{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,28]],"date-time":"2026-01-28T22:36:22Z","timestamp":1769639782416,"version":"3.49.0"},"reference-count":42,"publisher":"Emerald","funder":[{"name":"FCT \u2013 Funda\u00e7\u00e3o para a Ci\u00eancia e Tecnologia","award":["UID\/00319\/2025"],"award-info":[{"award-number":["UID\/00319\/2025"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"abstract":"<jats:sec>\n                    <jats:title>Purpose<\/jats:title>\n                    <jats:p>Modular integrated construction is a construction industrialization approach which arises as an alternative to traditional methods and has a substantial impact on the design, development and management of construction projects. This study aims to improve the design process in modular integrated construction through the identification and analysis of different levels of construction modularization. To do so, a modularity decomposition approach to product architecture is applied<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Design\/methodology\/approach<\/jats:title>\n                    <jats:p>This study uses a hybrid method that combines hierarchical clustering (cladistics) with a design structure matrix for determining the optimal granularity level for the product architecture and generating modules with the minimum external interfaces and maximum internal integration. The proposed method is validated through a case study, conducted on a three-dimensional prefabricated structure comprising a kitchenette and toilet unit meant for university residence rooms.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Findings<\/jats:title>\n                    <jats:p>The application of the proposed approach in the construction case study effectively identified the ideal granularity level on which an objective definition of various modularization levels may be established. The results demonstrate the potential of the technique to identify viable product and process platforms and suggest that the approach is capable of guiding modular design decisions and improving integration in construction projects.<\/jats:p>\n                  <\/jats:sec>\n                  <jats:sec>\n                    <jats:title>Originality\/value<\/jats:title>\n                    <jats:p>This research introduces a novel application of a previously researched modularity decomposition technique \u2013 originally developed for the automotive industry \u2013 to the industrialized construction sector as a structured and objective method for determining different levels of construction modularization. The findings indicate its potential to analyze increasingly complex building units and advancing construction industrialization efforts.<\/jats:p>\n                  <\/jats:sec>","DOI":"10.1108\/jedt-06-2025-0283","type":"journal-article","created":{"date-parts":[[2026,1,28]],"date-time":"2026-01-28T10:01:33Z","timestamp":1769594493000},"page":"1-21","source":"Crossref","is-referenced-by-count":0,"title":["Determining different levels of modularization on a construction project through a product architecture modularity decomposition approach \u2013 a case study"],"prefix":"10.1108","author":[{"given":"Maria Alice","family":"Guerra","sequence":"first","affiliation":[{"name":"University of Minho Department of Production and Systems, School of Engineering, , Guimaraes,","place":["Portugal"]}]},{"given":"Maria Sameiro","family":"Carvalho","sequence":"additional","affiliation":[{"name":"University of Minho Department of Production and Systems, School of Engineering, ALGORITMI Research Centre, , Guimaraes,","place":["Portugal"]}]},{"given":"Carina","family":"Pimentel","sequence":"additional","affiliation":[{"name":"University of Minho Department of Production and Systems, School of Engineering, ALGORITMI Research Centre, , Guimaraes,","place":["Portugal"]}]},{"given":"Cl\u00e1udia","family":"Duarte","sequence":"additional","affiliation":[{"name":"dstgroup Department of Logistic Projects and Processes, , Braga,","place":["Portugal"]}]},{"given":"Sara","family":"Costa","sequence":"additional","affiliation":[{"name":"University of Minho Department of Production and Systems, School of Engineering, ALGORITMI Research Centre, , Guimaraes,","place":["Portugal"]}]}],"member":"140","published-online":{"date-parts":[[2026,1,30]]},"reference":[{"issue":"1","key":"2026012805012869700_ref001","doi-asserted-by":"publisher","first-page":"151","DOI":"10.1016\/j.cirp.2013.03.118","article-title":"Optimum granularity level of modular product design architecture","volume":"62","author":"Algeddawy","year":"2013","journal-title":"CIRP Annals"},{"issue":"3","key":"2026012805012869700_ref002","doi-asserted-by":"publisher","first-page":"292","DOI":"10.1109\/17.946528","article-title":"Applying