{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,13]],"date-time":"2026-02-13T21:35:50Z","timestamp":1771018550390,"version":"3.50.1"},"reference-count":33,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100012166","name":"National Basic Research Program of China","doi-asserted-by":"publisher","award":["2016YFC0402205"],"award-info":[{"award-number":["2016YFC0402205"]}],"id":[{"id":"10.13039\/501100012166","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001809","name":"Key Program of the Major Research Plan of the National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["91547208"],"award-info":[{"award-number":["91547208"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"name":"National Natural Science Foundation Key Project of China","award":["U1865202"],"award-info":[{"award-number":["U1865202"]}]},{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["51579107"],"award-info":[{"award-number":["51579107"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"name":"Science and Technology Project of State Grid Corporation","award":["SGHZ0000DKJS1900229"],"award-info":[{"award-number":["SGHZ0000DKJS1900229"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2020]]},"DOI":"10.1109\/access.2019.2931939","type":"journal-article","created":{"date-parts":[[2019,7,30]],"date-time":"2019-07-30T16:03:53Z","timestamp":1564502633000},"page":"132703-132720","source":"Crossref","is-referenced-by-count":9,"title":["Risks Analysis of Discarding Water in Power Generation Process of Hydropower Station"],"prefix":"10.1109","volume":"8","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-5536-0981","authenticated-orcid":false,"given":"Guangbiao","family":"Liu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jianzhong","family":"Zhou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yuqi","family":"Yang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Shenglin","family":"Ke","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Li","family":"Mo","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yongqiang","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Xiaogang","family":"Xiao","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1111\/j.2517-6161.1990.tb01775.x"},{"key":"ref32","doi-asserted-by":"publisher","DOI":"10.1007\/s004770050004"},{"key":"ref31","first-page":"3","article-title":"Weight function method for calculating hydrological frequency parameters","author":"ma","year":"1984","journal-title":"Hydrology"},{"key":"ref30","first-page":"44","article-title":"Comparative analysis of parameter estimating methods of Pearson Type-III distribution","volume":"25","year":"2008","journal-title":"Journal of Changjiang Engineering Vocational College"},{"key":"ref10","first-page":"1","article-title":"Grey-stochastic risk method for risk analysis","volume":"32","author":"guohua","year":"2001","journal-title":"J Hydraul Eng"},{"key":"ref11","first-page":"451","article-title":"Analysis on risk and benefit of adjusting limited reservoir water level for flood control","volume":"37","author":"feng","year":"2006","journal-title":"J Hydraul Eng"},{"key":"ref12","first-page":"94","article-title":"Short-term optimal regulation of hydropower plants with dynamic coherent risk measures","volume":"28","author":"liu","year":"2008","journal-title":"Proc Chinese Soc for Electrical Engineering"},{"key":"ref13","first-page":"61","article-title":"Study on monthly decomposition model of contract electric energy for cascade hydropower stations based on risk appetite","volume":"33","author":"yuan","year":"2014","journal-title":"J Hydroelectr Eng"},{"key":"ref14","first-page":"252","article-title":"Derivations of risk-based reservoir operation rule curves","volume":"32","author":"liu","year":"2013","journal-title":"J Hydroelectr Eng"},{"key":"ref15","first-page":"11","article-title":"Risk analysis and method research in the long-term reservoir dynamic probability scheduling","author":"xu","year":"2013","journal-title":"Science Mosaic"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/0022-1694(92)90222-H"},{"key":"ref17","first-page":"40","article-title":"Optimal scheduling of reservoirs considering surplus water risk","volume":"36","author":"xu","year":"2017","journal-title":"J Hydroelectr Eng"},{"key":"ref18","first-page":"88","article-title":"Abandoned water risk ratio control-based reservoir pre-discharge control method","volume":"47","author":"guo","year":"2016","journal-title":"Water Resources and Hydropower"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1007\/s11431-011-4392-2"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1016\/j.jhydrol.2008.03.003"},{"key":"ref4","article-title":"Study on long-term reservoir optimal scheduling and risk analysis","author":"zhang","year":"2008"},{"key":"ref27","first-page":"22","article-title":"Study on optimal dispatching conception based on discarded water probability","author":"xiao","year":"2015","journal-title":"Express water resources and hydropower information"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.11.047"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2006.882455"},{"key":"ref29","author":"zhang","year":"2010","journal-title":"Engineering Hydrology"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.05.010"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/0165-0114(88)90069-3"},{"key":"ref7","article-title":"Multi-objective optimal operation and multi-attribute risk decision making of cascaded hydropower stations","author":"hui","year":"2011"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1029\/WR016i002p00275"},{"key":"ref9","first-page":"906","article-title":"Fuzzy comprehensive assessment of water shortage risk","volume":"36","author":"ben-qing","year":"2005","journal-title":"J Hydraul Eng"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.enpol.2005.09.005"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1007\/s11431-010-3124-3"},{"key":"ref22","first-page":"23","article-title":"Optimal operation of cascade reservoir hydropower generation based on precipitation forecasts","volume":"35","author":"xu","year":"2016","journal-title":"J Hydroelectr Eng"},{"key":"ref21","first-page":"108","article-title":"Risk analysis of intercepting and storing flood tail for Shiquan reservoir in main flood season","volume":"23","author":"xi","year":"2004","journal-title":"J Hydroelectr Eng"},{"key":"ref24","first-page":"46","article-title":"Negotiation decision-making model for reservoir operation in flood season and its application","volume":"29","author":"wang","year":"2010","journal-title":"J Hydroelectr Eng"},{"key":"ref23","first-page":"16","article-title":"Application of minimal abandoned water model in optimal operation of cascade reservoirs","volume":"27","author":"yuan","year":"2008","journal-title":"J Hydroelectr Eng"},{"key":"ref26","first-page":"15","article-title":"Short term multi-objective optimization scheduling with dynamic water spillage strategy for cascade hydroelectric plants","volume":"31","author":"wu","year":"2011","journal-title":"Proc Chinese Soc for Electrical Engineering"},{"key":"ref25","doi-asserted-by":"crossref","first-page":"124","DOI":"10.1016\/j.jhydrol.2010.07.011","article-title":"Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty","volume":"391","author":"xiang","year":"2010","journal-title":"J Hydrol"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8948470\/08781782.pdf?arnumber=8781782","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,12]],"date-time":"2022-01-12T11:36:14Z","timestamp":1641987374000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8781782\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"references-count":33,"URL":"https:\/\/doi.org\/10.1109\/access.2019.2931939","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]}}}