{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,29]],"date-time":"2026-05-29T16:15:22Z","timestamp":1780071322027,"version":"3.54.0"},"reference-count":120,"publisher":"Institute of Electrical and Electronics Engineers (IEEE)","license":[{"start":{"date-parts":[[2020,1,1]],"date-time":"2020-01-01T00:00:00Z","timestamp":1577836800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/legalcode"}],"funder":[{"DOI":"10.13039\/501100002948","name":"High-Level Talent Fund of Hubei University of Technology","doi-asserted-by":"publisher","award":["BSQD2019016"],"award-info":[{"award-number":["BSQD2019016"]}],"id":[{"id":"10.13039\/501100002948","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["IEEE Access"],"published-print":{"date-parts":[[2020]]},"DOI":"10.1109\/access.2020.2996708","type":"journal-article","created":{"date-parts":[[2020,5,22]],"date-time":"2020-05-22T20:32:50Z","timestamp":1590179570000},"page":"98887-98909","source":"Crossref","is-referenced-by-count":41,"title":["Reliability Modeling and Evaluation of Urban Multi-Energy Systems: A Review of the State of the Art and Future Challenges"],"prefix":"10.1109","volume":"8","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-2224-7333","authenticated-orcid":false,"given":"Jun","family":"He","sequence":"first","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3152-5171","authenticated-orcid":false,"given":"Zhijun","family":"Yuan","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5827-1792","authenticated-orcid":false,"given":"Xiaoling","family":"Yang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1171-4423","authenticated-orcid":false,"given":"Wentao","family":"Huang","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-8719-6103","authenticated-orcid":false,"given":"Yicong","family":"Tu","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5996-8938","authenticated-orcid":false,"given":"Yi","family":"Li","sequence":"additional","affiliation":[],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"263","reference":[{"key":"ref39","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.03.106"},{"key":"ref38","doi-asserted-by":"publisher","DOI":"10.1109\/JIOT.2018.2869297"},{"key":"ref33","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2015.02.030"},{"key":"ref32","first-page":"102","article-title":"Degradation charging scenarios and impacts on voltage stability of urban distribution network under &#x2018;EV-road-grid&#x2019; coupling","volume":"39","author":"xinran","year":"2019","journal-title":"Electr Power Autom Equip"},{"key":"ref31","doi-asserted-by":"publisher","DOI":"10.1016\/j.trd.2019.08.006"},{"key":"ref30","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2018.01.078"},{"key":"ref37","doi-asserted-by":"publisher","DOI":"10.1109\/JIOT.2015.2478381"},{"key":"ref36","first-page":"1","article-title":"Review of reliability analysis for integrated energy systems with integration of cyber physical systems","volume":"43","author":"heping","year":"2019","journal-title":"Power Syst Technol"},{"key":"ref35","first-page":"3014","article-title":"Exploring the concept, key technologies and development model of energy Internet","volume":"39","author":"zhao","year":"2015","journal-title":"Power Syst Technol"},{"key":"ref34","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2019.2906650"},{"key":"ref28","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.113410"},{"key":"ref27","doi-asserted-by":"publisher","DOI":"10.1002\/er.4558"},{"key":"ref29","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)EY.1943-7897.0000443"},{"key":"ref20","doi-asserted-by":"publisher","DOI":"10.1109\/TII.2015.2423093"},{"key":"ref22","first-page":"6331","article-title":"Probabilistic energy flow analysis in integrated electricity and natural-gas energy systems","volume":"35","author":"chen","year":"2015","journal-title":"Proc CSEE"},{"key":"ref21","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2018.2828146"},{"key":"ref24","first-page":"165","article-title":"A review of operation of natural gas-electricity coupling system considering power-to-gas technology","volume":"43","author":"xun","year":"2019","journal-title":"Power Syst Technol"},{"key":"ref23","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2015.2424885"},{"key":"ref101","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2018.2876498"},{"key":"ref26","first-page":"1","article-title":"Optimizing operation of integrated electrical and gas network with power-to-gas process","volume":"34","author":"yanan","year":"2017","journal-title":"Modern Electr Power"},{"key":"ref100","first-page":"110","article-title":"Multi-index evaluation of integrated energy system with P2G planning","volume":"37","author":"lin","year":"2017","journal-title":"Electr Power Autom