{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,8,15]],"date-time":"2025-08-15T02:03:18Z","timestamp":1755223398557,"version":"3.43.0"},"reference-count":28,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/ieeexplore.ieee.org\/Xplorehelp\/downloads\/license-information\/OAPA.html"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["U1734202"],"award-info":[{"award-number":["U1734202"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Sichuan Province of China Youth Science and Technology Innovation Team","award":["2016TD0012"],"award-info":[{"award-number":["2016TD0012"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2019]]},"DOI":"10.1109\/access.2019.2922980","type":"journal-article","created":{"date-parts":[[2019,6,14]],"date-time":"2019-06-14T15:59:58Z","timestamp":1560527998000},"page":"78597-78615","source":"Crossref","is-referenced-by-count":12,"title":["Research on Electromagnetic Transient Processes of Long Marshalling High-Speed Train Passing Articulated Split-Phase Region"],"prefix":"10.1109","volume":"7","author":[{"ORCID":"https:\/\/orcid.org\/0000-0003-0461-3843","authenticated-orcid":false,"given":"Ke","family":"Huang","sequence":"first","affiliation":[{"name":"School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China"}]},{"given":"Zhigang","family":"Liu","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China"}]},{"given":"Xin","family":"Li","sequence":"additional","affiliation":[{"name":"School of Electrical Engineering, Southwest Jiaotong University, Chengdu, China"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-53778-3_22"},{"key":"ref11","first-page":"103","article-title":"Research of over-voltages of electric locomotive passing the articulated phase insulator","volume":"30","author":"yan-sheng","year":"2008","journal-title":"J China Railway Soc"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1002\/etep.2376"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.2219\/rtriqr.50.70"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1541\/ieejpes.125.754"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TIM.2017.2663522"},{"key":"ref16","first-page":"21","article-title":"EMC experiment and protection method on control vehicle speed and distance measuring equipment of CRH2 HST","volume":"7","author":"yang","year":"2010","journal-title":"Journal of Railway Signalling & Communication"},{"key":"ref17","first-page":"433","article-title":"Electromagnetic interference measurement and analysis of high-speed electric multiple units speed sensor","volume":"29","author":"yan","year":"2015","journal-title":"J Electron Meas Instrum"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2912219"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2005.844271"},{"key":"ref28","first-page":"119","article-title":"On some technical key problems in the development of traction power supply system for high-speed railway in China","volume":"4","author":"qun-zhan","year":"2010","journal-title":"J China Railway Soc"},{"key":"ref4","first-page":"44","article-title":"Analysis and repressive methods of high-speed EMU carriage overvoltage caused by lightning strike on catenary","volume":"40","author":"cao","year":"2018","journal-title":"J China Railway Soc"},{"journal-title":"Railway Integrated Grounding and Signal Equipment Lightning Protection System Engineering Design Guide[M]","year":"2009","key":"ref27"},{"key":"ref3","first-page":"117","article-title":"Analysis of railcar&#x2019;s body over-voltage for electric multiple unit in the case of lightning catenary","volume":"10","author":"han","year":"2013","journal-title":"Journal of Railway Engineering Society"},{"key":"ref6","first-page":"118","article-title":"EMU-traction network modeling of high speed railway and electromagnetic transient influence considering secondary arcing of pantograph catenary","volume":"38","author":"song","year":"2018","journal-title":"Electr Power Autom Equip"},{"key":"ref5","first-page":"1","article-title":"Influence of grounding mode on surge voltage in the process of pantograph rising for high speed train","author":"wan","year":"2016","journal-title":"Proc IEEE Int Conf High Voltage Eng Appl"},{"key":"ref8","first-page":"184","article-title":"Electromagnetic transient influence of pantograph detachment arcing for traction network in high-speed railway based on state space analysis method","volume":"37","author":"song","year":"2017","journal-title":"Electr Power Autom Equip"},{"key":"ref7","first-page":"38","article-title":"Analysis on railcar&#x2019;s body over-voltage distributional characteristics considering operating conditions of high-speed railway station","volume":"38","author":"huang","year":"2016","journal-title":"J China Railway Soc"},{"key":"ref2","first-page":"46","article-title":"Analysis of surge overvoltage of dropping pantograph for high-speed EMUs","volume":"37","author":"yang","year":"2015","journal-title":"J China Railway Soc"},{"key":"ref9","first-page":"260","article-title":"Analysis of vehicle body over-voltage under ground&#x2019;s automatic electrical phase","author":"huang","year":"2015","journal-title":"Proc Int Conf Inf Sci Technol"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2009.2021036"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1002\/etep.615"},{"key":"ref22","doi-asserted-by":"publisher","DOI":"10.1109\/TTE.2016.2633814"},{"key":"ref21","first-page":"818","article-title":"Transient processes time series analysis of high-speed railway power traction and over-voltage protection","author":"qu","year":"2012","journal-title":"Proc Int Conf Comput Distrib Control Intell Environ Monit"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2018.2870376"},{"key":"ref23","first-page":"339","article-title":"On the mathematical-description of arc behavior in the vicinity of current zero","volume":"10","author":"habedank","year":"1988","journal-title":"etz Arch"},{"key":"ref26","first-page":"137","article-title":"Research on model of rail potential distribution and its simulation","volume":"34","author":"yang","year":"2010","journal-title":"J Beijing Jiaotong Univ"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1109\/TPAS.1983.318062"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8600701\/08736728.pdf?arnumber=8736728","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,8,11]],"date-time":"2025-08-11T17:44:23Z","timestamp":1754934263000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8736728\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"references-count":28,"URL":"https:\/\/doi.org\/10.1109\/access.2019.2922980","relation":{},"ISSN":["2169-3536"],"issn-type":[{"type":"electronic","value":"2169-3536"}],"subject":[],"published":{"date-parts":[[2019]]}}}