the design structure matrix to system decomposition and integration problems: a review and new directions","volume":"48","author":"Browning","year":"2001","journal-title":"IEEE Transactions on Engineering Management"},{"key":"2026012805012869700_ref003","doi-asserted-by":"publisher","DOI":"10.3389\/fbioe.2021.791566","article-title":"Identification of influential modules considering design change impacts based on parallel Breadth-First search and bat algorithm","volume":"9","author":"Cheng","year":"2022","journal-title":"Frontiers in Bioengineering and Biotechnology, Frontiers Media S.A"},{"issue":"1","key":"2026012805012869700_ref004","doi-asserted-by":"publisher","first-page":"467","DOI":"10.1016\/j.cirp.2008.03.136","article-title":"Modelling evolution in manufacturing: a biological analogy","volume":"57","author":"ElMaraghy","year":"2008","journal-title":"CIRP Annals"},{"issue":"2","key":"2026012805012869700_ref005","doi-asserted-by":"publisher","first-page":"219","DOI":"10.1177\/1077800405284363","article-title":"Five misunderstandings about case-study research","volume":"12","author":"Flyvbjerg","year":"2006","journal-title":"Qualitative Inquiry"},{"issue":"5","key":"2026012805012869700_ref006","doi-asserted-by":"publisher","first-page":"288","DOI":"10.1080\/01446193.2016.1253856","article-title":"The impacts of industrialization on construction subcontractors: a resource based view","volume":"35","author":"Goh","year":"2017","journal-title":"Construction Management and Economics"},{"issue":"11","key":"2026012805012869700_ref007","doi-asserted-by":"crossref","first-page":"4016062","DOI":"10.1061\/(ASCE)CO.1943-7862.0001181","article-title":"Defining and categorizing modules in building projects: an international perspective","volume":"142","author":"Gosling","year":"2016","journal-title":"Journal of Construction Engineering and Management"},{"issue":"2","key":"2026012805012869700_ref008","doi-asserted-by":"publisher","DOI":"10.3390\/su12020530","article-title":"Integrated design process for modular construction projects to reduce rework","volume":"12","author":"Hyun","year":"2020","journal-title":"Sustainability (Switzerland), MDPI"},{"key":"2026012805012869700_ref009","doi-asserted-by":"publisher","first-page":"55","DOI":"10.1016\/j.procir.2016.01.023","article-title":"Optimum overall product modularity","volume":"44","author":"Kashkoush","year":"2016","journal-title":"Procedia CIRP"},{"key":"2026012805012869700_ref010","volume-title":"Cladistics: The Theory and Practice of Parsimony Analysis","author":"Kitching","year":"1998","edition":"11th"},{"issue":"1","key":"2026012805012869700_ref011","doi-asserted-by":"publisher","first-page":"19","DOI":"10.1016\/S0167-2681(02)00056-2","article-title":"Modularity in technology and organization","volume":"49","author":"Langlois","year":"2002","journal-title":"Journal of Economic Behavior and Organization"},{"issue":"5","key":"2026012805012869700_ref012","doi-asserted-by":"publisher","first-page":"1525","DOI":"10.1007\/s12205-016-1085-1","article-title":"Workflow dependency approach for modular building construction manufacturing process using dependency structure matrix (DSM)","volume":"21","author":"Lee","year":"2017","journal-title":"KSCE Journal of Civil Engineering"},{"issue":"1-2","key":"2026012805012869700_ref013","doi-asserted-by":"publisher","first-page":"26","DOI":"10.1007\/s00170-006-0712-2","article-title":"On the module identification for product family development","volume":"35","author":"Meng","year":"2007","journal-title":"The International Journal of Advanced Manufacturing Technology"},{"issue":"2","key":"2026012805012869700_ref014","doi-asserted-by":"publisher","first-page":"128","DOI":"10.1111\/j.1540-5885.2006.00188.x","article-title":"Capturing the degree of modularity embedded in product architectures*","volume":"23","author":"Mikkola","year":"2006","journal-title":"Journal of Product Innovation Management"},{"key":"2026012805012869700_ref015","doi-asserted-by":"publisher","first-page":"153","DOI":"10.1016\/j.autcon.2019.03.021","article-title":"Dependency structure matrix and hierarchical clustering based algorithm for optimum module identification in MEP systems","volume":"104","author":"Samarasinghe","year":"2019","journal-title":"Automation in Construction"},{"issue":"3","key":"2026012805012869700_ref016","doi-asserted-by":"crossref","first-page":"311","DOI":"10.1016\/S0167-2681(99)00012-8","article-title":"Product design partitions with complementary components","volume":"38","author":"Schaefer","year":"1999","journal-title":"Journal of Economic Behavior and