{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,24]],"date-time":"2025-11-24T11:35:10Z","timestamp":1763984110336,"version":"3.45.0"},"reference-count":55,"publisher":"Emerald","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"abstract":"<jats:sec>\n                    <jats:title>Purpose<\/jats:title>\n                    <jats:p>This paper focuses on the transition process from conventional construction to the contemporary Construction Industrialization (CI) phenomenon. Despite the significant challenges faced by construction companies, the nature of this shift is often not well understood and is inadequately systematized in the existing literature. This study aimed to explore the perspective of Practitioners from different sectors involved in construction in terms of CI Drivers, Changing Practices, and Elements of Influence. This paper argues that Academics and Practitioners can fully systematize such a transition process by the close integration of these three aspects.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Design\/methodology\/approach<\/jats:title>\n                    <jats:p>An exploratory multiple-case study was conducted from an international and cross-sector perspective.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Findings<\/jats:title>\n                    <jats:p>The empirical findings are compared with the existing theory. This study highlights the importance of societal concerns that impact all three aspects. In addition, novel practices and the social and contextual factors affecting CI are identified. This research outlines that technical issues are a significant part of the CI process, but social and contextual issues are considered the biggest challenges that have been hindering its progress.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Originality\/value<\/jats:title>\n                    <jats:p>This study is one of the first to empirically explore CI as a process, and it is also the first to provide a comprehensive industry-wide perspective on its implementation. The paper concludes by suggesting avenues for future research.<\/jats:p>\n                  <\/jats:sec>","DOI":"10.1108\/ecam-04-2024-0521","type":"journal-article","created":{"date-parts":[[2025,11,24]],"date-time":"2025-11-24T11:33:07Z","timestamp":1763983987000},"page":"1-29","source":"Crossref","is-referenced-by-count":0,"title":["The construction industrialization process: results of an international cross-sector case study"],"prefix":"10.1108","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-9555-6591","authenticated-orcid":true,"given":"Sara","family":"Costa","sequence":"first","affiliation":[{"name":"ALGORITMI Research Centre, University of Minho Department of Production and Systems, , ,","place":["Guimar\u00e3es, Portugal"]},{"name":"dstgroup , ,","place":["Braga, Portugal"]}]},{"given":"Maria","family":"Sameiro Carvalho","sequence":"additional","affiliation":[{"name":"ALGORITMI Research Centre, University of Minho Department of Production and Systems, , ,","place":["Guimar\u00e3es, Portugal"]}]},{"given":"Carina","family":"Pimentel","sequence":"additional","affiliation":[{"name":"ALGORITMI Research Centre, University of Minho Department of Production and Systems, , ,","place":["Guimar\u00e3es, Portugal"]}]},{"given":"Cl\u00e1udia","family":"Duarte","sequence":"additional","affiliation":[{"name":"dstgroup , ,","place":["Braga, Portugal"]}]}],"member":"140","published-online":{"date-parts":[[2025,11,24]]},"reference":[{"issue":"4","key":"2025112406330037600_ref001","doi-asserted-by":"publisher","first-page":"356","DOI":"10.1108\/QRJ-08-2016-0048","article-title":"An abductive approach to qualitative built environment research: a viable system methodological expos\u00e9","volume":"17","author":"Awuzie","year":"2017","journal-title":"Qualitative Research Journal"},{"issue":"2","key":"2025112406330037600_ref002","doi-asserted-by":"publisher","first-page":"223","DOI":"10.1108\/CI-07-2019-0064","article-title":"Demystifying the concept of offsite manufacturing method: towards a robust definition and classification system","volume":"20","author":"Ayinla","year":"2019","journal-title":"Construction Innovation"},{"issue":"4","key":"2025112406330037600_ref003","doi-asserted-by":"publisher","first-page":"329","DOI":"10.1016\/j.jom.2010.06.002","article-title":"Qualitative case studies in operations management: