{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,29]],"date-time":"2026-04-29T04:58:16Z","timestamp":1777438696528,"version":"3.51.4"},"reference-count":29,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100012226","name":"Fundamental Research Funds for the Central Universities","doi-asserted-by":"publisher","award":["2018B05814"],"award-info":[{"award-number":["2018B05814"]}],"id":[{"id":"10.13039\/501100012226","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001809","name":"National Natural Science Foundation of China","doi-asserted-by":"publisher","award":["51877181"],"award-info":[{"award-number":["51877181"]}],"id":[{"id":"10.13039\/501100001809","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2020]]},"DOI":"10.1109\/access.2020.2993087","type":"journal-article","created":{"date-parts":[[2020,5,7]],"date-time":"2020-05-07T20:00:48Z","timestamp":1588881648000},"page":"87800-87809","source":"Crossref","is-referenced-by-count":10,"title":["Electric Power Distribution System Reliability Evaluation Considering the Impact of Weather on Component Failure and Pre-Arranged Maintenance"],"prefix":"10.1109","volume":"8","author":[{"given":"Yingjun","family":"Wu","sequence":"first","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tingting","family":"Fan","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5504-7848","authenticated-orcid":false,"given":"Tao","family":"Huang","sequence":"additional","affiliation":[],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"263","reference":[{"key":"ref10","year":"2017","journal-title":"Regular Annual Report for Ausgrid"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.mcm.2011.05.047"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1109\/61.974216"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1109\/DRPT.2011.5993862"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2038704"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2006.881131"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2019.2923454"},{"key":"ref17","first-page":"52","article-title":"Reliability evaluation of distribution systems with meshed network based on the minimum-cut set","volume":"39","author":"xiuli","year":"2011","journal-title":"Power Syst Protection Control"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2568751"},{"key":"ref19","first-page":"95","article-title":"Reliability modeling of battery energy storage system and its effect on the reliability of distribution system","volume":"41","author":"yufeng","year":"2013","journal-title":"Power Syst Protection Control"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1109\/CCECE.2005.1557007"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2010.08.022"},{"key":"ref27","first-page":"121","article-title":"EDS reliability assessment considering complex switching and pre-arrangement blackouts","volume":"35","author":"sm","year":"2011","journal-title":"Power Grid Technol News"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/JSYST.2015.2427454"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2012.10.055"},{"key":"ref29","author":"montgomery","year":"2007","journal-title":"Applied Statistics and Probability for Engineers"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2032234"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2008.926081"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2014.2339358"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2014.07.017"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2013.06.026"},{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2011.2179950"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/ICIT.2019.8755099"},{"key":"ref22","first-page":"40","article-title":"A multi-index synthetic assessment method for extreme climate events of sleeting and freezing with low temperature","volume":"34","author":"wan","year":"2008","journal-title":"Meteorological Monthly"},{"key":"ref21","first-page":"1","article-title":"Risk assessment based Life-Cycle-Cost model for distribution network","author":"zhao","year":"2012","journal-title":"Proc IEEE PES Innov Smart Grid Technol"},{"key":"ref24","doi-asserted-by":"publisher","DOI":"10.1049\/ip-gtd:20045058"},{"key":"ref23","first-page":"465","article-title":"Cascading fault graph for the analysis of transmission network vulnerability under different attacks","volume":"38","author":"wei","year":"2018","journal-title":"Proc Chin Soc Electr Eng"},{"key":"ref26","doi-asserted-by":"crossref","first-page":"499","DOI":"10.1049\/ip-gtd:20050427","article-title":"weather-based distribution system reliability evaluation","volume":"153","author":"billinton","year":"2006","journal-title":"Generation Transmission and Distribution IEE Proceedings-"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1080\/15325008.2016.1219428"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8948470\/09089232.pdf?arnumber=9089232","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,17]],"date-time":"2021-12-17T19:51:55Z","timestamp":1639770715000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9089232\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"references-count":29,"URL":"https:\/\/doi.org\/10.1109\/access.2020.2993087","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]}}}