Equip"},{"key":"ref25","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2019.05.109"},{"key":"ref50","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2010.2046346"},{"key":"ref51","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2015.11.094"},{"key":"ref59","doi-asserted-by":"publisher","DOI":"10.1109\/JPROC.2010.2083610"},{"key":"ref58","doi-asserted-by":"crossref","first-page":"102","DOI":"10.1016\/j.ijepes.2018.05.021","article-title":"Risk assessment of integrated energy system based on electrical-thermal energy flow","volume":"39","author":"wang","year":"2018","journal-title":"Electr Power Construct"},{"key":"ref57","first-page":"59","article-title":"Analytic method for power supply reliability assessment of electricity-gas coupled energy system","volume":"42","author":"juanwei","year":"2018","journal-title":"Autom Electr Power Syst"},{"key":"ref56","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2018.07.153"},{"key":"ref55","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2017.06.113"},{"key":"ref54","doi-asserted-by":"publisher","DOI":"10.1016\/j.energy.2017.06.090"},{"key":"ref53","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2018.2848970"},{"key":"ref52","first-page":"1481","article-title":"Power system cyber-physical modelling and security assessment: Motivation and ideas","volume":"36","author":"qinglai","year":"2016","journal-title":"Proc CSEE"},{"key":"ref40","first-page":"21","article-title":"Review of coupled system between power and natural gas network","volume":"42","author":"zijuan","year":"2018","journal-title":"Autom Electr Power Syst"},{"key":"ref4","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2015.08.008"},{"key":"ref3","doi-asserted-by":"crossref","first-page":"1025","DOI":"10.1038\/nature08932","article-title":"Catastrophic cascade of failures in interdependent networks","volume":"464","author":"buldyrev","year":"2010","journal-title":"Nature"},{"key":"ref6","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2656131"},{"key":"ref5","first-page":"7","article-title":"Research on reliability assessment methods for large gas pipeline network","volume":"35","author":"huai","year":"2016","journal-title":"Oil & Gas Storage and Transportation"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2017.2746180"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2018.2791807"},{"key":"ref49","first-page":"3081","article-title":"Optimal scheduling method of multi-network regional integrated energy system based on traffic flow uncertainty","volume":"43","author":"jinhui","year":"2019","journal-title":"Power Syst Technol"},{"key":"ref9","first-page":"335","article-title":"Reliability evaluation of dendritic gas pipeline network","volume":"31","author":"siding","year":"2012","journal-title":"Oil & Gas Storage and Transportation"},{"key":"ref46","first-page":"2","article-title":"Coordinated optimization of integrated electricity-gas energy system considering uncertainty of renewable energy output","volume":"43","author":"jing","year":"2019","journal-title":"Autom Electr Power Syst"},{"key":"ref45","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2011.2175490"},{"key":"ref48","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2015.2396524"},{"key":"ref47","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2549747"},{"key":"ref42","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2015.08.089"},{"key":"ref41","first-page":"85","article-title":"Hierachical control strategy of regional energy network considering electrical-thermal coupling characteristics","volume":"12","author":"renbo","year":"2018","journal-title":"Southern Power Syst Technol"},{"key":"ref44","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2905772"},{"key":"ref43","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)EY.1943-7897.0000475"},{"key":"ref73","first-page":"143","article-title":"An overview of the short-term reliability evaluation of power system","volume":"39","author":"yu","year":"2011","journal-title":"Power Syst Protection Control"},{"key":"ref72","doi-asserted-by":"publisher","DOI":"10.1016\/j.enbuild.2014.09.056"},{"key":"ref71","first-page":"95","article-title":"Hybrid modeland data driven concepts for power system security features election and knowledge discovery: Key technologies and engineering application","volume":"43","author":"tianen","year":"2019","journal-title":"Autom Electr Power Syst"},{"key":"ref70","doi-asserted-by":"crossref","first-page":"36","DOI":"10.1016\/j.apenergy.2019.01.013","article-title":"A deep spatial-temporal data-driven approach considering microclimates for power system security assessment","volume":"237","author":"huang","year":"2019","journal-title":"Appl Energy"},{"key":"ref76","doi-asserted-by":"crossref","first-page":"265","DOI":"10.1016\/0032-5910(85)80023-1","article-title":"Operational reliability analysis of distribution network based on big data technology","volume":"41","author":"hu","year":"2017","journal-title":"Power Syst