trends, research outcomes, and future research implications","volume":"29","author":"Barratt","year":"2011","journal-title":"Journal of Operations Management"},{"issue":"3","key":"2025112406330037600_ref004","doi-asserted-by":"publisher","first-page":"369","DOI":"10.2307\/248684","article-title":"The case research strategy in studies of information systems","volume":"11","author":"Benbasat","year":"1987","journal-title":"MIS Quarterly"},{"issue":"1","key":"2025112406330037600_ref005","doi-asserted-by":"publisher","first-page":"1471","DOI":"10.1108\/CI-07-2020-0121","article-title":"An off-site construction readiness maturity model for the Indian construction sector","volume":"21","author":"Bendi","year":"2020","journal-title":"Construction Innovation"},{"issue":"8\/9","key":"2025112406330037600_ref006","doi-asserted-by":"publisher","first-page":"843","DOI":"10.1108\/09600031211269785","article-title":"Towards a methodology for studying supply chain practice","volume":"42","author":"Borgstr\u00f6m","year":"2012","journal-title":"Journal of Physical Distribution and Logistics Management"},{"key":"2025112406330037600_ref051","doi-asserted-by":"publisher","DOI":"10.52399\/001c.22171","article-title":"Abduction as a methodological approach to case study research in management accounting \u2014 an illustrative case","volume":"27","author":"Conaty","year":"2021","journal-title":"Accounting, Finance & Governance Review"},{"issue":"2","key":"2025112406330037600_ref007","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)co.1943-7862.0002410","article-title":"A systematic literature review and conceptual framework of construction industrialization","volume":"149","author":"Costa","year":"2023","journal-title":"Journal of Construction Engineering and Management"},{"key":"2025112406330037600_ref008","article-title":"4.2. analyzing construction industrialization: a theoretical framework developed from the perspective of organizational change theory","author":"Costa","year":"2024"},{"key":"2025112406330037600_ref009","doi-asserted-by":"publisher","first-page":"222397","DOI":"10.1109\/ACCESS.2020.3043477","article-title":"Developing a fuzzy multi-criteria evaluation model for prefabrication development maturity of construction firms","volume":"8","author":"Dang","year":"2020","journal-title":"IEEE Access"},{"key":"2025112406330037600_ref010","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2021.108400","article-title":"An extended institutional theory perspective on the adoption of circular economy practices: insights from the seafood industry","volume":"247","author":"Do","year":"2022","journal-title":"International Journal of Production Economics"},{"issue":"7","key":"2025112406330037600_ref011","doi-asserted-by":"publisher","first-page":"553","DOI":"10.1016\/S0148-2963(00)00195-8","article-title":"Systematic combining: an abductive approach to case research","volume":"55","author":"Dubois","year":"2002","journal-title":"Journal of Business Research"},{"issue":"4","key":"2025112406330037600_ref012","doi-asserted-by":"publisher","first-page":"1155","DOI":"10.5465\/amr.2007.26586086","article-title":"Methodological fit in management field research","volume":"32","author":"Edmondson","year":"2007","journal-title":"Academy of Management Review"},{"issue":"4","key":"2025112406330037600_ref013","doi-asserted-by":"publisher","first-page":"532","DOI":"10.2307\/258557","article-title":"Building theories from case study reseaerch","volume":"14","author":"Eisenhardt","year":"1989","journal-title":"Academy of Management Review"},{"issue":"1","key":"2025112406330037600_ref014","doi-asserted-by":"publisher","first-page":"25","DOI":"10.1007\/BF01033590","article-title":"Theory building from cases: opportunities and challenges","volume":"50","author":"Eisenhardt","year":"2007","journal-title":"Academy of Management Journal"},{"issue":"3","key":"2025112406330037600_ref015","doi-asserted-by":"publisher","first-page":"438","DOI":"10.1177\/1094428116689707","article-title":"Using theory elaboration to make theoretical advancements","volume":"20","author":"Fisher","year":"2017","journal-title":"Organizational Research Methods"},{"issue":"4","key":"2025112406330037600_ref016","doi-asserted-by":"publisher","first-page":"910","DOI":"10.1108\/IJLM-09-2017-0231","article-title":"Editorial: the qualitative case study","volume":"28","author":"Gammelgaard","year":"2017","journal-title":"International