Organization"},{"issue":"1-2","key":"2026012805012869700_ref017","doi-asserted-by":"publisher","first-page":"160","DOI":"10.1080\/01446193.2013.847274","article-title":"Evaluating the adaptability of an industrialized building using dependency structure matrices","volume":"32","author":"Schmidt","year":"2014","journal-title":"Construction Management and Economics, Routledge"},{"issue":"2","key":"2026012805012869700_ref018","doi-asserted-by":"publisher","DOI":"10.1061\/(asce)ae.1943-5568.0000313","article-title":"Identification of factors and decision analysis of the level of modularization in building construction","volume":"24","author":"Sharafi","year":"2018","journal-title":"Journal of Architectural Engineering"},{"key":"2026012805012869700_ref019","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1016\/j.autcon.2017.06.025","article-title":"Automated spatial design of multi-story modular buildings using a unified matrix method","volume":"82","author":"Sharafi","year":"2017","journal-title":"Automation in Construction, Elsevier B.V"},{"issue":"1","key":"2026012805012869700_ref020","doi-asserted-by":"publisher","first-page":"2","DOI":"10.1007\/s001630100002","article-title":"Product platform design: Method and application","volume":"13","author":"Simpson","year":"2001","journal-title":"Research in Engineering Design"},{"issue":"1","key":"2026012805012869700_ref021","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1016\/S0142-694X(99)00003-4","article-title":"A heuristic method for identifying modules for product architectures","volume":"21","author":"Stone","year":"2000","journal-title":"Design Studies"},{"key":"2026012805012869700_ref022","doi-asserted-by":"crossref","DOI":"10.1016\/0048-7333(94)00775-3","volume-title":"The Role of Product Architecture in the Manufacturing Firm","author":"Ulrich","year":"1995"},{"issue":"9","key":"2026012805012869700_ref023","doi-asserted-by":"publisher","DOI":"10.3390\/buildings13092330","article-title":"Multiresolution modeling of a modular building design process based on design structure matrix","volume":"13","author":"Wang","year":"2023","journal-title":"Buildings, Multidisciplinary Digital Publishing Institute (MDPI"},{"issue":"7","key":"2026012805012869700_ref024","doi-asserted-by":"publisher","first-page":"763","DOI":"10.1080\/09613218.2019.1669009","article-title":"Critical success factors for modular integrated construction projects: a review","volume":"48","author":"Wuni","year":"2020","journal-title":"Building Research and Information"},{"key":"2026012805012869700_ref025","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2019.119347","article-title":"Barriers to the adoption of modular integrated construction: Systematic review and meta-analysis, integrated conceptual framework, and strategies","volume":"249","author":"Wuni","year":"2020","journal-title":"Journal of Cleaner Production"},{"issue":"5","key":"2026012805012869700_ref026","doi-asserted-by":"publisher","first-page":"929","DOI":"10.1080\/15623599.2019.1668633","article-title":"Towards a decision support for modular integrated construction: an integrative review of the primary decision-making actors","volume":"22","author":"Wuni","year":"2022","journal-title":"International Journal of Construction Management"},{"issue":"2","key":"2026012805012869700_ref027","doi-asserted-by":"publisher","first-page":"91","DOI":"10.1007\/s00163-007-0030-1","article-title":"An information theoretic method for developing modular architectures using genetic algorithms","volume":"18","author":"Yu","year":"2007","journal-title":"Research in Engineering Design"},{"key":"2026012805012869700_ref028","article-title":"A Science-Based approach to product design theory part I: Formulation and formalization of design process","volume":"15","author":"Zeng","year":"1999","journal-title":"Robotics and Computer Integrated Manufacturing"},{"key":"2026012805012869700_ref029","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2022.101622","article-title":"Product platform configuration for product families: Module clustering based on product architecture and manufacturing process","volume":"52","author":"Zhao","year":"2022","journal-title":"Advanced Engineering Informatics"},{"key":"2026012805012869700_ref030","volume-title":"Reinventing Construction: A Route of Higher Productivity","author":"Barbosa","year":"2017"},{"issue":"2","key":"2026012805012869700_ref031","doi-asserted-by":"publisher","first-page":"121","DOI":"10.1080\/01446190500184444","article-title":"Benefit evaluation for off-site production in construction","volume":"24","author":"Blismas","year":"2006","journal-title":"Construction Management and Economics"},{"issue":"6","key":"2026012805012869700_ref032","doi-asserted-by":"publisher","first-page":"632","DOI":"10.1016\/j.compind.2012.03.007","article-title":"Product