Technol"},{"key":"ref77","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2011.06.021"},{"key":"ref74","first-page":"9","article-title":"Reliability evaluation of complicated distribution systems","volume":"34","author":"zhaohong","year":"2000","journal-title":"J Xi&#x2019;an Jiaotong Univ"},{"key":"ref75","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2014.2307919"},{"key":"ref78","doi-asserted-by":"publisher","DOI":"10.1016\/j.enconman.2019.111988"},{"key":"ref79","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2017.06.081"},{"key":"ref60","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2018.09.097"},{"key":"ref62","doi-asserted-by":"crossref","first-page":"1402","DOI":"10.1016\/j.apenergy.2019.04.192","article-title":"Modeling building resilience against extreme weather by integrated CityFFD and CityBEM simulations","volume":"250","author":"katal","year":"2019","journal-title":"Appl Energy"},{"key":"ref61","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2018.03.038"},{"key":"ref63","doi-asserted-by":"crossref","first-page":"764","DOI":"10.1016\/j.apenergy.2018.10.070","article-title":"Energy flexibility of a nearly zero-energy building with weather predictive control on a convective building energy system and evaluated with different metrics","volume":"233","author":"liu","year":"2019","journal-title":"Appl Energy"},{"key":"ref64","first-page":"1","article-title":"Reliability evaluation of integrated energy system based on Markov process Monte Carlo method","author":"ni","year":"2019","journal-title":"Power Syst Technol"},{"key":"ref65","first-page":"104","article-title":"Reliability evaluation of integrated community energy system based on particle-swarm-interior-point hybrid optimization algorithm","volume":"38","author":"chi","year":"2017","journal-title":"Electr Power Construct"},{"key":"ref66","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2015.11.033"},{"key":"ref67","doi-asserted-by":"publisher","DOI":"10.1002\/er.4384"},{"key":"ref68","first-page":"2","article-title":"Review on application of artifical intelligence in power system and integrated energy system","volume":"43","author":"ting","year":"2019","journal-title":"Automat Electr Power Syst"},{"key":"ref69","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2015.10.015"},{"key":"ref2","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2013.2281137"},{"key":"ref1","first-page":"114","article-title":"Research status and prospects on reliability evaluation of integrated energy system","volume":"43","author":"li","year":"2017","journal-title":"Gaodianya Jishu\/High Voltage Engineering"},{"key":"ref109","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2009.2037232"},{"key":"ref95","first-page":"56","article-title":"Novel model and multistage algorithm for distribution network reconfiguration considering system reliability","volume":"35","author":"yuqing","year":"2011","journal-title":"Autom Electr Power Syst"},{"key":"ref108","doi-asserted-by":"publisher","DOI":"10.1007\/s40565-018-0377-5"},{"key":"ref94","first-page":"48","article-title":"Reliability consideration of distribution network reconfiguration with electric vehicles","volume":"40","author":"cunlu","year":"2019","journal-title":"Process Autom Instrum"},{"key":"ref107","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijepes.2019.105601"},{"key":"ref93","first-page":"1","article-title":"Research on sitingplanning evaluation system of electric vehicle charging station","volume":"53","author":"liu","year":"2016","journal-title":"Elect Meas Instrum"},{"key":"ref106","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2018.2888605"},{"key":"ref92","first-page":"117","article-title":"Study on decision-making and evaluation of location of electrical vehicle charging stations","volume":"34","author":"meng","year":"2015","journal-title":"Logistics Technology"},{"key":"ref105","doi-asserted-by":"publisher","DOI":"10.1109\/ACCESS.2019.2924828"},{"key":"ref91","first-page":"313","article-title":"Research on site selection for electric vehicle charging stations based on AHP and fuzzy evaluation method","volume":"37","author":"long","year":"2015","journal-title":"Heilongjiang Electric Power"},{"key":"ref104","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2017.05.150"},{"key":"ref90","doi-asserted-by":"publisher","DOI":"10.3390\/en9030157"},{"key":"ref103","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2017.01.103"},{"key":"ref102","doi-asserted-by":"publisher","DOI":"10.1016\/j.jclepro.2018.02.101"},{"key":"ref111","doi-asserted-by":"publisher","DOI":"10.1016\/j.ssci.2019.02.009"},{"key":"ref112","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2018.2825780"},{"key":"ref110","doi-asserted-by":"publisher","DOI":"10.1109\/TCOMM.2017.2709302"},{"key":"ref98","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2011.2157948"},{"key":"ref99","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRD.2015.2426205"},{"key":"ref96","article-title":"Fast