Journal of Logistics Management"},{"issue":"5","key":"2025112406330037600_ref017","doi-asserted-by":"publisher","first-page":"288","DOI":"10.1080\/01446193.2016.1253856","article-title":"The impacts of industrialization on construction subcontractors: a resource based view","volume":"35","author":"Goh","year":"2017","journal-title":"Construction Management and Economics"},{"key":"2025112406330037600_ref018","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2022.108725","article-title":"Circular ecosystem management: orchestrating ecosystem value proposition and configuration","volume":"256","author":"Gomes","year":"2023","journal-title":"International Journal of Production Economics"},{"issue":"3","key":"2025112406330037600_ref019","doi-asserted-by":"publisher","first-page":"163","DOI":"10.1080\/17452007.2014.891501","article-title":"New offsite production and business models in construction: priorities for the future research agenda","volume":"11","author":"Goulding","year":"2015","journal-title":"Architectural Engineering and Design Management"},{"key":"2025112406330037600_ref020","doi-asserted-by":"publisher","first-page":"235","DOI":"10.1016\/j.autcon.2017.12.002","article-title":"Critical evaluation of off-site construction research: a scientometric analysis","volume":"87","author":"Hosseini","year":"2018","journal-title":"Automation in Construction"},{"issue":"9","key":"2025112406330037600_ref054","doi-asserted-by":"publisher","first-page":"1277","DOI":"10.1177\/1049732305276687","article-title":"Three approaches to qualitative content analysis","volume":"15","author":"Hsieh","year":"2005","journal-title":"Qualitative Health Research"},{"issue":"8","key":"2025112406330037600_ref048","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0001674","article-title":"Understanding stakeholders in off-site manufacturing: a literature review","volume":"145","author":"Hu","year":"2019","journal-title":"Journal of Construction Engineering and Management"},{"key":"2025112406330037600_ref049","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2021.127503","article-title":"Modelling in off-site construction supply chain management: a review and future directions for sustainable modular integrated construction","volume":"310","author":"Hussein","year":"2021","journal-title":"Journal of Cleaner Production"},{"issue":"5","key":"2025112406330037600_ref021","doi-asserted-by":"publisher","first-page":"232","DOI":"10.1016\/j.jom.2014.03.004","article-title":"Renaissance of case research as a scientific method","volume":"32","author":"Ketokivi","year":"2014","journal-title":"Journal of Operations Management"},{"issue":"2","key":"2025112406330037600_ref022","doi-asserted-by":"publisher","first-page":"132","DOI":"10.1108\/09600030510590318","article-title":"Abductive reasoning in logistics research","volume":"35","author":"Kov\u00e1cs","year":"2005","journal-title":"International Journal of Physical Distribution and Logistics Management"},{"issue":"5","key":"2025112406330037600_ref023","doi-asserted-by":"publisher","first-page":"494","DOI":"10.1108\/IJOPM-07-2020-0439","article-title":"Servitization for consumer products: an empirical exploration of challenges and benefits for supply chain partners","volume":"41","author":"Kreye","year":"2021","journal-title":"International Journal of Operations and Production Management"},{"issue":"3","key":"2025112406330037600_ref024","doi-asserted-by":"publisher","first-page":"378","DOI":"10.1108\/ci-06-2014-0032","article-title":"Industrialised house-building \u2013 development and conceptual orientation of the field","volume":"15","author":"Lessing","year":"2015","journal-title":"Construction Innovation"},{"issue":"3","key":"2025112406330037600_ref025","doi-asserted-by":"publisher","first-page":"836","DOI":"10.3390\/su10030836","article-title":"Critical success factors for project planning and control in prefabrication housing production: a China study","volume":"10","author":"Li","year":"2018","journal-title":"Sustainability"},{"issue":"3","key":"2025112406330037600_ref050","doi-asserted-by":"publisher","first-page":"343","DOI":"10.1108\/CI-03-2018-0013","article-title":"Trending topics and themes in offsite construction (OSC) research: the application of topic modelling","volume":"19","author":"Liu","year":"2019","journal-title":"Construction