decomposition using design structure matrix for intellectual property protection in supply chain outsourcing","volume":"63","author":"Deng","year":"2012","journal-title":"Computers in Industry"},{"issue":"4","key":"2026012805012869700_ref033","doi-asserted-by":"publisher","first-page":"260","DOI":"10.1108\/13598541111139071","article-title":"An examination of a modular supply chain: a construction sector perspective","volume":"16","author":"Doran","year":"2011","journal-title":"Supply Chain Management: An International Journal"},{"issue":"2","key":"2026012805012869700_ref034","doi-asserted-by":"publisher","first-page":"146","DOI":"10.1080\/09613210302000","article-title":"Re-engineering through pre-assembly: Client expectations and drivers","volume":"31","author":"Gibb","year":"2010","journal-title":"Building Research and Information"},{"issue":"1","key":"2026012805012869700_ref035","doi-asserted-by":"publisher","first-page":"31","DOI":"10.1080\/09613210802628003","article-title":"Matching supply networks to a modular product architecture in the house- building industry","volume":"37","author":"Hofman","year":"2009","journal-title":"Building Research and Information"},{"key":"2026012805012869700_ref036","doi-asserted-by":"publisher","first-page":"127503","DOI":"10.1016\/j.jclepro.2021.127503","article-title":"Modelling in off-site construction supply chain management: a review and future directions for sustainable modular integrated construction","volume":"310","author":"Hussein","year":"2021","journal-title":"Journal of Cleaner Production"},{"issue":"1-2","key":"2026012805012869700_ref037","doi-asserted-by":"publisher","DOI":"10.1080\/01446193.2013.833666","article-title":"Industrialized construction in the Swedish infrastructure sector: Core elements and barriers","volume":"32","author":"Larsson","year":"2014","journal-title":"Construction Management and Economics"},{"issue":"3","key":"2026012805012869700_ref038","doi-asserted-by":"publisher","first-page":"203","DOI":"10.1080\/01446193.2012.664277","article-title":"The nature of choice in mass customized house building","volume":"30","author":"Manuel Schoenwitz","year":"2012","journal-title":"Construction Management and Economics"},{"issue":"11","key":"2026012805012869700_ref039","doi-asserted-by":"publisher","first-page":"1331","DOI":"10.1061\/(ASCE)CO.1943-7862.0000544","article-title":"Strategies for integrating the use of off-site production technologies in house building","volume":"138","author":"Pan","year":"2012","journal-title":"Journal of Construction Engineering and Management"},{"issue":"1","key":"2026012805012869700_ref040","doi-asserted-by":"publisher","first-page":"32","DOI":"10.1080\/01446193.2017.1353119","article-title":"Categorizing modularization strategies to achieve various objectives of building investments","volume":"36","author":"Peltokorpi","year":"2018","journal-title":"Construction Management and Economics"},{"issue":"4","key":"2026012805012869700_ref041","doi-asserted-by":"publisher","first-page":"656","DOI":"10.1080\/15623599.2021.1907525","article-title":"A critical analysis of benefits and challenges of implementing modular integrated construction","volume":"23","author":"Tsz Wai","year":"2023","journal-title":"International Journal of Construction Management"},{"issue":"3-4","key":"2026012805012869700_ref042","doi-asserted-by":"publisher","first-page":"169","DOI":"10.1016\/S0969-7012(00)00013-7","article-title":"The four roles of supply chain management in construction","volume":"6","author":"Vrijhoef","year":"2000","journal-title":"European Journal of Purchasing and Supply Management"}],"container-title":["Journal of Engineering, Design and Technology"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.emerald.com\/jedt\/article-pdf\/doi\/10.1108\/JEDT-06-2025-0283\/11204663\/jedt-06-2025-0283en.pdf","content-type":"application\/pdf","content-version":"vor","intended-application":"syndication"},{"URL":"https:\/\/www.emerald.com\/jedt\/article-pdf\/doi\/10.1108\/JEDT-06-2025-0283\/11204663\/jedt-06-2025-0283en.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2026,1,28]],"date-time":"2026-01-28T10:01:37Z","timestamp":1769594497000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.emerald.com\/jedt\/article\/doi\/10.1108\/JEDT-06-2025-0283\/1338002\/Determining-different-levels-of-modularization-on"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2026,1,30]]},"references-count":42,"URL":"https:\/\/doi.org\/10.1108\/jedt-06-2025-0283","relation":{},"ISSN":["1726-0531","1758-8901"],"issn-type":[{"value":"1726-0531","type":"print"},{"value":"1758-8901","type":"electronic"}],"subject":[],"published":{"date-parts":[[2026,1,30]]}}}