reliability evaluation and reconfiguration of distribution network","author":"yuqing","year":"2011"},{"key":"ref97","doi-asserted-by":"publisher","DOI":"10.1016\/j.ress.2010.06.011"},{"key":"ref10","first-page":"738","article-title":"A reliability evaluation system of complex gas pipeline networksystem in the operation period","volume":"38","author":"li","year":"2019","journal-title":"Oil & Gas Storage and Transportation"},{"key":"ref11","doi-asserted-by":"publisher","DOI":"10.1016\/j.tust.2017.02.009"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2017.08.099"},{"key":"ref13","first-page":"708","article-title":"Reliability evaluation of integrated electrical and natural-gas system with power-to-gas","volume":"38","author":"juan","year":"2018","journal-title":"Proc CSEE"},{"key":"ref14","first-page":"9","article-title":"Reliability evaluation of integrated energy system consider thermal inertia and operation strategy","volume":"42","author":"jiawei","year":"2018","journal-title":"Autom Electr Power Syst"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2014.2314616"},{"key":"ref118","doi-asserted-by":"publisher","DOI":"10.1016\/j.physa.2019.121865"},{"key":"ref82","first-page":"135","article-title":"Modelling of cascading failure and reliability simulation of urban agglomeration traffic network","volume":"35","author":"cheng-bing","year":"2018","journal-title":"J Highway Transp Res Develop"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2572159"},{"key":"ref117","doi-asserted-by":"publisher","DOI":"10.1016\/j.chaos.2013.08.007"},{"key":"ref81","first-page":"67","article-title":"General description of evaluation techniques of road network reliability","volume":"6","author":"jianjun","year":"2008","journal-title":"Urban China in Transition"},{"key":"ref17","first-page":"13","article-title":"Research on information communication network of user side in energy interconnection","volume":"14","author":"jianqi","year":"2016","journal-title":"Electr Power Inf Commun Technol"},{"key":"ref84","first-page":"66","article-title":"Connection reliability analysis of road network based on the speed-density model","volume":"11","author":"yulong","year":"2013","journal-title":"Urban China in Transition"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1109\/TSTE.2018.2870561"},{"key":"ref119","doi-asserted-by":"publisher","DOI":"10.3390\/su11154048"},{"key":"ref83","first-page":"10","article-title":"An improved transportation network reliability model under a certain level of risk","author":"rao","year":"2016","journal-title":"Proc 11th Annu China Intell Transp Conf"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.1016\/j.jpowsour.2019.226824"},{"key":"ref114","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2019.01.022"},{"key":"ref113","doi-asserted-by":"publisher","DOI":"10.1007\/s00158-017-1651-2"},{"key":"ref116","doi-asserted-by":"publisher","DOI":"10.1016\/j.apenergy.2016.10.086"},{"key":"ref80","first-page":"59","article-title":"Multimodal transport channels and network reliability of urban agglomeration","volume":"41","author":"tianxing","year":"2019","journal-title":"China Transp Rev"},{"key":"ref115","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2018.2858234"},{"key":"ref120","doi-asserted-by":"publisher","DOI":"10.1109\/TSG.2018.2870358"},{"key":"ref89","first-page":"25","article-title":"Application of comprehensive evaluation method integrating Delphi and GAHP in optimal siting of electric vehicle charging station","volume":"32","author":"feng","year":"2012","journal-title":"Electr Power Autom Equip"},{"key":"ref85","first-page":"1641","article-title":"New definition of reliability index and algorithm for a communication network","volume":"28","author":"fu-sheng","year":"1651","journal-title":"Syst Eng Electron"},{"key":"ref86","doi-asserted-by":"publisher","DOI":"10.1109\/TPWRS.2016.2582684"},{"key":"ref87","doi-asserted-by":"publisher","DOI":"10.17775\/CSEEJPES.2018.00320"},{"key":"ref88","first-page":"1049","article-title":"Reconfiguration strategy for active distribution network considering spatial-temporal electrical vehicle load model","volume":"43","author":"chen","year":"2017","journal-title":"High Voltage Eng"}],"container-title":["IEEE Access"],"original-title":[],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx7\/6287639\/8948470\/09098880.pdf?arnumber=9098880","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,12,17]],"date-time":"2021-12-17T19:52:14Z","timestamp":1639770734000},"score":1,"resource":{"primary":{"URL":"https:\/\/ieeexplore.ieee.org\/document\/9098880\/"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2020]]},"references-count":120,"URL":"https:\/\/doi.org\/10.1109\/access.2020.2996708","relation":{},"ISSN":["2169-3536"],"issn-type":[{"value":"2169-3536","type":"electronic"}],"subject":[],"published":{"date-parts":[[2020]]}}}