Innovation"},{"issue":"9","key":"2025112406330037600_ref026","doi-asserted-by":"publisher","first-page":"2637","DOI":"10.1108\/ECAM-03-2020-0154","article-title":"Exploring a body of knowledge for promoting the sustainable transition to prefabricated construction","volume":"28","author":"Luo","year":"2020","journal-title":"Engineering Construction and Architectural Management"},{"issue":"1","key":"2025112406330037600_ref027","doi-asserted-by":"publisher","first-page":"21","DOI":"10.5465\/AMJ.2005.15993111","article-title":"The social processes of organizational sensemaking","volume":"48","author":"Maitlis","year":"2005","journal-title":"Academy of Management Journal"},{"issue":"3","key":"2025112406330037600_ref028","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)me.1943-5479.0000246","article-title":"Major barriers to off-site construction: the developer\u2019s perspective in China","volume":"31","author":"Mao","year":"2015","journal-title":"Journal of Management in Engineering"},{"issue":"3","key":"2025112406330037600_ref029","doi-asserted-by":"publisher","first-page":"239","DOI":"10.1016\/0272-6963(93)90002-7","article-title":"Conducting case study research in operations management","volume":"11","author":"McCutcheon","year":"1993","journal-title":"Journal of Operations Management"},{"issue":"4","key":"2025112406330037600_ref030","doi-asserted-by":"publisher","first-page":"441","DOI":"10.1016\/s0272-6963(98)00023-0","article-title":"Building operations management theory through case and field research","volume":"16","author":"Meredith","year":"1998","journal-title":"Journal of Operations Management"},{"key":"2025112406330037600_ref055","volume-title":"Qualitative Data Analysis: An Expanded Sourcebook","author":"Miles","year":"1994","edition":"2nd ed."},{"issue":"5","key":"2025112406330037600_ref031","doi-asserted-by":"publisher","first-page":"321","DOI":"10.1108\/09600030210434143","article-title":"Logistics needs qualitative research \u2013 especially action research","volume":"32","author":"N\u00e4slund","year":"2002","journal-title":"International Journal of Physical Distribution and Logistics Management"},{"issue":"11","key":"2025112406330037600_ref032","doi-asserted-by":"publisher","first-page":"1602","DOI":"10.3844\/ajassp.2008.1602.1604","article-title":"Case study: a strategic research methodology","volume":"5","author":"Noor","year":"2008","journal-title":"American Journal of Applied Sciences"},{"key":"2025112406330037600_ref033","doi-asserted-by":"publisher","DOI":"10.1016\/j.jobe.2019.101138","article-title":"Perceptions of offsite construction in the United States: an investigation of current practices","volume":"29","author":"Razkenari","year":"2020","journal-title":"Journal of Building Engineering"},{"issue":"10","key":"2025112406330037600_ref034","doi-asserted-by":"publisher","first-page":"1509","DOI":"10.3390\/buildings12101509","article-title":"Barriers to the adoption of modular construction in Portugal: an interpretive structural modeling approach","volume":"12","author":"Ribeiro","year":"2022","journal-title":"Buildings"},{"issue":"11","key":"2025112406330037600_ref035","doi-asserted-by":"publisher","first-page":"1095","DOI":"10.1108\/01443570810910908","article-title":"Implementing strategic initiatives: a framework of leading practices","volume":"28","author":"Saunders","year":"2008","journal-title":"International Journal of Operations and Production Management"},{"issue":"3","key":"2025112406330037600_ref036","doi-asserted-by":"publisher","first-page":"346","DOI":"10.5465\/amr.2010.51141319","article-title":"Editor\u2019s comments: construct clarity in theories of management and organization","volume":"35","author":"Suddaby","year":"2010","journal-title":"Academy of Management Review"},{"issue":"4","key":"2025112406330037600_ref037","doi-asserted-by":"publisher","first-page":"443","DOI":"10.1108\/SCM-04-2019-0153","article-title":"The impact of phenomenological methodology development in supply chain management research","volume":"25","author":"Towers","year":"2020","journal-title":"Supply Chain Management"},{"issue":"2","key":"2025112406330037600_ref038","doi-asserted-by":"publisher","first-page":"195","DOI":"10.1108\/01443570210414329","article-title":"Case research in operations management","volume":"22","author":"Voss","year":"2002","journal-title":"International Journal of Operations and Production