"2015","journal-title":"Work"},{"key":"key2021043009451220000_ref056","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-61645-2_9","article-title":"Safety through design: a BIM-based framework","volume-title":"Conference paper: Sustainable Civil Infrastructures: Innovative Infrastructure Geotechnology","year":"2018"},{"key":"key2021043009451220000_ref058","doi-asserted-by":"publisher","DOI":"10.1155\/2019\/9872736","article-title":"Development of a web application for historical building management through BIM technology","volume":"2019","year":"2019","journal-title":"Advances in Civil Engineering"},{"key":"key2021043009451220000_ref057","doi-asserted-by":"publisher","first-page":"84","DOI":"10.1016\/j.jobe.2018.01.010","article-title":"Building life cycle applied to refurbishment of a traditional building from Oporto, Portugal","volume":"17","year":"2018","journal-title":"Journal of Building Engineering"},{"key":"key2021043009451220000_ref059","doi-asserted-by":"publisher","DOI":"10.2174\/97816810845721170101","article-title":"Worldwide BIM overview","volume-title":"Integrated Building Information Modelling","year":"2017","edition":"1st"},{"key":"key2021043009451220000_ref060","doi-asserted-by":"publisher","first-page":"205","DOI":"10.1016\/j.autcon.2018.10.012","article-title":"Applying rule-based model-checking to construction site layout planning tasks","volume":"97","year":"2019","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref061","volume-title":"Building Information Modelling (BIM) Promoting Construction Safety","year":"2009"},{"key":"key2021043009451220000_ref062","article-title":"4D-BIM for construction safety planning","year":"2010"},{"key":"key2021043009451220000_ref063","first-page":"125","article-title":"BIM-based site layout and safety planning","volume":"259","year":"2009","journal-title":"VTT Symposium (Valtion Teknillinen Tutkimuskeskus)"},{"issue":"5","key":"key2021043009451220000_ref064","doi-asserted-by":"publisher","first-page":"1333","DOI":"10.1016\/j.ssci.2011.12.036","article-title":"Is it possible to influence safety in the building sector? A literature review extending from 1980 until the present","volume":"50","year":"2012","journal-title":"Safety Science"},{"key":"key2021043009451220000_ref065","doi-asserted-by":"publisher","first-page":"39","DOI":"10.1016\/j.autcon.2016.11.001","article-title":"Construction safety clash detection: identifying safety incompatibilities among fundamental attributes using data mining","volume":"74","year":"2017","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref066","article-title":"A critical review of construction as a project-based industry: identifying paths towards a project-independent approach to construction","volume-title":"CIB Combining Forces","year":"2005"},{"key":"key2021043009451220000_ref067","doi-asserted-by":"publisher","first-page":"38","DOI":"10.1016\/j.autcon.2019.04.008","article-title":"Automatic checks from 3D point cloud data for safety regulation compliance for scaffold work platforms","volume":"104","year":"2019","journal-title":"Automation in Construction"},{"issue":"1","key":"key2021043009451220000_ref068","doi-asserted-by":"publisher","first-page":"2","DOI":"10.1108\/ci-10-2014-0049","article-title":"Setting new trends of integrated building information modelling (BIM) for construction industry","volume":"15","year":"2015","journal-title":"Construction Innovation"},{"issue":"7","key":"key2021043009451220000_ref069","doi-asserted-by":"publisher","first-page":"5016003","DOI":"10.1061\/(ASCE)CO.1943-7862.0001125","article-title":"Case study of BIM and cloud \u2013 enabled real-time RFID indoor localization for construction management applications","volume":"142","year":"2016","journal-title":"Journal of Construction Engineering and Management"},{"key":"key2021043009451220000_ref070","doi-asserted-by":"publisher","first-page":"86","DOI":"10.1016\/j.autcon.2019.02.015","article-title":"Accident prevention through design (PtD): integration of building information modeling and PtD knowledge base","volume":"102","year":"2019","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref072","doi-asserted-by":"publisher","first-page":"183","DOI":"10.1016\/j.autcon.2012.05.006","article-title":"Integrating building information modeling (BIM) and safety: automated safety checking of construction models and schedules","volume":"29","year":"2013","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref073","unstructured":"Zhang, S. (2014), \u201cIntegrating safety and BIM: Automated construction hazard identification and prevention\u201d, (August), available at: http:\/\/hdl.handle.net\/1853\/52235"},{"issue":"2","key":"key2021043009451220000_ref071","doi-asserted-by":"publisher","first-page":"155","DOI":"10.1016\/j.autcon.2010.09.013","article-title":"BIM-and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies","volume":"20","year":"2011","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref074","doi-asserted-by":"publisher","first-page":"29","DOI":"10.1016\/j.autcon.2015.02.005","article-title":"Ontology-based semantic modeling of construction safety knowledge: towards automated safety planning for job hazard analysis (JHA)","volume":"52","year":"2015","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref075","first-page":"1","article-title":"Integrating BIM and safety: an automated rule-based checking system for safety planning and simulation","year":"2011"},{"key":"key2021043009451220000_ref076","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.ssci.2014.08.001","article-title":"BIM-based fall hazard identification and prevention in construction safety planning","volume":"72","year":"2015","journal-title":"Safety Science"},{"key":"key2021043009451220000_ref077","doi-asserted-by":"publisher","first-page":"102","DOI":"10.1016\/j.autcon.2011.07.005","article-title":"Construction safety and digital design: a review","volume":"22","year":"2012","journal-title":"Automation in Construction"},{"key":"key2021043009451220000_ref078","article-title":"\u2018Temporary or mobile construction sites of 24 June 1992 on the implementation of minimum safety and health requirements at temporary or mobile construction sites\u2019 (eighth individual directive within the meaning of article 16 (1) of directive 89\/391\/EEC)","volume-title":"Official Journal of the European Communities","author":"Directive 92\/57\/EEC","year":"2020"},{"key":"key2021043009451220000_ref079","article-title":"Decreto-Lei \u2018normas de seguran\u00e7a no trabalho da constru\u00e7\u00e3o civil\u2019, 11 de agosto de 1958: Min.Obras p\u00fablicas e das corpor. e prev. Social","author":"DL 41821\/1958","year":"2020"},{"key":"key2021043009451220000_ref080","first-page":"7199","article-title":"Decreto-Lei \u2018condi\u00e7\u00f5es de seguran\u00e7a e de sa\u00fade no trabalho em estaleiros tempor\u00e1rios ou m\u00f3veis\u2019, 29 outubro, 2003, DR s\u00e9rie A, 251","author":"DL n.\u00b0 273\/2003","year":"2020"},{"issue":"10","key":"key2021043009451220000_ref081","doi-asserted-by":"publisher","first-page":"2020","DOI":"10.1016\/j.ssci.2012.01.018","article-title":"Developing the understanding of underlying causes of construction fatal accidents","volume":"50","year":"2012","journal-title":"Safety Science"},{"issue":"4","key":"key2021043009451220000_ref082","doi-asserted-by":"publisher","first-page":"401","DOI":"10.1016\/j.apergo.2004.12.002","article-title":"Contributing factors in construction accidents","volume":"36","year":"2005","journal-title":"Applied Ergonomics"},{"key":"key2021043009451220000_ref083","unstructured":"Hide, S., Atkinson, S., Pavitt, T., Haslam, R., Gibb, A. and Gyi, D. (2003), \u201cCausal factors in construction accidents\u201d, HSE research report 156, available at: https:\/\/dspace.lboro.ac.uk\/2134\/2558"},{"key":"key2021043009451220000_ref084","author":"ISO 29481-1","year":"2020"},{"key":"key2021043009451220000_ref085","first-page":"703","article-title":"Prescri\u00e7\u00f5es m\u00ednimas de seguran\u00e7a e de sa\u00fade nos locais e postos de trabalho dos estaleiros tempor\u00e1rios ou m\u00f3veis\u2019, 3 de abril de 1996, di\u00e1rio da rep\u00fablica, 1a S\u00e9rie-B n.\u00b0 80","author":"Portaria n.\u00b0 101\/1996","year":"2020"}],"container-title":["Construction Innovation"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/CI-12-2019-0147\/full\/xml","content-type":"application\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/www.emerald.com\/insight\/content\/doi\/10.1108\/CI-12-2019-0147\/full\/html","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,7,24]],"date-time":"2025-07-24T23:23:03Z","timestamp":1753399383000},"score":1,"resource":{"primary":{"URL":"http:\/\/www.emerald.com\/ci\/article\/21\/2\/244-258\/28097"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020,10,28]]},"references-count":86,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2020,10,28]]},"published-print":{"date-parts":[[2021,3,18]]}},"alternative-id":["10.1108\/CI-12-2019-0147"],"URL":"https:\/\/doi.org\/10.1108\/ci-12-2019-0147","relation":{},"ISSN":["1471-4175","1471-4175"],"issn-type":[{"value":"1471-4175","type":"print"},{"value":"1471-4175","type":"print"}],"subject":[],"published":{"date-parts":[[2020,10,28]]}}}