{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,10,29]],"date-time":"2024-10-29T09:24:21Z","timestamp":1730193861088,"version":"3.28.0"},"reference-count":14,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2014,6]]},"DOI":"10.1109\/acc.2014.6859137","type":"proceedings-article","created":{"date-parts":[[2014,7,29]],"date-time":"2014-07-29T21:01:49Z","timestamp":1406667709000},"page":"1358-1363","source":"Crossref","is-referenced-by-count":2,"title":["Fuzzified Viterbi algorithm for hour-ahead wind power prediction"],"prefix":"10.1109","author":[{"given":"Saeed","family":"Jafarzadeh","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Sami","family":"Fadali","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"journal-title":"Uncertain Rule-Based Fuzzy Logic Systems Introduction and New Directions","year":"2001","author":"mendel","key":"13"},{"key":"14","first-page":"525","article-title":"A new operation on triangular fuzzy number for solving fuzzy linear programming problem","volume":"6","author":"gani","year":"2012","journal-title":"Applied Mathematical Sciences"},{"journal-title":"Mathematical Methods and Algorithms for Signal Processing","year":"1999","author":"moon","key":"11"},{"key":"12","doi-asserted-by":"publisher","DOI":"10.1109\/5.18626"},{"key":"3","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2007.901117"},{"key":"2","doi-asserted-by":"publisher","DOI":"10.1109\/MPAE.2005.1524621"},{"key":"1","doi-asserted-by":"publisher","DOI":"10.1109\/PCT.2007.4538368"},{"journal-title":"Wind Generation & Total Load in the BPA Balancing Authority","year":"0","key":"10"},{"key":"7","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2009.5282207"},{"key":"6","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2009.5275512"},{"key":"5","article-title":"Benefits of stochastic scheduling for power systems with significant installed wind power","author":"tuohy","year":"2008","journal-title":"Proc Probabilistic Methods Applied to Electric Power Systems"},{"key":"4","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2008.4596389"},{"key":"9","doi-asserted-by":"publisher","DOI":"10.1109\/PES.2010.5589844"},{"journal-title":"The State of the Art in Short-Term Prediction of Wind Power A Literature Overview","year":"0","author":"giebel","key":"8"}],"event":{"name":"2014 American Control Conference - ACC 2014","start":{"date-parts":[[2014,6,4]]},"location":"Portland, OR, USA","end":{"date-parts":[[2014,6,6]]}},"container-title":["2014 American Control Conference"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6849600\/6858556\/06859137.pdf?arnumber=6859137","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,23]],"date-time":"2017-03-23T18:57:06Z","timestamp":1490295426000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/6859137\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,6]]},"references-count":14,"URL":"https:\/\/doi.org\/10.1109\/acc.2014.6859137","relation":{},"subject":[],"published":{"date-parts":[[2014,6]]}}}