Management"},{"issue":"10","key":"2025112406330037600_ref039","doi-asserted-by":"publisher","first-page":"4029","DOI":"10.3390\/SU12104029","article-title":"A building project-based industrialized construction maturity model involving organizational enablers: a multi-case study in China","volume":"12","author":"Wang","year":"2020","journal-title":"Sustainability"},{"key":"2025112406330037600_ref040","doi-asserted-by":"publisher","first-page":"753","DOI":"10.1016\/j.jclepro.2019.02.110","article-title":"Factors influencing the application of prefabricated construction in China: from perspectives of technology promotion and cleaner production","volume":"219","author":"Wu","year":"2019","journal-title":"Journal of Cleaner Production"},{"issue":"5","key":"2025112406330037600_ref041","doi-asserted-by":"publisher","first-page":"117","DOI":"10.3390\/buildings9050117","article-title":"Holistic review and conceptual framework for the drivers of offsite construction: a total interpretive structural modelling approach","volume":"9","author":"Wuni","year":"2019","journal-title":"Buildings"},{"key":"2025112406330037600_ref042","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2019.119347","article-title":"Barriers to the adoption of modular integrated construction: systematic review and meta-analysis, integrated conceptual framework, and strategies","volume":"249","author":"Wuni","year":"2020","journal-title":"Journal of Cleaner Production"},{"issue":"2","key":"2025112406330037600_ref043","doi-asserted-by":"publisher","first-page":"133","DOI":"10.1080\/15623599.2019.1613212","article-title":"Critical risk factors in the application of modular integrated construction: a systematic review","volume":"22","author":"Wuni","year":"2022","journal-title":"International Journal of Construction Management"},{"key":"2025112406330037600_ref053","volume-title":"Case Study Research: Design and Methods","author":"Yin","year":"1994"},{"key":"2025112406330037600_ref044","doi-asserted-by":"publisher","first-page":"141","DOI":"10.1037\/13620-009","volume-title":"APA Handbook of Research Methods in Psychology, Vol 2: Research Designs: Quantitative, Qualitative, Neuropsychological, and Biological","author":"Yin","year":"2012"},{"key":"2025112406330037600_ref052","volume-title":"Case Study Research and Applications: Design and Methods","author":"Yin","year":"2018","edition":"6th ed."},{"issue":"1-2","key":"2025112406330037600_ref045","doi-asserted-by":"publisher","first-page":"3","DOI":"10.1080\/17452007.2017.1291410","article-title":"Contextual, structural and behavioural factors influencing the adoption of industrialised building systems: a review","volume":"14","author":"Zakaria","year":"2018","journal-title":"Architectural Engineering and Design Management"},{"issue":"9","key":"2025112406330037600_ref046","doi-asserted-by":"publisher","first-page":"1","DOI":"10.3390\/su14095418","article-title":"Critical factors influencing interface management of prefabricated building projects: evidence from China","volume":"14","author":"Zhang","year":"2022","journal-title":"Sustainability"},{"issue":"1","key":"2025112406330037600_ref047","doi-asserted-by":"publisher","first-page":"70","DOI":"10.2189\/asqu.52.1.70","article-title":"How entrepreneurs use symbolic management to acquire resources","volume":"52","author":"Zott","year":"2007","journal-title":"Administrative Science Quarterly"}],"container-title":["Engineering, Construction and Architectural Management"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/ecam\/article-pdf\/doi\/10.1108\/ECAM-04-2024-0521\/10837367\/ecam-04-2024-0521en.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"syndication"},{"URL":"https:\/\/www.emerald.com\/ecam\/article-pdf\/doi\/10.1108\/ECAM-04-2024-0521\/10837367\/ecam-04-2024-0521en.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,11,24]],"date-time":"2025-11-24T11:33:08Z","timestamp":1763983988000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.emerald.com\/ecam\/article\/doi\/10.1108\/ECAM-04-2024-0521\/1317981\/The-construction-industrialization-process-results"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,11,24]]},"references-count":55,"URL":"https:\/\/doi.org\/10.1108\/ecam-04-2024-0521","relation":{},"ISSN":["0969-9988","1365-232X"],"issn-type":[{"value":"0969-9988","type":"print"},{"value":"1365-232X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,11,24]]}}}