{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,5]],"date-time":"2026-06-05T19:36:20Z","timestamp":1780688180553,"version":"3.54.1"},"reference-count":91,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2019,1,1]],"date-time":"2019-01-01T00:00:00Z","timestamp":1546300800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"name":"Baltic InteGrid Project"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2019]]},"DOI":"10.1109\/access.2019.2925873","type":"journal-article","created":{"date-parts":[[2019,7,11]],"date-time":"2019-07-11T19:04:36Z","timestamp":1562871876000},"page":"85796-85811","source":"Crossref","is-referenced-by-count":66,"title":["Electrical Cable Optimization in Offshore Wind Farms\u2014A Review"],"prefix":"10.1109","volume":"7","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-4388-7604","authenticated-orcid":false,"given":"Juan-Andres","family":"Perez-Rua","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-2438-1429","authenticated-orcid":false,"given":"Nicolaos A.","family":"Cutululis","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"key":"ref73","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg:20060017"},{"key":"ref72","doi-asserted-by":"publisher","DOI":"10.1287\/ijoc.15.1.82.15157"},{"key":"ref71","doi-asserted-by":"publisher","DOI":"10.1109\/PEDES.2016.7914458"},{"key":"ref70","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2016.2646061"},{"key":"ref76","author":"ahuja","year":"2008","journal-title":"Encyclopedia of Optimization"},{"key":"ref77","article-title":"Optimizing wind farm layout: More bang for the buck using mixed integer linear programming","author":"fagerfj\u00e4ll","year":"2010"},{"key":"ref74","doi-asserted-by":"publisher","DOI":"10.1109\/PESGM.2012.6344689"},{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1016\/0167-6105(94)90080-9"},{"key":"ref75","article-title":"Configuration study of large wind parks","author":"lundberg","year":"2003"},{"key":"ref38","first-page":"1","article-title":"Application of genetic algorithm in electrical system optimization for offshore wind farms","author":"chen","year":"2008","journal-title":"Proc 3rd Int Conf Electr Utility Deregulation Restructuring Power Technol"},{"key":"ref78","doi-asserted-by":"publisher","DOI":"10.7763\/JOCET.2016.V4.255"},{"key":"ref79","doi-asserted-by":"publisher","DOI":"10.1049\/cp.2012.1785"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1145\/3077839.3077843"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1002\/we.2077"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1109\/PTC.2013.6652477"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.4236\/ojce.2016.65057"},{"key":"ref37","author":"deb","year":"2012","journal-title":"Optimization For Engineering Design Algorithms and Examples"},{"key":"ref36","year":"2015","journal-title":"IBM ILOG CPLEX Optimization Studio?CPLEX Users Manual"},{"key":"ref35","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2016.08.094"},{"key":"ref34","article-title":"Ant-based algorithms for the wind farm cable layout problem","author":"nedlin","year":"2017"},{"key":"ref60","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-01854-6_12"},{"key":"ref62","doi-asserted-by":"publisher","DOI":"10.1080\/0305215X.2014.992892"},{"key":"ref61","doi-asserted-by":"crossref","first-page":"373","DOI":"10.1007\/s10479-017-2581-5","article-title":"Obstacle-aware optimization of offshore wind farm cable layouts","volume":"272","author":"klein","year":"2017","journal-title":"Ann Oper Res"},{"key":"ref63","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2593501"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1147\/sj.53.0142"},{"key":"ref64","doi-asserted-by":"publisher","DOI":"10.1109\/TC.1979.1675432"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.2307\/2033241"},{"key":"ref65","first-page":"793","article-title":"Sur la sphere vide","volume":"7","author":"delaunay","year":"1934","journal-title":"Nauk SSSR Otdelenie Matematicheskii i Estestvennyka Nauk"},{"key":"ref66","author":"hauptmann","year":"2015","journal-title":"A Compendium on Steiner Tree Problems"},{"key":"ref29","doi-asserted-by":"crossref","first-page":"1062","DOI":"10.1109\/T-C.1972.223452","article-title":"the design or multipoint linkages in a teleprocessing tree network","volume":"c 21","author":"chandy","year":"1972","journal-title":"IEEE Transactions on Computers"},{"key":"ref67","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2012.2185817"},{"key":"ref68","doi-asserted-by":"publisher","DOI":"10.1109\/PECI.2013.6506033"},{"key":"ref69","doi-asserted-by":"publisher","DOI":"10.1109\/ICEPE.2014.6970060"},{"key":"ref2","first-page":"16","year":"2016","journal-title":"Innovation Outlook Offshore Wind Summary for Policy Makers"},{"key":"ref1","year":"2017","journal-title":"Global Wind Report"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2018.09.038"},{"key":"ref22","author":"lawler","year":"1985","journal-title":"The Traveling Salesman Problem A Guided Tour of Combinatorial Optimization"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1145\/1103963.1103967"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1016\/j.neucom.2017.06.053"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1002\/net.3230040403"},{"key":"ref26","doi-asserted-by":"publisher","DOI":"10.1007\/BF01386390"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1002\/j.1538-7305.1957.tb01515.x"},{"key":"ref50","doi-asserted-by":"publisher","DOI":"10.1016\/j.endm.2018.01.013"},{"key":"ref51","author":"berzan","year":"2011","journal-title":"Algorithms