{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,21]],"date-time":"2025-02-21T20:17:49Z","timestamp":1740169069892,"version":"3.37.3"},"reference-count":32,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/OAPA.html"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["71801160"],"award-info":[{"award-number":["71801160"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100002858","name":"China Postdoctoral Science Foundation","doi-asserted-by":"publisher","award":["2018M641711"],"award-info":[{"award-number":["2018M641711"]}],"id":[{"id":"10.13039\/501100002858","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100007620","name":"Department of Education of Liaoning Province","doi-asserted-by":"publisher","award":["WQGD2017024"],"award-info":[{"award-number":["WQGD2017024"]}],"id":[{"id":"10.13039\/501100007620","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2019]]},"DOI":"10.1109\/access.2018.2886907","type":"journal-article","created":{"date-parts":[[2018,12,14]],"date-time":"2018-12-14T21:54:40Z","timestamp":1544824480000},"page":"4284-4294","source":"Crossref","is-referenced-by-count":3,"title":["A Connecting Timetable Rescheduling Model for Production and Rail Transportation With Unexpected Disruptions"],"prefix":"10.1109","volume":"7","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-0310-9402","authenticated-orcid":false,"given":"Yang","family":"Jiang","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaoye","family":"Zhou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1007\/s00291-005-0029-9"},{"key":"ref31","first-page":"164","article-title":"An intermodal hub-and-spoke network design problem for hazardous materials incorporating multiple stakeholders","volume":"6","author":"jiang","year":"2013","journal-title":"Disaster Advances"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/j.trc.2014.11.001"},{"journal-title":"Solving the Integrated Scheduling of Production and Rail Transportation Problem by Keshtel Algorithm","year":"2014","author":"hajiaghaei-keshteli","key":"ref10"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.cam.2008.12.022"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2010.05.060"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2016.09.019"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1155\/2017\/3460721"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2015.06.004"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1155\/2015\/804968"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(86)90105-1"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/ICSESS.2014.6933567"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2009.06.030"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1016\/j.trb.2016.07.006"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2016.12.010"},{"key":"ref27","article-title":"Optimizing last trains timetable in the urban rail network: Social welfare and synchronization","author":"yin","year":"0","journal-title":"Transp B Transp Dyn"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1155\/2016\/9315197"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.65.574"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1016\/j.trb.2016.11.005"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1002\/nav.20175"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1155\/2014\/475606"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.09.059"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.11.047"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1080\/00207540500066895"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(03)00364-3"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/ROBOT.1992.220090"},{"key":"ref22","first-page":"4898","article-title":"A flexible job-shop rescheduling method by considering the machine equipment availability","author":"gu","year":"2016","journal-title":"Proc Chin Control Dec Conf (CCDC)"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2018.04.008"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2018.08.002"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2016.11.002"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1016\/j.omega.2014.07.005"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000559"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8600701\/08576522.pdf?arnumber=8576522","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,26]],"date-time":"2022-01-26T01:33:28Z","timestamp":1643160808000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8576522\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"references-count":32,"URL":"https:\/\/doi.org\/10.1109\/access.2018.2886907","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2019]]}}}