{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,28]],"date-time":"2025-10-28T03:15:05Z","timestamp":1761621305784,"version":"3.37.3"},"reference-count":44,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2017,1,1]],"date-time":"2017-01-01T00:00:00Z","timestamp":1483228800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/OAPA.html"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2017]]},"DOI":"10.1109\/access.2017.2676352","type":"journal-article","created":{"date-parts":[[2017,3,1]],"date-time":"2017-03-01T19:17:01Z","timestamp":1488395821000},"page":"4954-4966","source":"Crossref","is-referenced-by-count":24,"title":["EMC Regulations and Spectral Constraints for Multicarrier Modulation in PLC"],"prefix":"10.1109","volume":"5","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-7601-3305","authenticated-orcid":false,"given":"Mauro","family":"Girotto","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-9873-2407","authenticated-orcid":false,"given":"Andrea M.","family":"Tonello","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"article-title":"Pathloss as a function of frequency, distance and network topology for various LV and MV European powerline networks","year":"2005","author":"babic","key":"ref39"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1109\/ICASSP.1997.599568"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1109\/MCOM.2011.6094004"},{"journal-title":"Narrowband Orthogonal Frequency Division Multiplexing Power Line Communication Transceivers for G3-PLC Networks","year":"2012","key":"ref32"},{"journal-title":"Narrowband Orthogonal Frequency Division Multiplexing Power Line Communication Transceivers for PRIME Networks","year":"2012","key":"ref31"},{"journal-title":"Discrete-Time Signal Processing","year":"1999","author":"oppenheim","key":"ref30"},{"year":"2010","key":"ref37"},{"journal-title":"Unified High-speed Wire-line Based Home Networking Transceivers - System Architecture and Physical Layer Specification","year":"2009","key":"ref36"},{"year":"2013","key":"ref35"},{"journal-title":"Narrowband orthogonal frequency division multiplexing power line communication transceivers for ITU-T G hnem networks","year":"2012","key":"ref34"},{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1109\/TCOM.1967.1089674"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2006.886796"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1109\/ISPLC.2007.371100"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/JSAC.2002.1007382"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/TCOMM.2009.05.070328"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1186\/1687-6180-2014-109"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/GLOCOM.2014.7037264"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/ISPLC.2013.6525858"},{"journal-title":"Introduction to Electromagnetic Compatibility","year":"2006","author":"paul","key":"ref17"},{"journal-title":"Electromagnetic Compatibility Engineering","year":"2011","author":"ott","key":"ref18"},{"journal-title":"Information Technology Equipment&#x2014;Radio Disturbance Characteristics&#x2014;Limits and Methods of Measurement","year":"2008","key":"ref19"},{"journal-title":"Cyclostationarity in Communications and Signal Processing","year":"1994","author":"gardner","key":"ref28"},{"journal-title":"Power Line Communication Equipment (10 kHz&#x2013;450 kHz)","year":"2012","key":"ref4"},{"journal-title":"Power line communication apparatus used in low-voltage installations&#x2014;Radio disturbance characteristics&#x2014;Limits and methods of measurement&#x2014;Part 1 Apparatus for in-home use","year":"2012","key":"ref27"},{"year":"0","key":"ref3"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1002\/9781118676684"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1109\/TEMC.2005.847410"},{"journal-title":"MIMO Power Line Communications Narrow and Broadband Standards EMC and Advanced Processing","year":"2014","author":"berger","key":"ref5"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/ICC.1999.767928"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/35.54342"},{"journal-title":"Signalling on Low-Voltage Electrical Installations in the Frequency Range 3 kHz to 148 5 kHz&#x2014;Part 1 General Requirements Frequency Bands and Electromagnetic Disturbances","year":"2011","key":"ref2"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/49.475531"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/JSAC.2016.2566018"},{"journal-title":"Information Technology Equipment&#x2014;Radio Disturbance Characteristics&#x2014;Limits and Methods of Measurement","year":"2006","key":"ref20"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/EMCZUR.2006.215020"},{"journal-title":"Specification of Radio Disturbance and Immunity Measuring Apparatus and Methods Part1 Radio Disturbance and Immunity Measuring Apparatus","year":"2002","key":"ref21"},{"key":"ref42","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2012.2196714"},{"journal-title":"Amendment to CISPR 22 Clarification of Its Application to Telecommunication System on the Method of Disturbance Measurement at Ports Used for PLC (Power Line Communication)","year":"2003","key":"ref24"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1587\/transcom.E97.B.1494"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/TEMC.2013.2261302"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2008.919397"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1109\/ISPLC.2011.5764413"},{"article-title":"PLC channel characterization and modelling","year":"2011","author":"tlich","key":"ref43"},{"journal-title":"Amendment 1 to CISPR 22 Ed 6 0 Addition of limits and methods of measurement for conformance testing of power line telecommunication ports intended for the connection to the mains","year":"2009","key":"ref25"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/7859429\/07867791.pdf?arnumber=7867791","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,10,11]],"date-time":"2021-10-11T02:59:19Z","timestamp":1633921159000},"score":1,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/7867791\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2017]]},"references-count":44,"URL":"https:\/\/doi.org\/10.1109\/access.2017.2676352","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2017]]}}}