{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,13]],"date-time":"2026-04-13T20:12:17Z","timestamp":1776111137485,"version":"3.50.1"},"reference-count":28,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["61873048"],"award-info":[{"award-number":["61873048"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100004543","name":"China Scholarship Council","doi-asserted-by":"publisher","award":["201906065025"],"award-info":[{"award-number":["201906065025"]}],"id":[{"id":"10.13039\/501100004543","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2020]]},"DOI":"10.1109\/access.2020.2974050","type":"journal-article","created":{"date-parts":[[2020,2,14]],"date-time":"2020-02-14T21:15:42Z","timestamp":1581714942000},"page":"33151-33162","source":"Crossref","is-referenced-by-count":18,"title":["Bilateral Coordinated Dispatch of Multiple Stakeholders in Deep Peak Regulation"],"prefix":"10.1109","volume":"8","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-5967-1373","authenticated-orcid":false,"given":"Feixiang","family":"Peng","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhengnan","family":"Gao","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-0980-1766","authenticated-orcid":false,"given":"Shubo","family":"Hu","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Wei","family":"Zhou","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1022-6735","authenticated-orcid":false,"given":"Hui","family":"Sun","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Zhonghui","family":"Wang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","doi-asserted-by":"crossref","first-page":"1657","DOI":"10.3390\/en11071657","article-title":"Optimization strategy for economic power dispatch utilizing retired EV batteries as flexible loads","volume":"11","author":"hu","year":"2018","journal-title":"Energies"},{"key":"ref11","first-page":"98","article-title":"Dispatch strategy for wind power accommodation considering coordination of power generation group stakeholders","volume":"42","author":"peng","year":"2018","journal-title":"Automat Electr Power Syst"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2018.12.026"},{"key":"ref13","year":"2018","journal-title":"Annual market update 2017 Global wind report"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1007\/s11356-019-04177-3"},{"key":"ref15","year":"2018","journal-title":"Guiding Opinions on Improving the Regulation Ability of Power System From National Energy Administration"},{"key":"ref16","year":"2019","journal-title":"What Technologies are Used in 22 Demonstration Projects of Thermal Power Flexibility Transformation?"},{"key":"ref17","first-page":"45","article-title":"Design of trading mechanism for peak shaving service considering participation of renewable energy","volume":"42","author":"yang","year":"2018","journal-title":"Autom Electr Power Syst"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.17775\/CSEEJPES.2015.01330"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1109\/CAC.2018.8623685"},{"key":"ref28","first-page":"87","article-title":"Research on the technology to improve the flexibility of thermal power plants","volume":"51","author":"su","year":"2018","journal-title":"Electronics& Power"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2911587"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2019.116826"},{"key":"ref3","year":"2015","journal-title":"China 2050 high renewable energy penetration scenario and roadmap study"},{"key":"ref6","article-title":"Global wind report 2018","author":"ohlenforst","year":"2019"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1186\/s41601-019-0132-6"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2010.2040636"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TIA.2019.2893836"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.2172\/1046880"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2779134"},{"key":"ref1","author":"schellekens","year":"2010","journal-title":"100% Renewable Electricity A Roadmap to 2050 for Europe and North Africa"},{"key":"ref20","first-page":"2789","article-title":"Deep peak regulation ancillary service bidding strategy for CHP units based on two-stage stochastic programming","volume":"43","author":"tian","year":"2019","journal-title":"Power Syst Technol"},{"key":"ref22","year":"2019","journal-title":"Polaris Wind Power Grid Northeast Wind Power Dilemma Power Auxiliary Service Beyond Income"},{"key":"ref21","first-page":"110","article-title":"Deep-peak regulation mechanism based on Kaldor improvement under high-penetration wind power","volume":"42","author":"jian","year":"2018","journal-title":"Autom Electr Power Syst"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1093\/oxfordjournals.oep.a041383"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2016.10.117"},{"key":"ref26","year":"2019","journal-title":"Operation Rules of Northeast Electric Power Auxiliary Service Market (Provisional)"},{"key":"ref25","first-page":"2135","article-title":"A model and algorithm for minimum probability interval of wind power forecast errors based on Beta distribution","volume":"35","author":"yang","year":"2015","journal-title":"Proc CSEE"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8948470\/08999597.pdf?arnumber=8999597","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,1,27]],"date-time":"2022-01-27T19:46:23Z","timestamp":1643312783000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/8999597\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"references-count":28,"URL":"https:\/\/doi.org\/10.1109\/access.2020.2974050","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]}}}