for cable network design on large-scale wind farms"},{"key":"ref91","doi-asserted-by":"publisher","DOI":"10.1016\/j.egypro.2014.07.221"},{"key":"ref90","doi-asserted-by":"publisher","DOI":"10.1016\/j.egypro.2013.07.182"},{"key":"ref59","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2016.2549602"},{"key":"ref58","doi-asserted-by":"publisher","DOI":"10.1057\/s41274-016-0021-6"},{"key":"ref57","author":"wolsey","year":"2014","journal-title":"Integer and Combinatorial Optimization"},{"key":"ref56","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2017.07.061"},{"key":"ref55","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2004.03.011"},{"key":"ref54","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2521700"},{"key":"ref53","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg.2015.0340"},{"key":"ref52","doi-asserted-by":"publisher","DOI":"10.1049\/iet-rpg.2015.0052"},{"key":"ref10","year":"2014","journal-title":"IEC-60287-1 Electric Cables&#x2014;Calculation of the Current Rating"},{"key":"ref11","year":"2008","journal-title":"Calculation of the Cyclic and Emergency Current Rating of Cables"},{"key":"ref40","doi-asserted-by":"publisher","DOI":"10.1016\/j.renene.2013.03.024"},{"key":"ref12","article-title":"Current ratings of cables for cyclic and emergency loads. Part 1. Cyclic ratings (load factor less than 100%) and response to a step function","year":"1976","journal-title":"Tech Rep 24"},{"key":"ref13","article-title":"Working group B1.40, offshore generation cable connections","year":"2015","journal-title":"Tech Rep 1"},{"key":"ref14","first-page":"1","article-title":"Systematic description of dynamic load for cables for offshore wind farms. Method and experience","author":"kvarts","year":"2016"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2015.2469538"},{"key":"ref82","doi-asserted-by":"publisher","DOI":"10.1109\/SUPERGEN.2009.5348207"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1049\/oap-cired.2017.0922"},{"key":"ref81","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2012.2225077"},{"key":"ref17","article-title":"Dynamic loadability of cable based transmission grids","author":"olsen","year":"2013"},{"key":"ref84","doi-asserted-by":"publisher","DOI":"10.1109\/UPEC.2006.367720"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2017.2770321"},{"key":"ref83","article-title":"Optimizaci&#x00F3;n global de parques E&#x00F3;licos mediante algoritmos evolutivos","author":"mora","year":"2008"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/PMAPS.2018.8440351"},{"key":"ref80","first-page":"2476","article-title":"Optimization of internal electric connection system of large offshore wind farm with hybrid genetic and immune algorithm","author":"li","year":"2008","journal-title":"Proc 3rd Int Conf Deregulation Restruct Power Technol (DRPT)"},{"key":"ref89","doi-asserted-by":"publisher","DOI":"10.1002\/we.461"},{"key":"ref4","year":"2017","journal-title":"Rampion Suffers Cable Fault"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2012.02.054"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1002\/we.1498"},{"key":"ref5","year":"2018","journal-title":"RenewableUK&#x2014;Project Intelligence"},{"key":"ref85","first-page":"8","article-title":"Optimization of electrical system for a large DC offshore wind farm by genetic algorithm","author":"zhao","year":"2004","journal-title":"Proc Nordic Workshop Power Ind Electron"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.3390\/en7116930"},{"key":"ref86","doi-asserted-by":"publisher","DOI":"10.1109\/JSYST.2014.2330064"},{"key":"ref7","year":"2017","journal-title":"Decommissioning of World&#x2019;s First Offshore Site Now Complete"},{"key":"ref49","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-319-18161-5_3"},{"key":"ref87","first-page":"1","article-title":"Grid optimization for offshore wind farm layout and substation location","author":"moon","year":"2014","journal-title":"Proc IEEE Trans Elect Conf and Expo (ITEC"},{"key":"ref88","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2012.2199341"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1002\/wene.329"},{"key":"ref46","doi-asserted-by":"publisher","DOI":"10.1057\/jors.2013.188"},{"key":"ref45","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2010.2075944"},{"key":"ref48","doi-asserted-by":"publisher","DOI":"10.1109\/JSYST.2011.2163027"},{"key":"ref47","doi-asserted-by":"publisher","DOI":"10.1016\/j.disopt.2007.05.001"},{"key":"ref42","author":"grainger","year":"1994","journal-title":"Power System Analysis"},{"key":"ref41","doi-asserted-by":"publisher","DOI":"10.1016\/j.engappai.2017.01.010"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1002\/etep.4450130308"},{"key":"ref43","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2012.2204906"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8600701\/08751957.pdf?arnumber=8751957","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,8,10]],"date-time":"2021-08-10T19:40:32Z","timestamp":1628624432000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8751957\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"references-count":91,"URL":"https:\/\/doi.org\/10.1109\/access.2019.2925873","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019]]}}}